This research studied the impact of project management practices on implementation of information technology projects in state corporations in Kenya. Kenya Airports Authority was selected for this research as a state corporation that had adopted project implementation practices and also due to the nature and number of projects it implemented biannually. The measurement of success in implementation of IT projects was done using four criteria; project risk management, stakeholder involvement, human resource management and monitoring and evaluation.  The study focused on 129 staff working within the Nairobi offices of KAA. The study also used the experimental research design. Census survey was used, hence no sampling was done. Self-administered questionnaires were given to 129 respondents from the target population. The collected data was analysed using both descriptive and inferential statistics with the aid of SPSS. The key findings of the research study was that Monitoring and Evaluation had the strongest correlation at 0.824, while the combined alpha score was 0.736, followed by human resource management, risk management and finally stakeholder involvement, thus, indicating that all the research data whether considered separately or as a whole was reliable. The organisation had effectively implemented stakeholder involvement. Risk management practices at state corporations need to include improved risk planning. Whilst the organisation had prioritised monitoring and evaluation, it had neglected to invest in cloud-based technology. State corporations had also done exceptionally well in the implementation of human resource management. All the studied aspects of implementation of IT projects were properly addressed. The organisation should prioritise the use of effective stakeholder communication strategies and relationship software to manage stakeholder involvement. They should also get involved in risk planning as a means of improving its risk management by assessing the risks and implementing a plan to control risks. It should also conduct some research to determine the efficacy of using cloud-based technology to enhance M&E. The study finally provided recommendations for improvement in project management practices and in areas of further studies on adoption of project management practices.

Key Words: Project Risk Management, Stakeholder Involvement, Human Resource Management and Monitoring and Evaluation

CITATION: Effect of project management practices on implementation of information technology projects in state corporations in Kenya (case study of Kenya Airports Authority). The Strategic Journal of Business & Change Management, 8 (2), 1 – 28.


Full Text:

PDF

References


Aapaoja, A., Haapasalo, H., & Söderström, P. (2013). Early stakeholder involvement in the project definition phase: case renovation. ISRN industrial engineering, 2013.

Abend, G. (2008). The meaning of ‘theory’. Sociological Theory, 26(2), 173-199.

Abdullah, A. H., Yaman, S. K., Mohammad, H., & Hassan, P. F. (2018). Construction manager’s technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(2), 153-177.

Ackermann, F., & Eden, C. (2011). Strategic management of stakeholders: Theory and practice. Long range planning, 44(3), 179-196.

Africa Airlines Association (2013). Africa Wings Magazine Interview with Eng. Stephen Gichuki, MD of Kenya Airports.

Aliabadi, F. J., Mashayekhi, B., & Gal, G. (2019). Budget preparers' perceptions and performance based budgeting implementation: the case of Iranian public universities and research institutes. Management, 31(1), 137-156.

Al-Hajj, A., & Zraunig, M. (2018). The impact of project management implementation on the successful completion of projects in construction. International Journal of Innovation, Management and Technology, 9(1).

Al Shaar, E. M., Khattab, S. A., Alkaied, R. N., & Manna, A. Q. (2015). The effect of top management support on innovation: The mediating role of synergy between organizational structure and information technology. International Review of Management and Business Research, 4(2), 499.

Al Shatti, L., Bischoff, J. E., & Willy, C. J. (2018). Investigating the effectiveness of team communication and the balance of member contributions on knowledge acquisition. Knowledge Management Research & Practice, 16(1), 51-65.

Anantatmula, V. S. (2010). Project manager leadership role in improving project performance. Engineering Management Journal, 22(1), 13-22.

Anca, U., Cezar, B., & Adrian, U. (2015, November). Risk identification in project management. In International Conference on Economic Sciences and Business Administration (Vol. 2, No. 1, pp. 259-266). Spiru Haret University.

Anyaeche, C. O., Oluwole, O. O., Nnweremizu, P. J. & Orji, I. J. (2012). Project Progress Evaluation: Methodology and Reporting Template. Journal of NIIE, 3, 36-47.

Anyango, B. J. (2014). Outsourcing and the performance of state corporations in Kenya. Unpublished MBA Project, School of Business, University of Nairobi.

