CHALLENGES FACING TIMELY COMPLETION OF ROAD PROJECTS MANAGED BY KENYA NATIONAL HIGHWAYS AUTHORITY

ROBERT ONYANGO OLOO

Abstract


The time required for the completion of road construction projects is influenced by a variety of factors both external to internal. Completion of a project within time stipulated at the tender a ward stage is a universally accepted measure of project success. Most projects would delay before they eventually take off. Helping the construction companies to identify the critical attributes responsible for achieving the desired efficient level (success factors) and also to find the attributes adversely affecting the project efficient (failure factors) has been the motivating factor behind this study. It is realized that maximization of the success factors and minimization of failure factors will ensure the construction industry realizes its efficient goals. The study was seeking to assess challenges facing timely completion of road projects managed by Kenya national highways authority. More specifically, it aimed at examining how budgetary provision and procurement procedures affected timely completion of road projects by Kenya National Highway Authority. The study adopted a descriptive survey design. The target population of the study was all the road engineers, middle managers and a few staffs (361) in the construction department of KeNHA. The sample size was 190 respondents. The researcher used stratified random sampling method to select the desired sample size of 150 respondents from the project Managers, top managers and few staffs. Data collected was cleaned, pretested, validated, and coded, summarized and analyzed using statistical package of SPSS V 23.  The study findings were presented using graphs, histograms, bar charts and pie charts.  Conclusions were derived based on the P. value and the coefficient of determination.  The findings indicated that majority of the respondents agree that budgetary provision and Procurement procedures strongly affected timely completion of road projects in KENHA implemented road projects in Kenya.

Key Words: Budgetary Provisions, Procurement Procedures, Road Projects


Full Text:

PDF

References


Chan, A.P.C. (2006), Determinants of project success in the construction industry of Hong Kong, University of South Australia, Armidale,

AGC (2011).Partnering A Concept for Success, Associated General Contractors, Washington, DC.

Al-Momani H., (2010), Examining service quality within construction processes, Technovation, 20, 643.651

Al-Meshekeh, H.S., Langford, D.A. (2009), "Conflict management and construction project effectiveness: a review of the literature and development of a theoretical framework", Journal of Construction Procurement, Vol. 5 No.1, pp.58-75.

Andersen, E.S., Grude, K.V., and Hang, T. (2010).Goal Directed Project Management: Effective techniques and strategies (Trans. From Norwegian by Roberta Wiig), 2nd edition. London: Kogan Page.

Baiden, B.K., (2007). Framework of the Integration of the Project Delivery Team.Unpublished Ph.D. Thesis, Southborough University.

Bent, James (2012). Project Management for Engineering and Construction. Englewood Cliffs, New Jersy, Prentice Hall, , p. 2.

Belbin, R.M. (2004), Management Teams – Why They Succeed or Fail, 2nd ed., Elsevier Butterworth-Heinemann, Amsterdam

Borg, W.R and Gall, M.D (2006).Educational Research: An Introduction, (5th Edition),

Chan, A.P.C. (2006a), "Novation contract – Client's roles across the project life cycle", Proceedings of CIB W92 Procurement Systems North Meets South: Developing Ideas, 14-17 January 2006, South Africa, pp.31-9.

Chan, A.P.C., Chan, D.W.M. (2003), "A benchmark model for construction duration in public housing developments", International Journal of Construction Management, Vol. 3 No.1, pp.11-14

Cheng, J., Proverbs, D.G., Oduoza, C.F., (2011). The satisfaction levels of UK construction Clients based on the performance of consultants. Engineering, Construction Architectural Management 13 (6), 567–583. 42

Chervier, S. (2003). Cross-cultural management in multinational project groups, Journal of World Business 38, 141–149.

Choudhury S., (2008), Project Management, New Delhi, p1-15

Deakin, P. (2009), "Client's local experience on design and build projects", Seminar Proceedings on Design and Build Procurement System, January, Hong Kong, pp.11-16

Ely, R.J., Thomas, D.A.,( 2001). Cultural diversity at work: the effects of diversity perspectives on work group processes and outcomes. Administrative Science Quarterly 46 (2), 229–273.

Emmitt, S., Gorse, C.A., (2007).Communication Construction Teams. Taylorand Francis, Oxon.

Granath, J.Å., Hinnerson, J. (2002), Delphi Study, Facility Management, School of Architecture, Chalmers University of Technology, Gothenburg

Hauschildt, J., Keim, G., Medcof, J.W. (2000), "Realistic criteria for project manager selection and development", Project Management Journal, Vol. 31 No.3, pp.23-32.

