EFFECT OF PROJECT MONITORING PRACTICES ON IMPLEMENTATION OF ROAD CONSTRUCTION PROJECTS. A CASE STUDY OF KILIFI COUNTY

MARGARET MUNINI MUTUA, JACOB JUMA, DR. DATCHE OWUOR (Ph.D)

Abstract


The general objective of the study was to evaluate the effect of project monitoring practices on implementation of road construction projects. The study was carried out in Kilifi County, Kenya. This study was guided by the following specific objectives; determine the effect of communication, determine the effect of monitoring tools, investigate the influence of stakeholder’s participation, establish the effect of staff competency on implementation of road construction projects in Kilifi County. The research study adopted a descriptive research design targeting 150 project managers, committee members, monitoring committee employees of (KeNHA, KeRRA, KURA and KWS) and stakeholders in Kilifi County. A closed ended structured questionnaire was used to collect primary data from 109 sampled respondents. A pilot study was conducted to ascertain the reliability and validity of the instruments. The quality and consistency of the study was further assessed using Cronbach’s alpha. Data analysis was performed using Statistical Package for Social Science (SPSS) version 23. Data presentation was done using frequency counts, percentages, means, standard deviations, regression, correlation and the information was presented in form of tables. The findings of correlation analysis indicated that the project monitoring practices had positive and significant relationship with project implementation. The study, thus, concluded that thoroughness in project monitoring practices enhances road construction project implementation in Kilifi County: Perfection in project communication, project monitoring tools and techniques, staff competency and stakeholders participations, being the pillars, is imperative. The study recommended that road construction agencies adopt and invest in the same to enhance efficiency in project monitoring practices and implementation of road construction projects in Kilifi County.

Key Words: Communication, Monitoring Tools, Stakeholder’s Participation, Staff Competency

CITATION: Mutua, M. M., Juma , J., & Owuor, D. (2020). Effect of project monitoring practices on implementation of road construction projects. A case study of Kilifi County. The Strategic Journal of Business & Change Management, 7(1), 664 – 685.


Full Text:

PDF

References


Agevi, (2013). Resource Requirements and Environmental Dependency. European Scientific Journal, 12(2), 91-114.

Aibinu, A.A., Jagboro.G.O. (2012).The effects of construction delays on project delivery in Nigerian Construction Industry. International Journal of Project Management, 20(2), 593-599.

Alhyari, S., Alazab, M., Venkatraman, S., Alazab, M. & Alazab, A. (2013). “Performance evaluation of e-government services using balanced scorecard: An empirical study in Jordan", Benchmarking: An International Journal, 20 (4) ,512 – 536.

Alinaitwe, H., Apolot, R., & Tindiwensi, D. (2013). Investigation into the Causes of Delays and Cost Overruns in Uganda’s Public Sector Construction Projects. Journal of Construction in Developing Countries, 18(3), 33-47.

Alotaibi, M. (2011). Evaluation of contractor performance for pre-selection in the Kingdom of Saudi (Doctoral dissertation). Loughborough University, Leicestershire, UK.

Asaka, C. N., Aila, F. O., Odera, O., & Abongo, B. E. (2012). Projects selection and management implications in Kenyan local authorities. Asian Journal of Business and Management Sciences, 1(10), 65-75.

Azimi R, Lee S, AbouRizk SM., & Alvanchi A. (2011). A framework for an automated and integrated project monitoring and control system for steel fabrication projects. Automation in Construction, 20(1), 88-97.

Aziz, R. F. (2013). Factors causing cost variation for constructing wastewater projects in Egypt. Alexandria Engineering Journal, 52(5), 51-66.

Booth, D. and Mutebi, F.-G. (2015). Reforming the Roads Sector in Uganda; A Six Year Retrospective.

Bourne, L. (2015). Communication Planning – Series on effective stakeholder engagement. PM World Journal, 5(10), 52-58.

Bryman, A., & Bell, E. (2015). Business Research Methods (3 ed.). New York, United States: Oxford University Press Inc.

Burke, R. (2013). Project management: planning and control techniques.

Bygrave, D. (2014). The entrepreneurial process, the portable MBA in, entrepreneurship, Hoboken, NJ: John Wiley and Sons: 5-6.

Centre for Learning on Evaluation and Results (CLEAR) Initiative at Wits. (2013). Demand and Supply: Monitoring, Evaluation, and Performance Management Information and Services in Anglophone Sub-Saharan Africa, A Synthesis of Nine Studies. Johannesburg, South Africa: Graduate School of Public and Development Management, University of Witwatersrand.