Arain, M., Campbell, M. J., Cooper, C. L., & Lancaster, G. A. (2010). What is a pilot or feasibility study? A review of current practice and editorial policy. BMC medical research methodology, 10(1), 67.

Armstrong, M. (2010). Armstrong’s essential human resource management practice: A guide to people management. London: Kogan Page Limited.

Arslan, A., & Staub, S. (2013). Theory X and theory Y type leadership behavior and its impact on organizational performance: Small business owners in the Şishane Lighting and Chandelier District. Procedia-social and behavioral sciences, 75, 102-111.

Aubert, B. A., & Weber, R. (2001). Transaction cost theory, the resource-based view, and information technology sourcing decisions: A re-examination of Lacity et al.’s findings. Cahier du GReSI no, 1(08).

Barclay, C., & Osei-Bryson, K. M. (2008). The Project Objectives Measurement Model (POMM): an alternative view to information systems project measurement. Electronic Journal of Information Systems Evaluation, 11(3).

Bates, M. B., Sturges, J. L., & Hutchinson, B. (1999). Project Management Techniques and Procedures: A comparison of construction contracting and aircraft manufacture. In Proceedings of the 2nd International Conference on Construction Industry Development, and 1st Conference of CIB TG (Vol. 29).

Batson, R. G. (2009). Project risk identification methods for construction planning and execution. In Construction Research Congress, ASCE (pp. 746-755).

Bernhardt, A., Batt, R., Houseman, S., & Appelbaum, E. (2016). Domestic outsourcing in the US: a research agenda to assess trends and effects on job quality. IRLE Working Paper No. 102-16. Retrieved from http://irle.berkeley.edu/workingpapers/102-16.pdf

Bhawan, B. A. (2014). Risk management plan. Mineral Exploration Corporation Ltd.

Bizottság, E. (2010). Risk assessment and mapping guidelines for disaster management. Commission Staff Working Paper.

Bolarinwa, O. A. (2015). Principles and methods of validity and reliability testing of questionnaires used in social and health science researches. Nigerian Postgraduate Medical Journal, 22(4), 195-201.

Boone, H. N., & Boone, D. A. (2012). Analyzing likert data. Journal of extension, 50(2), 1-5.

Brief, A. I. (2012). Qualitative and quantitative research techniques for humanitarian needs assessment. Retrieved from http://www.parkdatabase.org/documents/download/qualitative_and_quantitative_research_techniques.pdf

Brown, I. & Molla, A. (2015). Determinants of Internet and cell phone banking adoption in

SouthAfrica. Journal of Internet Banking and Commerce, 10 (1)

Cagliano, A. C., Grimaldi, S., & Rafele, C. (2015). Choosing project risk management techniques. A theoretical framework. Journal of Risk Research, 18(2), 232-248.

Chumo, K. P. (2015). Developments and challenges of business process outsourcing sector in Kenya. European Journal of Business Management, 7(36), 195-204.

Cooper, D. & Schindler, P. (2014). Business Research Methods (12th Ed.), New York: McGraw-Hill.

Cox, A. (2013). The causes of major outsourcing failures. International Institute for Advanced Purchasing & Supply, White Paper, 13(1).

CPD (2012). Monitoring and evaluation framework for continuing professional development. Retrieved from http://www.unam.edu.na/sites/default/files/cpd-regional1/cpd_me_framework.pdf

Crane, L., Gantz, G., Isaacs, S., Jose, D. & Sharp, R. (2013). Introduction to risk management understanding agricultural risks: production, marketing, financial, and legal human.

Dağlı, Ö. B. (2018). Stakeholder Management in Project Success: Is it an Object or Subject?. PM World Journal, 7(5).

DeLong, E. R., DeLong, D. M., & Clarke-Pearson, D. L. (1988). Comparing the areas under two or more correlated receiver operating characteristic curves: a nonparametric approach. Biometrics, 837-845.

Dinu, A. M. (2012). Modern methods of risk identification in risk management. International Journal of Academic Research in Economics and Management Sciences, 1(6), 67.

