FACTORS AFFECTING THE IMPLEMENTATION OF ELECTRICITY POWER EXPANSION PROJECTS IN KENYA. A CASE OF KENYA POWER AND LIGHTING COMPANY

PATRICK MWENDWA MASILA

Abstract


The purpose of this study was to investigate factors affecting effective implementation of electricity power expansion projects in Kenya: A case of Kenya Power Company. The specific objectives were to examine the influence of top management support, financial resources, community support and procurement procedures on effective implementation of electricity power expansion projects in Kenya. This study adopted a descriptive research design for   the study. The target population was 66 respondents comprising of 6 project managers and 60 Project Team members. Census sampling was used to select project managers and stratified random sampling to select the project team members. The sample size was 33 and the data collection instruments adopted was questionnaires for the project team members and interviews for the project managers. Content analysis was used to analyze the qualitative data and Quantitative data was analyzed using descriptive statistics such as frequencies, percentages, charts, table and graphs with the use of Statistical Package for Social Sciences (SPSS) version 20.0. The study also used Analysis of Variance (ANOVA) to test the level of significance of at 95% confidence level. In addition, the study conducted a multiple regression analysis to test the relationship between the independent variables and dependent variable. The study concluded that top managers in Kenya Power effectively communicate the requirements of the project to all the parties concerned and carries out an evaluation of the project progress periodically to check for any deviations, Project budgeting is performed at the initial stages of project planning and usually in parallel with the development of the project schedule. Financial difficulties are a major cause of poor implementation of projects leading to delay in the timely completion of the expansion of projects in Kenya Power, Community awareness is done on the importance of providing way leave. Need analysis is done before contracting. The study recommends that Kenya Power should ensure that all the stakeholders are involved during project planning and motivate employees based on their performance, set objectives, assess assets and resources, estimate future financial needs and making plan to achieve monetary goals and also the financial activities should be planned for, recorded, monitored and controlled for effective project implementation, continue encouraging potential consumers to connect to power and set up a rural electrification committee to represent the local community and carry out a rigorous analysis during contractor selection to identify the best contractor.

Key Words: Top Management Support, Financial Resources, Community Support, Procurement Procedure, Implementation of Electricity Power in Kenya


Full Text:

PDF

References


Ali-Akpajiak, S. E., & Pyke, M. T. (2007). Poverty in Nigeria. Abuja: Oxfam Publications,

Atkinson, A. A., Waterhouse, J. H., & Wells, R. B. (2007). A stakeholder approach to strategic performance measurement. Sloan Management Review; Cambridge, 38(3), 25-37

Barnes, D. F., & Floor, W. M. (2006). Rural energy in developing countries: A challenge for economic development 1. Annual Review of Energy and the Environment, 21(1), 497-530.

Besner, C. & Hobbs, B. (2008). Project management practice, generic or contextual: a reality check. Project Management Journal, 39(1), 16-33.

Blattberg, C. (2004). Welfare: Towards the Patriotic Corporation. From Pluralist to Patriotic Politics: Putting Practice First. New York: Oxford University Press.

Boonstra, A. (2013). How do top managers support strategic information system projects and why do they sometimes withhold this support? International Journal Project Management, 31(4), 498-512

Bongani, N. (2013). Stakeholder Perception of Socio-Economic Benefits of Rural Electrification Program In Zimbabwe: A Case Of Umzingwane District. American Journal of Rural Development, 1(3) 33-39.

Borg, W. R., & Gall, M. D. (1989). Educational Research: An Introduction (5th ed.). New York: Longman.

Castro, N. J., Dantas, G. d., &Timponi, R. R. (2011). The role of energy planning in new hydropower investments. GESEL, Institute of Economics, Federal University of Rio de Janeiro, Brazil.

Cheng, X. M., Zhang, X. P., Yuan, J. H., & Gao, X. J. (2011). Total-factor energy efficiency in developing countries. Energy Policy, 39(2), 644-650.