Chapman, A. (2014). Project management, tools, process, plans and project planning tips” available from http://www.businessballs.com/project.htm, accessed 8-3-2019.

Charles, G.K. (2015). Human Bin Mohamed. Efficacy of Monitoring and Evaluation Function in Achieving Project Success in Kenya: A conceptual framework. Science journal of business and management, 3(3), 82-94.

Chin CMM (2012). Development of a Project Management Methodology for Use in a University-Industry Collaborative Research Environment (Doctoral Dissertation). University of Nottingham, Semenyih Selangor Darul Ehsan, Malaysia.

Creswell, J. W. (2013). Research design: A qualitative, quantitative, and mixed method approaches. Sage publications.

David, J. (2013). Secrets Behind Successful Management of Infrastructure projects in Columbia. European Journal of Business Management, 1(11), 20-24.

Dinsmore, P. & Cabanis-Brewin, J. (2014). AMA Handbook of Project Management (4th Edition). USA: AMACON Books. Edition. http://knowledge.apm.org.uk

Elsaid, N., Okasha, A. & Abdelghaly, A. (2013). Defining and Solving the Organizational Structure Problems to Improve the Performance of Ministry of State for Environmental Affairs – Egypt. International Journal of Scientific and Research Publications, 3(10), 49-52.

Eskerod, P. & Lund Jepsen, A. (2013). Fundamentals of Project Management: Project Stakeholder Management. England: Gower Publishing Limited. USA: Gower Publishing Limited.

Fapohunda, J. A, & Stephenson, P. (2010). Optimal construction resources utilization: Reflections of site managers‟ attributes. Pacific Journal of Science and Technology. 11(2), 353-365.

Gaba, G. (2013). The impact of project delivery systems, cost minimizations and project control on construction project success. Evidence from Ghana. Master’s Thesis: University College London, United.

Ghasemi, A., & Zahediasl, S. (2012). Normality tests for statistical analysis: a guide for non-statisticians. International journal of endocrinology and metabolism, 10(2), 486-489.

Government of Kenya [GOK]. (2013). Medium term plan cycle (2013-2017). Whose theme is―Transforming Kenya: Pathways to Devolution, Socio-economic Development, Equity and National Unity.

Hansson, S.O. (2013). Decision Theory: A Brief Introduction. Department of Philosophy and the History of Technology. Royal Institute of Technology, Stockholm. http://people.kth.se/~soh/decisiontheory.pdf.

Harold K. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (8th Ed. ed.). Wiley.ISBN 0-471-22577-0.

Harris, J., Croot, L., Thompson, J and Springett, J. (2015). How stakeholder participation can contribute to systematic reviews of complex interventions, Epidemiol Community Health, 0:1–8. doi: 10.1136/jech-2015-20570.

Hilson, D. & Murray, W. (2012). Scaling the PEAKS of Project Management Competency; PMI Europe. The Project Management Festival, 19-20.

http://smallbusiness.chron.com/effective-communication-organization-400.html. Accessed on 12.10.2019. http://thecommunicationprocess.com/models-of-communication/.

Hwang B, Lim E (2013). Critical success factors for key project players and objectives: Case study of Singapore. J. Constr. Eng. Manage, 139(2), 204-215.

Ika LA, Diallo A, Thuillier D (2012). Critical success factors for World Bank projects: an empirical improved Governance and Human Development. A paper presented at 2nd International Conference on Implementing and Evaluating Effective Communication. USA: Ash gate Publishing.

Isaac S, Navon R (2013). Can project monitoring and control be fully automated?. Construction Management and Economics, (ahead-of-print), 1-11.

Iyer K. & Jha N., (2005). Factors affecting cost performance: evidence from Indian construction projects, International Journal of Project Management, 23(11), 283-295

Jaszczolt, K. & Potkanski, T (2010). Internal project M&E systems and development of evaluation capacity. Experience of World Bank funded rural programs.

Johannessen, J. & Olsen, B. (2017). Projects as communicating systems: Creating a culture of innovation and performance, International Journal of Information Management 31 (2011) 30–37. http://www.sciencedirect.com/science/article/pii/S0268401210000617.

John Wiley & Sons. Schibi, O. (2013). Managing Stakeholder Expectations for Project Success: A Knowledge Integration Framework and Value Focused Approach. USA: J. Ross Publishing.

Jones, N. et al. (2017). Improving Impact Evaluation Coordination and Use. A Scoping Study Journal, 5(2), 87 – 101.