Dowling, P. J., Festing, M. & Engle, A. D. (2013). International Human Resource Management (6th ed.). Hampshire: Cengage Learning.

Dumbravă, V., & Iacob, V. S. (2013). Using probability–impact matrix in analysis and risk assessment projects. Descrierea CIP/Description of CIP–Biblioteca Națională a României Conferința Internațională Educație și Creativitate pentru o Societate Bazată pe Cunoaștere–ŞTIINŢE ECONOMICE, 42.

Edgar, W. B., & Lockwood, C. A. (2008). Developing Core Competence Related Theory: Working Paper Series--08-06.

El-Dash, K. (2018). Assessing human resource management in construction projects in Kuwait. Journal of Asian Architecture and Building Engineering, 6(1), 65-71.

El Fadil, J., & St-Pierre, J. (2016). Analysis and management of risks associated with outsourcing in China: The experience of seven Canadian firms. Strategic Outsourcing: An International Journal, 9(2), 218-242.

El-Naway, O., Mahdi, D. I., Badwy, M., & Al-Deen, A. G. (2015). Developing Methodology for Stakeholder Management to Achieve Project Success. International Journal of Innovative Research in Science, Engineering and Technology, 4(11), 10651-10660.

Eng’airo, P. (2017). Motives of Human Resource Outsourcing and Performance Outcomes among Mobile Telecommunication Firms in Kenya Pamela Eng’airo (Doctoral dissertation, COHRED, JKUAT).

Ezehoha, A. E. (2015). Regulating Internet banking in Nigeria: Some success prescriptions? Part

Journal of Internet Banking and Commerce, 11 (1).

Fageha, M. K., & Aibinu, A. A. (2013). Managing project scope definition to improve stakeholders’ participation and enhance project outcome. Procedia-Social and Behavioral Sciences, 74, 154-164.

Family Health International (2004). Monitoring HIV/AIDS Programs: A Facilitator’s Training Guide. A USAID Resource for Prevention, Care and Treatment

Fontaine, C., Haarman, A., & Schmid, S. (2006). The stakeholder theory. Edlays education, 1, 1-33.

Friis, I., & Hansen, A. (2015). Line-item budgeting and film-production: Exploring some benefits of budget constraints on creativity. Qualitative Research in Accounting & Management, 12(4), 321-345.

Fulbright-Anderson, K., Kubisch, A. C., & Connell, J. P. (Eds.). (1998). New approaches to evaluating community initiatives: Theory, measurement, and analysis (Vol. 2). Aspen Inst Human Studies.

Gannon, D., & Boguszak, A. (2013). Douglas Mcgregor’S Theory X and Theory Y. CRIS-Bulletin of the Centre for Research and Interdisciplinary Study, 2013(2), 85-93.

Ghasemi, F., Sari, M., Yousefi, V., Falsafi, R., & Tamošaitienė, J. (2018). Project portfolio risk identification and analysis, considering project risk interactions and using Bayesian networks. Sustainability, 10(5), 1609.

Gitau, L. M. (2015). The effects of risk management at project planning phase on performance of construction projects in Rwanda (Master’s thesis, Jomo Kenyatta University of Agriculture and Technology).

Golafshani, N. (2003). Understanding reliability and validity in qualitative research. The qualitative report, 8(4), 597-606.

Gordon, N. (2002). A question of response rate. Science, 25(1), 25.

Grant, C., & Osanloo, A. (2014). Understanding, selecting, and integrating a theoretical framework in dissertation research: Creating the blueprint for your “house”. Administrative Issues Journal, 4(2), 4.

Grant Thornton (2015). Outsourcing: Beyond technical expertise. Grant Thornton International Business Report 2015. Retrieved from file:///C:/Users/Ronald%20Nganga/Downloads/IBR2015_Outsourcing_report_FINAL.pdf

Grzesik, K., & Piwowar-Sulej, K. (2018). Project managers’ competencies and leadership styles from the perspective of organizations functioning in Poland. Journal of Entrepreneurship, Management and Innovation, 14(3), 35-60.

Hamilton, D. F., Ghert, M., & Simpson, A. H. R. W. (2015). Interpreting regression models in clinical outcome studies. British Editorial Society of Bone and Joint Surgery, London, United Kingdom, 4(9), 152-153.

