INFLUENCE OF PROJECT MANAGEMENT PARTICIPATION ON COMPLETION OF MASABA WATER AND SANITATION PROJECT IN TRANS-NZOIA COUNTY, KENYA

MERCY KHAMONYA OSORO

Abstract


The ultimate goal of a community water project is to benefit all members of the community. As such, it is apparent that community members are incorporated as critical stakeholders in such projects. As expounded within the extant literature, failure to include project management participation during project implementation negatively influences project completion while allowing project management participation positively influences project completion. The current study investigated project management participation in Masaba Water and Sanitation Project in Trans-Nzoia County to ascertain its influence on completion of the water project. The study particularly emphasized the four tenets of project implementation, including project initiation, planning, risk management and monitoring. The researcher employed a descriptive research design and a targeted population of 340 participants involved in the project at different points, including the community members who were supposed to benefit from the project. A stratified sampling technique was employed in the study; 183 participants were sampled to respond to the survey questionnaires. One hundred two respondents filled and returned the questionnaires that the researcher analyzed. Cronbach alpha test was employed on reliability test and a value of 0.99 was obtained hence verified the data used. The regression analysis results suggested that the measurements adopted (demographic data) were convenient as per the values of coefficient of determination (R2). The findings revealed that three of the analyzed objectives depicted R2 values of less than (0.5) while only one of the objectives yielded a statistical outcome R2 value higher than (0.5). The researcher concluded the study's general objective that minimal involvement of project management participation on completion of the project could make a project collapse before its prime time of completion. The researcher recommended that further studies that dwell on project management participatory levels at different implementation stages based in other geographical locations can be done using different instruments and participatory categories to ascertain the conclusion made on the study's general objective.

Keywords: Participation, Initiation, Planning, Monitoring, Risk Management 

CITATION: Osoro, M. K. (2021). Influence of project management participation on completion of Masaba Water and Sanitation project in Trans-Nzoia County, Kenya. The Strategic Journal of Business & Change Management, 8 (3), 732 – 753.


Full Text:

PDF

References


Andersen, P. D., Hansen, M., & Selin, C. (2021). Stakeholder inclusion in scenario planning—A review of European projects. Technological Forecasting and Social Change, 169, 120802.

Burtonshaw-Gunn, S. A. (2017). Risk and financial management in construction. Routledge.

Canevari-Luzardo, L., Bastide, J., Choutet, I., & Liverman, D. (2017). Using partial participatory GIS in vulnerability and disaster risk reduction in Grenada. Climate and Development, 9(2), 95-109.

Carvalho, M. M. D., & Rabechini Junior, R. (2015). Impact of risk management on project performance: the importance of soft skills. International Journal of Production Research, 53(2), 321-340.

Cheruiyot, J. K. (2020). Participatory Forest Management, Institutional Framework and Conservation of Mau Forest Programme in Bomet County, Kenya (Doctoral dissertation, University of Nairobi).

Choge, K. J., & Muturi, W. M. (2014). Factors affecting adherence to cost estimates: A survey of construction projects of Kenya National Highways Authority. International Journal of Social Sciences and Entrepreneurship, 1, 689-705.

Collins, S. E., Clifasefi, S. L., Stanton, J., Straits, K. J., Gil-Kashiwabara, E., Rodriguez Espinosa, P., & Wallerstein, N. (2018). Community-based participatory research (CBPR): Towards equitable involvement of community in psychology research. American Psychologist, 73(7), 884.

Damoah, I. S., Akwei, C. A., Amoako, I. O., & Botchie, D. (2018). Corruption as a source of government project failure in developing countries: Evidence from Ghana. Project Management Journal, 49(3), 17-33.

Di Maddaloni, F., & Davis, K. (2018). Project manager's perception of the local communities' stakeholders in megaprojects. An empirical investigation in the UK. International Journal of Project Management, 36(3), 542-565.

Fernando, Y., Walters, T., Ismail, M. N., Seo, Y. W., & Kaimasu, M. (2018). Managing project success using project risk and green supply chain management: A survey of automotive industry. International Journal of Managing Projects in Business.

Frost, J. (2019). How to interpret p-values and coefficients in regression analysis. URL https://statisticsbyjim.com/regression/interpret-coefficients-p-values-regression.

Giampiccoli, A., & Saayman, M. (2018). Community-based tourism development model and community participation. African Journal of Hospitality, Tourism and Leisure, 7(4), 1-27.

Gicharu, B. G. (2018). Determinants of Implementation of Constituency Development Fund Projects in Njoro Sub-county, Nakuru County, Kenya (Doctoral dissertation, Kenyatta University).

Gruden, N., & Stare, A. (2018). The influence of behavioral competencies on project performance. Project Management Journal, 49(3), 98-109.

Gunderson, R., Stuart, D., & Petersen, B. (2019). The political economy of geo-engineering as plan B: Technological rationality, moral hazard, and new technology. New Political Economy, 24(5), 696-715.

Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach. Routledge.

Hayat, F., Rehman, A. U., Arif, K. S., Wahab, K., & Abbas, M. (2019, July). The influence of agile methodology (Scrum) on software project management. In 2019 20th IEEE/ACIS International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing (SNPD) (pp. 145-149). IEEE.