Haynes, N. & Love, P. E. D. (2004). Psychological Adjustment and Coping among Construction Project Managers.Construction Management and Economics, 22, 129-140.

Heaney, C. A., Price, R. H. & Rafferty, J. (2010).Increasing Coping Resources at Work: a Field Experiment to Increase Social Support, Improve Work Team Functioning, and Enhance Employee Mental Health.Journal of Organizational Behaviour, 16, 335-352.

Hemlin, D. (2009), "Contractor's local experience on design & build projects", Seminar Proceedings on Design and Build Procurement System, January, Hong Kong, pp.17-26 43

Hidenori, K. (2010), "Trust, integration and leadership: tenets of Japanese design and build", Design and Build Projects – International Experiences International Congress on Construction, 5-6 October, Singapore, pp.15-25.

Hussin A. &Abdelnasor O. (2006) “Role of Professionals in Construction Industry” The International Conference on Administration and Business, 14-15 November, Romania, p248

Kenya National Highways Authority project publications (2009-2012)

Kok, S.H. (2010), "Design and build – the local experience (with Public Client)", Design and Build Projects – International Experiences International Congress on Construction, 5-6 October, Singapore, pp.223-645.

Kothari, C. R. (2004). Research methodology: Methods and techniques, 2Ed. New Delhi: Wiley.

Lamont, A.H. (2009), "Evaluation of design & build tenders", Seminar Proceedings on Design and Build Procurement System, January, Hong Kong, pp.37-48

Latham (2012), Constructing the Team, HMSO, London

Leedy P. &Ormrod J.(2005), Practical Research-Planning and Design, New Jersey, p185.

Leung, K.S. (2009), "Characteristics of design and build projects", Seminar Proceedings on Design and Build Procurement System, January, Hong Kong, pp.1-10.

Lenard, H. & Francis, V. (2004).The Work-life Experiences of Office and Site-based Employees in the Australian construction industry.Construction Management and Economics, 22, 991-1002.

Likert, R. (2012).‘A technique for the measurement of attitudes’Archives of Psychology, 2.

Maslach, C. Schaufeli, W. B. &Leiter, M. P. (2001). Job Burnout.Annual Review of Psychology, 52, 397-422.

Mbeche I., (2000). Project Planning, Implementation and Evaluation-A Training Manual, United Nation Centre for Regional Development.August, 2000 Nairobi, pp 31-39.

Ng, S. T., Skitmore, R. M. & Leung, T. K. C. (2005).Manageability of Stress among Construction Project Participants. Engineering, Construction and Architectural Management, 12 (3), 264-282.

Ochieng, E.G., (2008).Framework for Managing Multicultural Project Teams.Unpublished Ph.D. Thesis.Loughborough University.

Pearson, J.C., Nelson, P.E., (2003). Human Communication. McGraw-Hill, New York.

Project management institute (2012), a guide to the project management body of knowledge.6th Ed. PA.Newton square Project management institute.

Rijk, A. E., Blanc, P. M., Schaufeli, W. B., &Jonge, J. J. (2008).Active Coping and Need for Control as Moderators of the Job Demand-control Model: Effects on Burnout. Journal of Occupational and Organizational Psychological, 71, 1-18.

Weatherley, S., (2011). ECI in Partnership with Engineering Construction Industry Training Board (ECITB), ECI UK Master class Multicultural Project Team Working, London, 6th December, .

Yip, B., Rowlinson, S., Kvan, T. &Lingard, H. (2005). Job Burnout within the Hong Kong Construction Industry: A Cultural Perspective. Proceedings of the CIB

PMBOK® Guide, 3rd Edition. Newtown Square, Pennsylvania, Project Management Institute, 2004, p. 37.

Lewis, J. (2007). Mastering project management: Applying advanced concepts to systems thinking, control & evaluation, resource allocation. McGraw Hill Professional.

Mugenda O. and Mugenda A. (2003).Research methods: Quantitative and Qualitative approaches.

Rippin, A. (2002), Team working, Capstone Publishing, Oxford.

Rowlinson, S. (2007), "Procurement systems: the view from Hong Kong", Procurement – a Key to Innovation: International Symposium of Commission W92, Montreal, pp.665-72.

Smith, A., Wilkins, B. (2006), "Team relationships and related critical factors in the successful procurement of health care facilities", Journal of Construction Procurement, Vol. 2 No.1, pp.30-40.

Ellis, R D & Thomas, H R (2003). The root causes of delays in highway construction. Final report.Transportation Research Board, Washington, D.C.




DOI: http://dx.doi.org/10.61426/sjbcm.v3i4.375

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.