Harvey, J. (2008). Introduction to managing risk. Topic Gateway series no. 28

Huang, L., Huang, J., & Wang, W. (2018). The sustainable development assessment of reservoir resettlement based on a BP neural network. International Journal of Environmental Research and Public Health, 15(1), 146.

INTRAC (2015). Outputs, outcomes and impact. Retrieved from https://www.intrac.org/wpcms/wp-content/uploads/2016/06/Monitoring-and-Evaluation-Series-Outcomes-Outputs-and-Impact-7.pdf

INTRAC (2015). Setting Objectives. Retrieved from https://www.intrac.org/wpcms/wp-content/uploads/2016/06/Monitoring-and-Evaluation-Series-Setting-objectives-6.pdf

Interact (2013). Project Management Handbook: Chapter V – Project Implementation. Retrieved from http://www.interact-eu.net/download/file/fid/4524

Israel, G. D. (1992). Determining sample size. Fact Sheet PEOD-6, University of Florida.

Johansson, B. (2004). Exploring outsourcing decisions using the resource-based view of the firm. In BIR 2004–3rd International Conference on Perspectives in Business Informatics Research.

Kalamu, P. M. (2009). Challenges of outsourcing strategy by mobile phone operators in Kenya (Doctoral dissertation, School of Business, University of Nairobi).

Kamanga, F. N. & Ismail, S. N. (2016). Effects of outsourcing on organization performance in manufacturing sector in Kenya: A case of Del Monte Kenya Limited. European Journal of Logistics, Purchasing and Supply Chain Management, 4(3), 32-58.

Kamau, J. K., Rotich, G., & Anyango, W. (2017). Effect of budgeting process on budget performance of state corporations in Kenya: A case of Kenyatta National Hospital. International Academic Journal of Human Resource and Business Administration, 2(3), 255-281.

Kao, L. S., & Green, C. E. (2008). Analysis of variance: is there a difference in means and what does it mean?. Journal of Surgical Research, 144(1), 158-170.

Kathuni, L. K. (2009). Call centre outsourcing practice by Zain Kenya limited (Doctoral dissertation, University of Nairobi).

Kavčič, K. (2014). Strategic management of outsourcing. Univerza na Primorskem, Fakulteta za management.

Kazibwe, N. (2014). Critical success factors for outsourced distribution services and the performance of National Medical Stores, Uganda (Doctoral dissertation, Uganda Management Institute).

Kemp, S. & Kemp, S. (2004). Business Statistics Demystified. New York: McGraw-Hill.

Kenya Airports Authority (2018). Provision of cleaning services at Ukunda Airstrip (Eligibility for Youth, Women & People Living with Disability). Tender no. KAA/OT/UKUNDA/1361/2018-2019.

Khoshtale, O., & Adeli, M. M. (2016). The relationship between team effectiveness factors and project performance aspects: A case study in Iranian construction project teams. International Journal of Humanities and Cultural Studies (IJHCS) ISSN 2356-5926, 1738-1767.

Kibera, G. (2013). Assessment of stakeholders’ participation in the implementation of information and communication technology software projects: A case of Jomo Kenyatta University of Agriculture and Technology. International Journal of Academic Research in Business and Social Sciences, 3(10), 124.

Kimberlin, C. L., & Winterstein, A. G. (2008). Validity and reliability of measurement instruments used in research. American Journal of Health-System Pharmacy, 65(23), 2276-2284.

Kinyua, B. K. (2015). Determinants of outsourcing services as a cost reduction measure in devolved government: A case study of Nairobi City County, Kenya. European Journal of Business and Social Sciences, 4(05), 12-23.

Kinyua, J. K. A. (2010). Challenges of business process outsourcing at Kenya Power and Lighting Company Limited (Unpublished MBA project. Nairobi: University of Nairobi).

Kinyua, E., Ogollah, K., & Mburu, D. K. (2015). Effect of risk management strategies on project performance of small and medium information communication technology enterprises in Nairobi, Kenya. International Journal of Economics, Commerce and Management, 3(2), 1-30.