Horsburgh, J., & Ippolito, K. (2018). A skill to be worked at: using social learning theory to explore the process of learning from role models in clinical settings. BMC medical education, 18(1), 1-8.

Jillo, A. (2016). Factors influencing implementation of dispensary projects in county governments in Kenya: a case of Isiolo County government. PhD Thesis, University of Nairobi.

Kabirifar, K., & Mojtahedi, M. (2019). The impact of Engineering, Procurement and Construction (EPC) phases on project performance: A case of large-scale residential construction project. Buildings, 9(1), 15.

Kiara, A. N., & Luketero, S. W. (2018). Factors influencing performance of donor funded projects: Case of Embu Water and Sanitation Company, Embu county, Kenya. International Academic Journal of Information Sciences and Project Management, 3(2), 317-330.

Kobusingye, B. E. R. N. A. D. E. T. T. E., Mungatu, J. K., & Mulyungi, P. (2017). Influence of stakeholders involvement on project outcomes. A case of water, sanitation, and hygiene (wash) project in Rwanda. European Journal of Business and Social Sciences, 6(6), 195- 206.

Korten, David C. (1990). Getting to the 21st Century. W Hartford, CT: Kumarian Press. pp. 4.

Kothari, C. (2019). C.R. Kothari Research Methodology Methods and Techniques. New Delhi: New Age International (P) Ltd., Publishers.

Kukubo, E. N. (2020). Critical Success Factors and the Sustainability of Small Scale Horticulture Projects in Kiambu County, Kenya. International Journal of Business and Social Science, 11(4).

Kumi, E., Yeboah, T., & Kumi, Y. A. (2020). Private sector participation in advancing the sustainable development goals (SDGs) in Ghana: Experiences from the mining and telecommunications sectors. The Extractive Industries and Society, 7(1), 181-190.

Lannon, J., & Walsh, J. N. (2019). Paradoxes and partnerships: a study of knowledge exploration and exploitation in international development programmes. Journal of Knowledge Management.

Lentz, C. (2020). Doing being middle-class in the global South: comparative perspectives and conceptual challenges. Africa: The Journal of the International African Institute, 90(3), 439-469.

Levy, P. S., & Lemeshow, S. (2013). A sampling of populations: methods and applications. John Wiley & Sons.

Marzouk, M., & Enaba, M. (2019). Text analytics to analyze and monitor construction project contract and correspondence. Automation in Construction, 98, 265-274.

Mdemu, M., Kissoly, L., Bjornlund, H., Kimaro, E., Christen, E. W., van Rooyen, A. & Ramshaw, P. (2020). The role of soil water monitoring tools and agricultural innovation platforms in improving food security and income of farmers in smallholder irrigation schemes in Tanzania. International Journal of Water Resources Development, 36(sup1), S148-S170.

Nderitu, W. (2020). Project Management Skills, Monitoring and Evaluation Practices and Performance of Youth Environmental Projects: a Case of Solid Waste Management Projects in Nairobi County, Kenya (Doctoral dissertation, University of Nairobi).

Nzekwe, J. U., Oladejo, E. I., & Emoh, F. I. (2015). Assessment of Factors Responsible for Successful Project Implementation in Anambra State, Nigeria. Assessment, 7(8).

Onyancha, J. N. (2020). Factors Influencing Completion of Water and Sanitation Projects in Informal Settlements in Kenya-a Case of Mukuru Kwa-njenga Slums, Nairobi County (Doctoral dissertation, University of Nairobi).

Pan, Y., & Zhang, L. (2021). A BIM-data mining integrated digital twin framework for advanced project management. Automation in Construction, 124, 103564.

Raina, S. (2015). Validity versus reliability. Neurology India, 63(2), 291.

Sanchez, B., & Haas, C. (2018). Capital project planning for a circular economy. Construction Management and Economics, 36(6), 303-312.

Sebahana, J. & Iravo, M. (2017). Influence of project identification process on project performance: a case of selected technical and vocational education and training projects (TVET) in Bugesera district. European Journal of Business and Social Sciences, 6(02), 229-245.

Strecker, D. (2018). 35. The Theory of Society: The Theory of Communicative Action (1981): A Classic of Social Theory. In The Habermas Handbook (pp. 360-382). Columbia University Press.

Tonchia, S. (2018). Project Risk Management. In Industrial Project Management (pp. 189-194). Springer, Berlin, Heidelberg.

Tuomela, R. (2020). Collective goals and communicative action. In Social Ontology in the Making (pp. 173-212). De Gruyter.

Velayudhan, D. P., & Thomas, S. (2018). Role of technological uncertainty, technical complexity, intuition and reflexivity in project planning–a study on software development projects. International Journal of Project Organisation and Management, 10(1), 82-92.

Williams, T., Vo, H., Samset, K., & Edkins, A. (2019). The front-end of projects: a systematic literature review and structuring. Production Planning Control, 30(14), 1137-1169.

Yamane, Taro. 1967. Statistics, an Introductory Analysis, 2nd Ed., New York: Harper and Row.




DOI: http://dx.doi.org/10.61426/sjbcm.v8i3.2049

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.