Chimanzi, J., and Morgan, R. E. (2005). “Explanations from the marketing/human resources dyad for marketing strategy implementation effectiveness in service firms”. Journal of Business Research, 58, 787-796.

Clark, K. B. (2009). Project scope and project performance: the effect of parts strategy and supplier involvement on product development. Management science, 35(10), 1247-1263.

Cowan-Sahadath, K. (2010). Business transformation: Leadership, integration and innovation-a case study. Journal of Product Innovation Management, 28(4), 395-404.

Crawford, P., & Bryce, P. (2013). Project monitoring and evaluation: a method for enhancing the efficiency and effectiveness of aid project implementation. International Journal of Project Management, 21(5), 363-373.

Creswell, J. W. (1999). Mixed-method research: Introduction and application. In G. J. Cizek (Ed.), Handbook of Educational Policy. San Diego: Academic Press

Davis J. and Vicky Mabin, V. (2009). Theory of Constraints. New Zealand: Victoria University of Wellington

Divakar, K. & Subramanian, K. (2009). Critical Factors to be monitored for Successful Completion of Construction Projects. International Journal of Applied Engineering Research, 4(8), 1557-1566.

Dvir, D., Sadeh, A. & Malach-Pines, A. (2006). Projects and project managers: the relationship between project managers’ personality, project types, and project success. Project Management Journal, 37(5), 36-48.

Egan, J. (2008). Rethinking construction: report of the construction task force on the scope for improving the quality and efficiency of UK construction. Department of the Environment, Transport and the Region, London

Fong, P. & Choi, S. (2009). Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18(5), 547-557

Guimareas, T. & M. Igbaria, (2007). Client/server system success: Exploring the human side. Decision Science, 28(4), 851-876.

Hasan, F & Kami, M. I. (2010). The Performance Implications of Fit among Environment Strategy, Structure, Control System and Social Performance. Social and environmental accounting, 3(2) 117-142.

Johnson, J., Karen, D., Boucher, K. C. & Robinson, J. (2001). The criteria for success. Software Magazine, 21(1), S3-S11

Kandelousi, N. S. J. Ooi & A. Abdollahi, (2011). Key success factors for managing projects. World Acad. Sci. Eng. Technol, 5(9), 1826-1830

Kiogora, M. N. (2013). Influence Of Local Community Involvement In Project Planning On The Sustainability Of Projects In Embu County, Kenya (Doctoral dissertation, University of Nairobi).

Kirungu, E. (2011). Factors influencing Implementation of Donor Funded Projects: A Case Study of Financial and Legal Sector Technical Assistance Project. Retrieved from Jomo Kenyatta University of Agriculture and Technology, Department of Entrepreneurship and Procurement

Kirsi, A. (2010). Stakeholder Management in International Projects. Aolto University, doctoral dissertation series 2010/13.

Kumaraswamy, M. (2008). Contractor evaluation and selection: a Hong Kong perspective. Building and Environment, 31(3), 273-282

Loring, J. M. (2007). Wind energy planning in England, Wales and Denmark: Factors influencing project success. Energy policy, 35(4), 2648-2660.

Lynda, B. (2006). Project Relationships and the Stakeholder Circle. Proceeding of PMI research conference. Centre Mont-Royal, Montreal Canada 16th-19th July 2006.

Madison, N. (2009). What is financial planning? Retrieved from http://www.wisegeek.com/what-is –financial-planning. htm

Massie, J. L. (2006). Essentials of Management, (4th Ed). Prentice-Hall of India, New Delhi. University of Kentucky.

McComb, S. A., D. M. Kennedy, S. G. Green, W. D. Compton & McComb, S. D. (2008). Project team effectiveness: The case for sufficient setup and top management involvement. Production Planning Control, 19(4), 301-311

Meredith, J. R. & S. J. Mantel, (2010). Project Management A Managerial Approach (7th Ed). John Wiley and Sons, Inc., Hoboken, N. J.