Kipkurui, A. K. (2015). Implementation of business process outsourcing by Government Agencies under the Ministry of information and communication technology in Kenya. (Unpublished MBA Project). School of Business, University of Nairobi., Kenya.

Kıral, I. A., Kural, Z., & Çomu, S. (2014). Risk identification in construction projects: Using the Delphi Method. In Proceedings of the 11th International Congress on Advances in Civil Engineering, 21-25 October 2014, Istanbul Technical University, Istanbul, Turkey.

Kissi, E., Agyekum, K., Baiden, B. K., Tannor, R. A., Asamoah, G. E., & Andam, E. T. (2019). Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management.

Kitchenham, B. (2004). Procedures for performing systematic reviews. Keele, UK, Keele University, 33(2004), 1-26.

Klemetti, A. (2006). Risk management in construction project networks.

Koay, Z. W., & E Markov, D. (2011). Core competence development: paradigm and practical implementations (Master’s thesis, Blekinge Institute of Technology, School of Management).

Koehn, P. H., & Uitto, J. I. (2015). Beyond outputs: Pathways to symmetrical evaluations of university sustainable development partnerships. Development Studies Research, 2(1), 1-19.

Koku, P. S. (2009). Consumer attitude toward outsourcing of technical support services: An exploratory study. Services Marketing Quarterly, 30(4), 315-332.

Kolb, A. Y., & Kolb, D. A. (2011). Experiential learning theory: A dynamic, holistic approach to management learning, education and development. The SAGE handbook of management learning, education and development, 42-68.

Koltnerová, K., Chlpeková, A., & Samáková, J. (2012). The importance of human resource planning in industrial enterprises. Research Papers Faculty of Materials Science and Technology Slovak University of Technology, 20(Special Number), 62-67.

Kopelman, R. E., Prottas, D. J., & Davis, A. L. (2008). Douglas McGregor's theory X and Y: Toward a construct-valid measure. Journal of Managerial Issues, 255-271.

Kothari, C. R. (2004). Research methodology: Methods and techniques. New Delhi: New Age International (P) Limited Publishers.

Lacity, M. C., Khan, S. A., & Willcocks, L. P. (2010). A review of the IT outsourcing literature: Insights for practice. The Journal of Strategic Information Systems, 18(3), 130-146.

Lai, I. K., & Lam, F. K. (2010). Perception of various performance criteria by stakeholders in the construction sector in Hong Kong. Construction Management and Economics, 28(4), 377-391.

Langat, B., & Kamuren, F. J. (2013, December). Information Systems Outsourcing Versus Systems Development: A Comparative Study of the Preferred Choices of the Different Banks in Nakuru Town. In Scientific Conference Proceedings.

Lind, D. A., Marchal, W. G. & Wathen, S. A. (2006). Basic statistics for Business & Economics (5th ed.). Boston: McGraw Hill.

Littau, P., Jujagiri, N. J., & Adlbrecht, G. (2010). 25 years of stakeholder theory in project management literature (1984-2009). Project Management Journal, 41(4), 17-29.

Loma-Osorio, F. G., & Zepeda, C. S. (2014). Rethinking development management methodology: towards a “process freedoms approach”. Journal of Human Development and Capabilities, 15(1), 28-46.

Machado, N., Castro, A. J., & Oliveira, E. (2015). Studying the impact of the organizational structure on airline operations control. In Advances in Artificial Transportation Systems and Simulation (pp. 103-124). Academic Press.

Maina, B. M. (2013). Influence of stakeholders’ participation on the success of the economic stimulus programme: a case of education projects in Nakuru County, Kenya (Master’s thesis, University of Nairobi).

Mann, L., & Graham, M. (2016). The domestic turn: Business process outsourcing and the growing automation of Kenyan organizations. The Journal of Development Studies, 52(4), 530-548.

Mansell, S. (2013). Shareholder theory and Kant’s ‘duty of beneficence’. Journal of Business Ethics, 117(3), 583-599.

Marchewka, J. T. (2010). A framework for identifying and understanding risks in information technology projects. Journal of International Technology and Information Management, 19(1), 2.

