ROLE OF LOGICAL FRAMEWORK ON MONITORING AND EVALUATION OF PUBLIC PRIVATE PARTNERSHIPS PROJECTS IN NAIROBI COUNTY, KENYA

NANCY NDUNGE MWANGI, DR. MAKORI MORONGE (Ph.D)

Abstract


The general objective of the study was to examine the role of logical framework approach on monitoring and evaluation of public private partnerships projects in Nairobi County, Kenya. The study was based on the System Approach Model, Structural Functional Approach, Project Scheduling Theory. The study adopted a descriptive research design. The study’s population was the Public Private Partnerships Infrastructure Projects in Kenya classified into: Transport/Roads; Energy& Petroleum; Environment, Water& Natural Resources; Industrialization & manufacturing; Education, Science & Technology; Housing & Urban Development; Commerce & Tourism; Health, Agriculture, Livestock & Fisheries. The study used census to collect primary data. Data was collected using questionnaires and analysed using the Statistical Package for Social Sciences Software (SPSS), version 26. Data was presented using summary statistic tables and figures. The study adopted correlation and regression analysis to test the relationship between the independent and dependent variables. The study established that all the independent variables (Project Purpose (PP), Verifiable Indicators (VI), Means of Verification (MoV), and Assumptions (A)) had a strong positive and statistically significant (p < .05) relationship with the dependent variable (Monitoring and Evaluation (M&E)). The study deduced that a positive deviation in each of the variables would result in subsequent change in the dependent variable (Monitoring and Evaluation (M&E)) and therefore recommended that, Project Purpose, Verifiable Indicators, Means of Verification, and Assumptions be considered in logical framework approach as they were found to positively influence monitoring and evaluation of public private partnerships projects in Nairobi County, Kenya.

Key Words: Project Purpose, Verifiable Indicators, Means of Verification, Assumptions, Monitoring and Evaluation

CITATION: Mwangi, N. N., & Moronge, M. (2020). Role of logical framework on monitoring and evaluation of public private partnerships projects in Nairobi County, Kenya. The Strategic Journal of Business & Change Management, 7(4), 224 – 239.


Full Text:

PDF

References


Akampurira, E., Root, D., & Shakantu, S. (2015). Factors constraining the implementation of public private partnerships in the electricity sector in Uganda. . Management and Economics, 23, 267-85.

Akintoye, A., Hardcastle, C., Beck, M., Chinyio, E., & Asenova, D. (2013). Achieving best value in private finance initiative project procurement,. Construction Management and Economics, 21, 461-470.

Allison, P. (2012). When Can You Safely Ignore Multicollinearity? Retrieved 20th of March, 2015.

Archibald, R. D., Di Filippo, I., & Di Filippo, D. (2015). The Siy-Phase Comperhensive Project Life Cycle Model Including the project Incubation / Feasibility Phase and the Post-Project Evaluation Phase. Project Management World Journal, 336-348.

Beh, L. S. (2015). Development and Distortion of Malaysian Public Private Partnerships Patronage, Privatised Profits and Pitfalls. Australian Journal of Public Administration, 69: S74-S84.

Bonnal, P., Gourc, D., & Lacoste, G. (2014). The Life Cycle of Technical Projects. Project Managment Journal , 8756-9728/01.

Camacho, J. (2015). Islamic Financing for Large Infrastructure Projects. Journal of Property Investment and Finance, 1(2):283-284.

Chen, Y. (2016). Spatial autocorrelation approaches to testing residuals from least squares regression. PloS one, 11(1), e0146865.

Chinhanga, J. R. (2015). Impact of industrial effluent from an iron and steel company on the physico-chemical quality of Kwekwe River water in Zimbabwe. International Journal of Engineering, Science and Technology, 2(7), pp.129-140.

EIU (Economist Intelligence Unit), the Economist Group (2010). Evaluating the Environment for Public-Private Partnerships in Latin America and the Caribbean: The 2010 Infrascope. A Guide to the Index and Methodology, London: Economist Intelligence Unit Limited.

Faraway, J. J. (2016). Extending the linear model with R: generalized linear, mixed effects and nonparametric regression models. Chapman and Hall/CRC.

Ghasemi, A., & Zahediasl, S. (2012). Normality tests for statistical analysis: a guide for non-statisticians. International journal of endocrinology and metabolism, 10(2), 486.

Government of Kenya (2016). Government Financial Regulations and Procedures. Government Printer. Nairobi.

Government of Kenya (2016). National Treasury – Kenya http://www.ppp.gov.za. (Accessed on 8th Feb, 2019)

Government of Kenya (2016).Kenya Vision 2030, Ministry of Planning and National Development, Kenya.

Grimsey, D., & Lewis, M. (2016). Public private partnerships: The worldwide revolution Public private partnerships: The worldwide revolution. Cheltenham: Edward Elgar Publishing.

Hall, C. M. (2017). Framing governance theory: A typology of governance and its implications for tourism policy analysis. Journal of Sustainable Tourism, 19, 437-457.

Halvorson, H. (2012). What Scientific Theories Could Not Be. Philosophy of Science (The University of Chicago Press) 79 (2): 183–206. doi:10.1086/664745

Harris, S. (2014). Public Private Partnerships: Delivering Better Infrastructure Services. Working Paper, Inter-American Development Bank, Working Paper (Journal Article).

Hasan, M., & Dridi, J. (2015). International Monetary Fund. Washington, DC: IMF.

Hodge, G. (2014). The risky business of public-private partnerships. Australian Journal of Public Administration, 63 (4) pp 37–49.