Morgan, T. L., (2012). An examination of project managers’ leadership contributions to project success using critical success factors. Ph.D. Thesis, Capella University, UMI 3498739

Mugenda M. O. & Mugenda A. (1999). Research Methods: Qualitative and Quantitative. Nairobi: Acts press

Mugenda O. & Mugenda, A. (2003). Research Methods: Quantitative and Qualitative Approaches. Nairobi: Acts press

Naranjo-Gil, D., 2009. Management information systems and strategic performances: The role of top team composition. International Journal of Information Management, 29(2), 104-110.

Odusote, O. & Fellows, R. (2007). An examination of the importance of resource considerations when contractors make project selection decisions. Construction Management and Economics, 10(2), 137-151

Ofori, D. F., & Sakyi, K. E. (2006). Problems of Project Management: An Exploratory Ghanaian Study. Proceedings of the Workshop Series on Project Management & Development. Accra: Woeli Publishing Services

Okafor, E. O. (2008). Development Crisis of the Power supply and Implications for Industrial sector in Nigeria. Kamla-Raj Journal, 6, 83-92.

Orodho A. J. (2005). Techniques of writing research proposals and reports in Educational and Social Sciences, (2nd Ed) Nairobi: kaneja H.P Enterprises

Pennypacker, J. S. & Grant, K.P. (2003). Project management maturity: an industry benchmark. Project Management Journal, 2(1), 4-9.

Pinto, J. K., & Slevin, D. P. (2011). Critical factors in successful project implementation. Engineering Management, IEEE Transactions on, (1), 22-27.

Sanga E. T. (2009). Personal Financial Planning: Take Charge of Your Financial Destiny. Retrieved from http.//www.personal-Finance-insight.com/personal-financial planning

Schieg, M. (2007). Post-mortem analysis on the analysis and evaluation of risks in construction project management. Journal of Business Economics and Management, 8(2), 145-153

Shanks, G. (2010). A model of ERP project implementation. Journal of information Technology, 15(4), 289-303.

Sommer, R. & Sommer, B. (2001) A Practical Guide to Behavioural Research. (5th Edition). Oxford University Press. NY

Staehr, L. (2010). Understanding the role of managerial agency in achieving business benefits from ERP systems. Information System Journal, 20(3), 213-238

Stephen M. S. M. (2014). Determinants of Timely Completion of Projects in Kenya: A Case of Kenya Power and Lighting Company

Swink, M., (2010). Technological innovativeness as a moderator of new product design integration and top management support. Journal of Product Innovation Management, 17(3), 208-220.

Togar, M. S., Alan, C. W. and Ramaswami, S. (2004). Applying the Theory of Constraints to Supply Chain Collaboration. International journal, 9 (1), 23-29.

Turner, R. J. (2009). The Handbook of Project-Based Management. London: McGraw-Hill Companies.

Vinod K. S. (2003). Consumer Participation and Social Acceptance of Rural Electrification Strategies. Retrieved from http://www.energyanddevelopment.com/issue0105.htm

Wamukonya, N. (2013). Power sector reform in developing countries: mismatched agendas. Energy Policy, 31(12), 1273-1289.

Wustenhagen, R., Wolsink, M., & Burer, M. J. (2007). Social acceptance of renewable energy innovation: An introduction to the concept. Energy policy, 35(5), 2683-2691.

Young, R. & E. Jordan, H. (2008). Top management support: Mantra or necessity? International Journal in Project Management, 26(7), 713-725.

Zhang, L., Lee, M. K., Zhang, Z., & Banerjee, P. (2012). Critical success factors of enterprise resource planning systems implementation success in China. In System Sciences, 2003. Proceedings of the 36th Annual Hawaii International Conference on (pp. 10-pp). IEEE.

Zwikael, O. (2008). Top management involvement in project management – exclusive support practices for different project scenarios. International Journal of Managing Projects in Business, 1(3), 45-78.




DOI: http://dx.doi.org/10.61426/sjbcm.v3i2.264

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.