Martínez-Noya, A., & García-Canal, E. (2011). Technological capabilities and the decision to outsource/outsource offshore R&D services. International Business Review, 20(3), 264-277.

Matthews, J., Love, P. E., Heinemann, S., Chandler, R., Rumsey, C., & Olatunj, O. (2015). Real time progress management: Re-engineering processes for cloud-based BIM in construction. Automation in Construction, 58, 38-47.

Mathis, R. L. & Jackson, J. H. (2011). Human resource management (13th ed.). Mason: South-Western Cengage Learning.

Mburu, E. W., & Rotich, G. (2017). Determinants of customer service outsourcing decision among organizations in Kenya: A case of Orange Telkom Kenya Ltd. International Academic Journal of Human Resource and Business Administration, 2(3), 632-652.

McHardy, J. P., Dietrich, M., & Krafft, J. (2015). Real firms, transaction costs and firm development: a suggested formalisation. The Sheffield Economic Research Paper Series (SERPS).

Mgweno, Z. (2014). An assessment of effectiveness of outsourcing services in quality service delivery in public sector: a case of Tanzania electric supply Company limited, Tanga (Doctoral dissertation, Mzumbe University).

Michael, B., & Michael, R. (2011). A transaction cost economics view of outsourcing. International Journal of Business, Humanities and Technology, 1(2), 34-43.

Missonier, S., & Loufrani-Fedida, S. (2014). Stakeholder analysis and engagement in projects: From stakeholder relational perspective to stakeholder relational ontology. International Journal of Project Management, 32(7), 1108-1122.

Mohan, A. V. (2017). Human resource management and coordination for innovation activities: gleanings from Malaysian cases. Asian Journal of Technology Innovation, 25(2), 246-267.

Mooi, E., & Sarstedt, M. (2014). A concise guide to market research, chapter 7: “Regression analysis”. Berlin: Springer-Verlag, 10, 193-233.

Moruri, I. O. (2015). Factors influencing outsourcing of technical and specialized goods, works and services in public secondary schools in Kenya: A case of Nyamache District, Kisii County. International Journal of Economics, Commerce and Management, 3(4), 1-19.

Mroczek, K. (2014). Transaction cost theory--explaining entry mode choices. Poznan University of Economics Review, 14(1).

Mrutu, L., & Mganga, P. (2016). Outsourcing or giving all out? Experience from Tanzania local government revenue collection. Journal of Public Administration and Governance, 6(3), 1-11.

Mugenda, O. & Mugenda A. (2003). Research methods: quantitative and qualitative approaches.

Mujasi, P. N., & Nkosi, Z. Z. (2017). Factors associated with outsourcing support services by general hospitals in Uganda. The Open Public Health Journal, 10(1).

Musyoka, B. S. (2012). Project risk management practices and success of capital projects in Kenya (Doctoral dissertation, School of Business, University of Nairobi).

Mwanje, M. G. (2010). The application of outsourcing strategy at British Airways in Kenya (Master’s thesis, University of Nairobi).

Nahar, R., Islam, R., & Ullah, K. T. (2017). Identifying the factors for reducing employee turnover rate in aviation business: Bangladesh context. Australian Academy of Business and Economics Review, 3(1), 39-46.

Nakanjako, T. (2016). Outsourcing and performance of public institutions in Uganda: The case of contracting at National Planning Authority (Unpublished MBA Project. Kampala: Uganda Technology and Management University).

Nalewaik, A., & Mills, A. (2015, January). Project stakeholder concerns and expectations. In PAQS 2015: Proceedings of the 19th Pacific Association of Quantity Surveyors Congress (pp. 1-10). The Conference.

Ngacho, C., & Das, D. (2015). A performance evaluation framework of construction projects: insights from literature. International Journal of Project Organisation and Management, X(Y).

Niebel, D., Kopp, G. & Beerfeltz, H. (2013). Information and communication technology: Key technologies for sustainable development. BMZ Strategy Paper 2.

Nightingale, P., Baden-Fuller, C., & Hopkins, M. M. (2011). Projects, project capabilities and project organizations. In Project-based organizing and strategic management (pp. 215-234). Emerald Group Publishing Limited.