Katsamunska, P. (2016). Classical and modern approaches to public administration. . Economic Alternatives, 1, 74-81.

KJE PPP Project Phase 1 Environmental and Social Impact Assessment [Vol A: Executive Summary] Report Dated June 2018. Prepared by Earth Systems Inc. and Atacama Consulting for UNRA,

Koimett, E. (2013). Public-Private Partnerships in Kenya. Nairobi: Ministry of Finance.

Koppenjan, J. F. (2015). The Formation of Public-Private Partnerships: Lessons from Nine Transportation Infrastructure Projects in the Netherlands,. Public Administration, 83(1), 135–157.

Leech, N. L., Barrett, K. C., & Morgan, G. A. (2014). IBM SPSS for intermediate statistics: Use and interpretation. Routledge.

Leley, K. (2013). Determinants of implementation of donor-funded Infrastructural projects in Kenya: A case of Roads in Nairobi County. Kenyatta University: Unpublished MBA Project.

Li, B., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2015). Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI Procurement for Constructionprojects in the UK, findings from a questionnaire survey. Engineering, Construction and Architectural Management, 12(2), 125-148.

Meidute, I., & Paliulis, N. K. (2015). Feasibility study of public-private partnership. International Journal of Strategic Property Management, 16(5), 257-274.

Meng, X., Zhao, Q., & Shen, Q. (2017). Critical success factors for transfer-operate-transfer urban water supply project in China. Journal of management and engineering, 243-257.

Morton, S. M., Bandara, D. K., Robinson, E. M., & Carr, P. E. A. (2012). In the 21st century, what is an acceptable response rate?. Australian and New Zealand journal of public health, 36(2), 106-108.

Ndandiko, C. (2014). Public Private Partnerships as modes of procuring public infrastructure and service delivery in developing countries: lessons from Uganda. International public procurement conference proceedings, 258-269.

Nderitu, W. (2015). Road Infrastructure and Economic Growth in Kenya. University of Nairobi: Unpublished MAE Project,.

Nguri, W. (2015). The Effectiveness of Private Public Partnership in Financing Municipal Capital Projects,. University of Nairobi: PhD Finance, School of Business.

Pallant, J. (2013). SPSS survival manual. McGraw-Hill Education (UK).

Pistor, K., Martin, R., & Stanislaw, G. (2016). Law and Finance in Transition Economies. Economics of Transition, 8(2):325−68.

PPIAF (2012). Public Private Partnerships. Reference Guide. World Bank, Washington DC.

Public Private Partnership Unit. PPPU, (2015). A review of studies on public–private partnership projects in the construction industry. International Journal of Project Management, 28(7), 683-694.

Republic of Kenya (2013). The Cabinet: Kenyan Ministries, Government Printer

Robbins, P., Judge, A., Odendaal, A., & Roodt, G. (2015). Organisation Behaviour: Global and Southern African Perspectives. Cape Town, South Africa: Pearson Education.

Robinson, H. S., & Scott, J. (2015). Service delivery and performance monitoring in Service delivery and performance monitoring in. Construction Management and Economics, 27(2): 181 –197.

Sanghi, A., Sundakov, A., & Hankinson, D. (2017). Designing and using public-private partnership units in infrastructure Lessons from case studies around the world. Journal of Construction Engineering and Management, 26, 283–301.

Shaoul, J. (2017). Using the private sector to finance capital expenditure: The financial realities. Policy, finance and management for public private partnerships, 24-29.

Sharma, C. (2014). Determinants of PPP in infrastructure in developing economies. Determinants of PPP in infrastructure in developing economies, 6(2): 149-166.

Siemiatycki, M. (2014). Academics and Auditors: Comparing Perspectives on Transportation Project Cost Overruns. Journal of Planning Education and Research, 29: 142-156.

Smyth, A., & Edkins, J. (2017). Relationship management in the management of PFI/PPP projects in the UK. International Journal of Project Management, 25: 232-240.

Sullivan, A., & Sheffrin, S. (2014). Economics: Principles in action. Upper Saddle River. New Jersey: Pearson Prentice Hall.

Taber, K. S. (2018). The use of Cronbach’s alpha when developing and reporting research instruments in science education. Research in Science Education, 48(6), 1273-1296.

Teicher, J., Alam, Q., & Gramberg, V. (2016). Managing trust and relationships in PPPs: some Australian experiences. International Review of Administrative Sciences, 105: 85-100.

Thornhill, C., & Van Dijk, G. (2013). Public administration theory: Justification for conceptualisation. . Journal of Public administration, 45(Special issue 1),95-110.

Wibowo, A., & Alfen, W. (2017). Fine‐tuning the value and cost of capital of risky PPP infrastructure projects, . Engineering, Construction and Architectural Management, 20(4):406 – 419.

World Bank Institute (2014). Public Private Partnerships. Public Private Infrastructure Advisory Facility. Washington, DC.

Yescombe, E. (2017). Public-private partnerships: principles of policy and finance. Oxford, United Kingdom: Butterworth-Heinemann.

Yuan, J., Zeng, A. Y., Skibniewski, M. J., & Li, Q. (2014). Selection of performance objectives and key performance indicators in public private partnership projects to achieve value for money. Construction mangement Economy, 27(3) 253-270.

Zhang, X. Q. (2015). Criteria for Selecting the Private-Sector Partner in Public–Private Partnerships. Journal of Construction Engineering and Management, 131(6), 631-6.




DOI: http://dx.doi.org/10.61426/sjbcm.v7i4.1786

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.