Kariungi, S. M. (2014). Determinants of Timely Completion of Projects in Kenya: A Case of Kenya Power and Lighting Company, Thika. ABC Journal of Advanced Research, 3(2), 9-19.

Kasaija, M. (2015). Budget Speech Financial Year 2015/16. Ministry of Finance, Planning and Economic Development, Kampala.

Katharine, M. & John, R (2011). Monitoring & evaluation in the United States Government: Evaluation capacity development working paper series, no.26.

Kenya National Bureau of Statistics (KNBS). (2015). Economic Survey 2014. Nairobi: Government Printers The Kenya Roads Act. (2007). Kenya Gazette. Retrieved from Kenya Law Website:

Kenya National Bureau of Statistics. (2012). Kenya Facts and Figures. Nairobi, Kenya.

Kenya Roads Board. (2013). Annual Public Roads Programme: Financial Year 2012/2013. GoK Press.

Kenya Social Protection Sector Review (2012). Ministry of state for planning, National Development and vision 2030. Republic of Kenya.

Kenyatta Obegi., Ahmad O. A., Mbiti T.K. (2015). International Journal of Soft Computing and Engineering (IJSCE) ISSN: 2231-2307, Volume-5 Issue-4.

Kibebe, L. W., & Mwirigi, P. W. (2014). Selected Factors Influencing Effective Implementation of Constituency Development Fund (CDF) Projects in Kimilili Constituency, Bungoma County, Kenya. International Journal of Science and Research, 3 (1), 44-48.

Kikwasi, G.J. (2017). ‘Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania. Australasian Journal of Construction Economics and Building, Conference Series, (2) 52B59Kingdom. Knowledge Integration Framework and Value Focused Approach. USA: J. Ross Publishing.

Kobusingye, B. (2017). Influence of stakeholders’ involvement on project outcomes: A Case of Water, Sanitation, and Hygiene (Wash) Project in Rwanda. European Journal of Business and Social Sciences, 6(6), 195-206.

Kontinen T, Robinson-Moncada S (2014). Towards New Practices of Monitoring in World Vision Finland: Pathways of Empowerment.

Kontinen, T., & Robinson-Moncada, S. (2014). towards new practices of monitoring in World Vision Finland: Pathways of empowerment.

Kothari, C. R., & Garg, G. (2014). Research methodology methods and techniques (3rded.). New Dellhi: New Age International (P) Ltd.

Length, (2014). Effects of Failure to Supervise Project Activities. International Journal of Project Management, 12(4), 94-106.

Leyman, G. (2013). Effects of Project Competency Skills in Large Swedish organizations. Journal of operation management 25, 765-786Magd, H. A. (2008). ISO 9001: 2000 in the Egyptian manufacturing sector: perceptions and perspectives. International Journal of Quality & Reliability Management, 25(2), 173-200.

Ling, Y., Low, P., Wang, Q. & Lim, H. (2011). Key project management practices affecting Singaporean firms, project performance in China. International Journal of Project Management.

Lukasiewicz, A and Baldwin, C. (2017). Voice, power, and history: ensuring social justice for all stakeholders in water decision-making, Local Environment, 22:9, 1042-1060, DOI: 10.1080/13549839.2014.942261. 2017.

Madukani, R. (2013). Results based strategic leadership: strategic leadership and determinants of firm performance, Hoboken, NJ: John Wiley and Sons.

Magondu, A. (2013). Factors influencing implementation of monitoring and evaluation in HIV research projects. A case of Kenya Aids Vaccines Initiative (Kavi). University of Nairobi, Kenya. 161

Mahmoud-Jouini, S., Midler, C., & Silberzahn, P. (2016). Contributions of Design Thinking to Project Management in an Innovation Context. Project Management Journal, 47(2), 144-156.

Maina, B. M. (2016). Influence of Stakeholders’ Participation on the Success of the Economic Stimulus Programme: A Case of Education Projects in Nakuru County. Kenya.

Mambo, S. & Charagu, K. (2013). Collapse of Road Construction Structures. IEK presentation.

Marshall, C., & Rossman, G. B. (2014). Designing qualitative research. Sage publications.

Mbeche IM (2011). Critical success factors of industrial and commercial projects in Kenya. Operations Research Society of Eastern Africa Journal, 1(1), 93-108.

Mladenovic, G., Vajdic, N., Wündsch, B., & Salaj, A. T. (2013). Use of Key performance indicators for PPP transport projects to meet stakeholders’ performance objectives. Built Environment Project and Asset Management, 3(2), 228-249.