Nuottila, J., Aaltonen, K., & Kujala, J. (2016). Challenges of adopting agile methods in a public organization. International Journal of Information Systems and Project Management, 4(3), 65-85.

OECD (2015). Stakeholder involvement in decision making: A short guide to issues, approaches and resources. Radioactive Waste Management. Retrieved from https://www.oecd-nea.org/rwm/pubs/2015/7189-stakeholder-involvement-2015.pdf

Olkkonen, L. (2015). Stakeholder expectations: conceptual foundations and empirical analysis. Jyväskylä studies in humanities, (270).

Olubajo, O., Hughes, W., & Schweber, L. (2019, May). Construction Programmes and Programming: A Critical Review. In 10th Nordic Conference on Construction Economics and Organization (pp. 189-194). Emerald Publishing Limited.

Otieno, W. O. (2013). Outsourcing as a strategy for competitive advantage by Barclays bank of Kenya (Doctoral dissertation, University of Nairobi).

Payowela, J. E. (2016). Effectiveness of outsourcing of security service at Tanzania Fisheries Research Institute, Dar es Salaam (Doctoral dissertation, Mzumbe University).

Peterson, R. A., & Brown, S. P. (2005). On the use of beta coefficients in meta-analysis. Journal of Applied Psychology, 90(1), 175.

Project Management Institute (2017). A guide to the project management body of knowledge (6th Ed.). Pennsylvania: Project Management Institute.

Rajablu, M., Marthandan, G., & Yusoff, W. F. W. (2015). Managing for stakeholders: The role of stakeholder-based management in project success. Asian Social Science, 11(3), 111.

Rajasekar, S., Philominathan, P., & Chinnathambi, V. (2006). Research methodology. arXiv preprint physics/0601009.

Renault, B. Y., Agumba, J. N. and Ansary, N. (2016). A theoretical review of risk identification: perspective of construction industry. In: Mojekwu, J. N., Nani G., Atepor, L., Oppong, R. A.., Adetunji, M. O., Ogunsumi, L., Tetteh, U. S., Awere E., Ocran, S. P., and Bamfo-Agyei, E. (Eds) Procs 5th Applied Research Conference in Africa. (ARCA) Conference, 25-27 August 2016, Cape Coast, Ghana.

Rizal, A. R. A., Nordin, S. M., Saad, M. S., & Ismail, K. (2012). Engagement Strategies for Stakeholder Management in New Technology Development in the Fertilizer Industry–A Conceptual Framework. World Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering, 6(11), 2947-2953.

Rocco, T. S., & Plakhotnik, M. S. (2009). Literature reviews, conceptual frameworks, and theoretical frameworks: Terms, functions, and distinctions. Human Resource Development Review, 8(1), 120-130.

Ross, S. M., & Morrison, G. R. (2004). Experimental research methods. Handbook of research on educational communications and technology, 2, 1021-43.

Roy, V., & Aubert, B. A. (2001). A resource-based analysis of outsourcing: Evidence from case studies. Cahier du GReSI no, 1, 06.

Rubin, M. (2013). Why is the risk analysis essential in the project management process?. Romanian Distribution Committee Magazine, 4(4), 31-42.

Saldivar, M. G. (2012). A primer on survey response rate. Florida: Florida State University.

Salleh, K. M., & Sulaiman, N. L. (2017). Human resource competencies and human resource roles in organization practice. Int. J. Appl. Bus. Econ. Res, 15(4), 377-385.

Sawyer, S. F. (2009). Analysis of variance: the fundamental concepts. Journal of Manual & Manipulative Therapy, 17(2), 27E-38E.

Sekaran, U. (2003). Research methods for business. New York: John Wiley and Sons.

Sesi, C. I. O. (2014). Challenges of implementing outsourcing strategy by commercial Banks in Kenya. Unpublished MBA Project). School of Business, University of Nairobi., Kenya.

Shafiee, S., Hvam, L., & Bonev, M. (2014). How to scope a product configuration project in an engineering company. In 6th International Conference on Mass Customization and Personalization in Central Europe. University of Novi Sad.

Shehu, Z., Holt, G. D., Endut, I. R., & Akintoye, A. (2015). Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), 52-68.