Mohammed, E. (2012). Role of Project Managers in Resource and Work Allocation in Project Management. European Management Journal, 21(3), 369-395.

Muchelule. Y, Mbawi G. Muchelule S., Achayo (2018). Influence of Monitoring and Evaluation on Performance of Constituency Development Fund Projects In Kajiado East Sub-County, Kenya. The International Journal of Management Science and Information Technology (IJMSIT), 30(23), 35-45.

Mutua, M. F. (2015). Influence of Beneficiary Participation on Effective Monitoring and Evaluation of Community Based Water Projects in Kenya: The Case of Kiabaibate-Nchura in Tigania West Sub-County. Unpublished Master’s Thesis, University of Nairobi. 2015.

Mwandali, K. (2013). "Implementing a new Performance Management System within a Project-Based Organization: A case study", International Journal of Productivity and Performance Management, 56 (1), 60 – 75.

Mwangi, W. (2015). Monitoring and Evaluation: Factors Influencing the Performance of Road Infrastructural Projects: A Case Study of Nyandarua County, Kenya.

Naidoo, I. A. (2011). The Role of Monitoring and Evaluation in Promoting Good Governance in South Africa: A Case Study of the Department of Social Development. Doctoral dissertation: University of Witwatersrand.

Njenga, B. K. (2014). Factors influencing effective and efficient delivery of road construction projects in Kenya: A Case of Nairobi County. Unpublished MAPPM, University of Nairobi.

Njogu, E.M. (2016). Influence of stakeholders’ involvement on project performance: A Case of Nema Automobile Emmission Control Project in Nairobi County, Kenya. Retrieved from http://erepository.uonbi.ac.ke/bitstream/handle/11295/99866/

Ochieng M. F., & Tubey, D. (2013). Effectiveness of Monitoring and Evaluation of CDF Projects in Kenya: A case of Ainamoi Constituency. International Journal of Arts and Commerce, 12(4), 45-66.

Odeyinka, H. and Yusuf, A. (2014). The causes and effects of delays on infrastructure projects. Journal of financial management, 3(5), 35-43.

OECD (2018). Monitoring tool. For Tracking Progress of Reform Implementation Economic Reform Programme.

OECD. (2012). Glossary of Key terms in Evaluation and Results based Management. Paris:

Olatunji, A. A. (2010). Influences on construction project delivery time. PhD. Thesis: Nelson Mandela Metropolitan University, Estern Cape, South Africa.

Oluka, P. and Basheka, B. (2014) Determinants and Constrains to Effective Procurement Contract Management in Uganda; A Practioner’s Prespective. International Journal of Logistics Systems and Management, 17(2), 104-124.

Omran, A., Abdalrahman, S., Pakir, A.H.K. (2015). Project Performance in Sudan Construction Industry: A Case Study, Academic Research Journals (India), 1(1), 55-78.

Ondari, P. O., & Gekara, J. M. (2013). Factors influencing successful completion of roads projects in Kenya. International Journal of Arts and Entrepreneurship, 1(5), 1-22.

PASSIA. (2013). Civil Society empowerment: Monitoring an Evaluation www.passia.org/seminars/2002/monitoring.htm (Accessed on 21/4/2019).

Paulines Publications’ Africa, Nairobi. People and Business Processes. USA: John & Wiley Sons Incorporated.

Phillips, M. (2014). Reinventing Communication: How to Design, Lead and Man-age High Performing Projects. England: Gower Publishing Limited. USA: Gower Publishing Limited.

Phillips, M. (2014). Reinventing Communication: How to Design, Lead and Man-age High Performing Projects. England: Gower Publishing Limited. USA: Gower

Pickett, JT, Cullen, FT, Bushway, SD, Chiricos, T & Alpert, G (2018) The Response rate test: Nonresponsive bias and the future of survey research in criminology and criminal justice. The Criminologist, 43(1), 7-11.

Pilcher, R (2012). Preicioles of Construction Management (3rd Edition). McGraw-Hill Books Company, Berkshire, England

Pilkington, A. (2013). Communicating Projects: An End-to-End Guide to Planning, Implementing and Evaluating Effective Communication. USA: Ashgate Publishing.

Project Management Institute (2013). Project Management Body of Knowledge 5th edition. USA: Project Management Institute.

Project Management Institute. (2014). Navigating Complexity: A Practice Guide. Pennsylvania, USA: Author. Project Management, 21(5): 363 – 373.