Singh, A. S., & Masuku, M. B. (2014). Sampling techniques & determination of sample size in applied statistics research: An overview. International Journal of Economics, Commerce and Management, 2(11), 1-22.

Smith, B., Hurth, J., Pletcher, L., Shaw, E., Whaley, K., Peters, M., & Dunlap, G. (2017). A guide to the implementation process: stages, steps and activities. Retrieved from http://ectacenter.org/~pdfs/implementprocess/implementprocess-stagesandsteps.pdf

Soita, S. & Gichinga, L. (2016). Factors influencing strategic outsourcing practice in airline industry: A case study of Kenya Airways. The International Journal of Business & Management, 4(3), 307-333.

Sparrow, A. (2000). A theoretical framework for operational risk management and opportunity realisation (No. 00/10). New Zealand Treasury.

Ssempebwa, K. R. (2013). Project risk management. Research report submitted at the Atlanta International University.

Sumari, G. A., Mori, G. & Alfred, C. (2013). Outsourcing in cooperatives in Tanzania: Assessing the contribution of outsourcing on organizational performance. European Journal of Business and Management, 5(15), 99-104.

Taherdoost, H. (2016). Sampling methods in research methodology; how to choose a sampling technique for research. International Journal of Advance Research in Management, 5(2), 18-27.

Tijun, F., Sandel, L., Li, D. D., & Chang, X. Y. (2012). An analysis of outsourcing in East China: The case from four industries. African Journal of Business Management, 6(20), 6308-6317.

Tukamuhabwa, B., Ntayi, J., Muhwezi, M., Eyaa, S., & Saturday, J. (2012). Explaining outsourcing performance in Uganda’s commercial banks. Information Management and Business Review, 4(1), 18-29.

Turkmen, H. (2013). Scientific review of the relational view theory and its contribution to critical sourcing decision-making (Master's thesis, University of Twente).

Twycross, A., & Shields, L. (2004). Validity and reliability--what's it all about? Part 1 validity in quantitative studies: this is one of a series of short papers on aspects of research by Alison Twycross and Linda Shields. Paediatric nursing, 16(9), 28-29.

Umhlaba Development Services (2017). Introduction to monitoring and evaluation using the logical framework approach. European Commission Civil Society Fund in Ethiopia.

UNDP (2009). Handbook on planning, monitoring and evaluating for development results. New York: United Nations Development Programme.

Van Teijlingen, E., & Hundley, V. (2002). The importance of pilot studies. Nursing standard, 16(40).

Vaxevanou, A., & Konstantopoulos, N. (2015). Models referring to outsourcing theory. Procedia-Social and Behavioral Sciences, 175, 572-578.

Wachira, W., Brookes, M., & Haines, R. (2016). Viewing the impact of outsourcing from a Kenyan perspective. Asian Journal of Management Science and Economics Vol, 3(1).

Wambui, T. W., Wangombe, J. G., Muthura, M. W., Kamau, A. W., & Jackson, S. M. (2013). Managing workplace diversity: A Kenyan perspective. International Journal of Business and Social Science, 4(16), 199-218.

Williams, A. S. (2017). Effective stakeholder management strategies for information technology projects (Doctoral thesis, Walden University).

Wilson, K. B., Tete-Mensah, I., & Boateng, K. A. (2014). Information and communication technology use in higher education: Perspectives from students. European Scientific Journal, ESJ, 10(19).

Yeboah, A. (2013). The relationship between outsourcing and organizational performance. European Journal of Business and Management, 5(2), 2013.

Zhu, C. J., De Cieri, H., Fan, D., & Mike Zhang, M. (2018). Expatriate management in emerging market multinational enterprises (EMNEs): reflection and future research agenda. The International Journal of Human Resource Management, 29(11), 1787-1798, DOI: 10.1080/09585192.2017.1335997.

Zwikael, O., & Ahn, M. (2011). The effectiveness of risk management: an analysis of project risk planning across industries and countries. Risk Analysis: An International Journal, 31(1), 25-37




DOI: http://dx.doi.org/10.61426/sjbcm.v8i3.2022

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.