Rahman, A.R. (2013). Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia. Journal of Applied Sciences, 13(2), 286-293.

Ramothamo, S.S. (2013). Monitoring and evaluation of HIV/AIDS donor funded projects.

Richards, L. (2015). How Effective Communication Will Help an Organization. Small Business. Business Communication Etiquette. Effective Communication & Organization. http://smallbusiness.chron.com/effective-communication-organization-1400.html.Accessed 12.11.2019.

Roeder, T. (2013). Managing Project Stakeholders: Building a Foundation to Achieve Project Goals. USA: John & Wiley Sons.

Ruwa, M. C. (2016). The Influence of Stakeholder Participation on the Performance of Donor Funded Projects: A Case of Kinango Integrated Food Security and Livelihood Project (Kifslp), Kwale County, Kenya. Retrieved from http://erepository.uonbi.ac.ke/bitstream/handle/11295/99898/

Saladis, F. & Kerzner, H. (2011). Bringing the PMBOK Guide to Life: A Companion for the Practicing Project Manager. USA:

Sambasivan, M., & Soon, Y. W. (2014). Causes and effects of delays in Malaysian construction industry, International Journal of Project Management, 25, 517 – 526.

Schwab, D. P. (2013). Research methods for organizational studies. Psychology Press.

Schwalbe, K. (2013). Revised an Introduction to Project Management, Fourth Edition. USA: Schwalbe Publishing. 54 Small Business. Business Communication Etiquette. Effective Communication& Organization. http://smallbusiness.chron.com/effective-communication-organization-1400.html. Accessed 12.11.2018.

Ssebanakitta, P. (2013). Impact of Procurement Reforms on Procurement of Works in Uganda. Journal of Public Procurement and Contract Management, 110-105.

Tabassi, A.A.; Roufechaei, K.M.; Ramli, M.; Bakar, A.H.A.; Ismail, R.; Pakir, A.H.K. (2016). Leadership competences of sustainable construction project managers. J. Clean. Prod. , 124, 339–349.

Thamhain, H. (2014). Managing Technology-Based Projects: Tools, Techniques, People and Business Processes. USA: John & Wiley Sons Incorporated.

Thamhain, H. (2014). Managing Technology-Based Projects: Tools, Techniques,

The Communication Process. Home. The Models of Communication: Accessed 12.11.2018. Achieve Project Goals. USA: John & Wiley Sons

The World Road Association (PIARC), “The importance of road maintenance, The World Road Association (PIARC),”2014, January 2018, tp://www.erf.be/images/Importance_of_road_maintenance.pdf.

Toroitich, J. K., Mburugu, K. N. & Waweru, L. (2017). Influence of employee competence on the implementation of electronic procurement in the selected county governments in Kenya. International Academic Journal of Human Resource and Business Administration, 2(3), 242-254.

Uganda Road Fund (2015). Road Maintenance Monitoring Report. Kampala.

UNDP, (2015). Handbook on Monitoring and Evaluation for Results. UN: Millennium Development Goals Report 2015.

United Nations. (2011). Unlocking the Human Potential for Public Sector Performance. World Public Sector Report 2011.

Wambui, D. N., Ombui, K., & Kagiri, A. (2015). Factors Affecting Completion of Road Construction Projects in Nairobi City County: Case Study of Kenya Urban Roads Authority (KURA); International Journal of Scientific and Research Publications, 5(11), 201-225.

Wamugu, J. W., & Ogollah, K. (2017). Role of stakeholders participation on the performance of Sub County development fund projects in Mathira East Sub County in Kenya. International Academic Journal of Information Sciences and Project Management, 2(1), 104-125.

Work, (2015). Overview of Decentralisation Worldwide: A stepping stone to improve

World Bank (2013). Monitoring & Evaluation: some tools, methods and approaches. The World Bank Independent Evaluation Group, 10 April, Washington, DC

World Bank Decentralisation Federalism: The Future of Decentralizing States? 25–27.

World Bank. (2014). Monitoring and Evaluation. Some Methods, Tools and Approaches. World Bank: Washington DC.

Youker, R. (2015). Organizational Alternatives for Project Management. Project Management Institute. Home. Learning.

Zvoushe, H. & Gideon, Z. (2013). Utilisation of Monitoring and Evaluation Systems by Development Agencies: The Case of the UNDP in Zimbabwe. American. International Journal of Contemporary Research.




DOI: http://dx.doi.org/10.61426/sjbcm.v7i1.1559

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.