The purpose of the study was to examine the influence of warehouse management on organizational productivity in state corporations in Kenya. The specific objectives of the study were: To examine the effects of stock control on organizational productivity and to establish the effects of distribution planning on organizational productivity. The study applied a descriptive research design. The target populations of the study were the employees of the Kenya Electricity Generating Company Limited (KENGEN). Data was collected by taking a census survey on the 117 respondents by the answering of questionnaires both quantitatively and qualitatively with a pilot test first conducted with 11 respondents. It was notable that there existed a strong positive relationship between the independent variables and dependent variable. This implied that the variables were very significant therefore needed to be considered in any effort to boost organizational productivity in state corporations in Kenya. The data findings analyzed also showed that taking all other independent variables at zero, a unit increase in stock control lead increase in organizational productivity in state corporations; a unit increase in distribution planning lead to increase in organizational productivity in state corporations. This inferred that access to stock control contributed most to organizational productivity in state corporations. The most significant factor was stock control. The study recommended for the enhancement stock control and the workforce needed external guidance with regard to stock control. There was need for more time to be taken in the processes within the warehouse. The impact of stock control training as enhanced by the organization should be well established in compliance with the rules and regulations. The study recommended for the proper distribution planning enhancing organizational productivity in the state corporations. The organization should ensure that the participatory planning was adequate. A review of literature indicated that there had been limited amount of research on the organizational productivity in the Kenyan context. Thus, the findings of this study serve as a basis for future studies on role of warehouse management on the organizational productivity in other organizations in Kenya. 

Key Words: Stock Control, Distribution Planning, Organizational Productivity


Full Text:

PDF

References


Aberdeen Group (2013), The Warehouse Productivity Benchmark Report; A Guide to Improved Warehouse and Distribution Center Performance. Aberdeen Group, Inc. 260 Franklin Street Boston, Massachusetts 02110-3112 USA

Arrowsmith, S. (2008). “National and International Perspectives on the Regulation of Public Procurement: Harmony or Conflict?” In Arrowsmith, S. & Davies, A. (Eds.), Public Procurement: Global Revolution 3-26). London, UK: Kluwer Law International.

Barney, J. B. (2008), Gaining and Sustaining Competitive Advantage. Addison – Wesley Publishing Company, New York

Basheka, B. C. (2008). Procurement Planning and Accountability of Local Government Procurement Systems in Developing Countries: Evidence from Uganda. Journal of Public Procurement , 8 (3), 379-406.

Blair F. 2004. Developing Warehouse management as a shared priority – vision to reality. IdeA, Sustainable Development Commission and Global to Local.

Business Daily Kenya; “Trend in corporate strategies,”10th December, 2012

Cox, A., Chicksand, D., and Ireland, P. (2005) Sub-Optimality in NHS Sourcing in the UK: Demand-Side Constraints on Supply-Side Improvement, Public Administration, 83(2), 367-392

Dimitrios P. Koumanakos (2010). The effect of inventory management on firm performance. International Journal of Productivity and Performance Management. 12-20

Eisenhardt, K.M. & Martin, J.A. (2000), Dynamic Capabilities: What Are They? Strategic Management Journal, 21(10/11), 1105-1121

Faber, Nynke; De Koster, Rene B. M. (2012), Linking warehouse complexity to warehouse planning and control structure: An exploratory study of the use of warehouse management information systems. International Journal of Physical Distribution & Logistics Management [online].32,(5), 381 – 395

Gadde L.E. and Håkansson H. Supply Network Strategies: John Wiley & Sons Ltd., 2007.

Heung Suk Hwang, Gyu Sung Cho (2006), A performance evaluation model for order picking warehouse design, Computers & Industrial Engineering 51(2), 335-342.

Hoskins, T. K., Martin, B., & Humphries, M. (2011). The Power of Relational Responsibility. Electronic Journal Of Business Ethics and Organization Studies, 16 (2), 22-27.

Institute of economic affairs (2014); Budget for 2014/2015: Balancing financing concerns while responding to spending inefficiencies.

Intaher Ambe (2012); Procurement Challenges In The South African Public Sector; Department of Business Management; University of South Africa (Unisa)

Johnson P.F. and Leenders M.R. Building A Corporate Supply Function [Journal] // Journal of Supply Chain Management. 2008. (3)44; 39-52.

Kelman, S. (2010). Procurement and Public Management: The Fear of Discretion and the Quality of Government Performance.Washington, DC: The AEI Press.

Kenya Institute of Public Policy Research and Analysis (2013). Kenya Economic Report: Creating an Enabling Environment for Stimulating Investment for Competitive and Sustainable Counties

Kenya law reports (2015). www.klr.org accessed 20th February 2015

Kirkpatrick, D. (1994). Evaluating Training Programs. Berrett-Koehler.

Lars Bedey (2008), Purchasing Management; Chalmers Department of Technology Management and Economics; Published by Elpida Memory Inc.

Lizardo, J. (2009). International Control on Organizational assets in Kenyan Parastatals. KIsumu, Kenya: East Africa Union Internal Control Seminor.

Mahmood, S.A.I. 2010. Public procurement and corruption in Bangladesh: confronting the challenges and opportunities. Journal of Public Administration and Policy Research 2(6): 103–11.

Mugenda, O.O. & Mugenda A.G. (2008). Research Methods Qualitative and Quantitative Approaches. African Center for Technology Studies, ACTS press, Nairobi Kenya.

Odhiambo, W. & Kamau, P. 2003. Public procurement: Lessons from Kenya, Tanzania and Uganda. OECD Development Centre Working Paper No. 208.

Ogbo Ann (2014), The Impact of Effective Inventory Control Management on Organisational Performance: A Study of 7up Bottling Company Nile Mile Enugu, Nigeria. Mediterenean Journal of Social Sciences

Organisation for Economic Co-operation and Development (2009); Regulatory Policy and the Road to Sustainable Growth

Patrick Kakwezi and Sonny Nyeko (2010): Procurement Processes and Performance: Efficiency and Effectiveness of The Procurement Function. Department of Procurement and Logistics Management, Makerere University Business School

Public Procurement Oversight Authority (2009); Public Procurement and Disposal General Manual. Government Press, Nairobi Kenya

Quayle M. Purchasing and Supply Chain Management: Strategies and Realities [Book]. [s.l.] : Idea Group Publishing, 2006.

Service Delivery and Performance Commission (2009); Report on the Review of Purchasing and Logistics in the Queensland Government; Published by Aberdeen Group

Shevchenko A.A. and Shevchenko O.O. B2B e-hubs in emerging landscape of knowledge based economy [Journal] // Electronic Commerce Research and Applications. 2005. (4) 113-123.

Shuttleworth, M. (2008). qualitative and quantitative research design. Michigan University Press

Simms, N. (2005). Procuring for the future. Warehouse management National Action Plan: Cambridge Education Press, UK

Taplin, H. C. (2012). Theory of Change: A Primer on Theory of Chage. New York: The Rockefeller Foundation

Teece, D.J. (2007), Explicating Dynamic Capabilities: the nature and micro foundations of (sustainable) enterprise performance. Strategic Management Journal 28: 1319 -1350.

Teece, D.J. (2010), Technological innovation and the Theory of the Firm: The Role of Enterprise – level Knowledge, Complimetaries and Dynamic capabilities. In N. Rosenberg and B.Hall (eds). Handbook of the Economics of Innovation,

Thai, K. V., & Grimm, R. (2009). “Government Procurement: Past and Current Developments.” Journal of Public Budgeting, Accounting & Financial Management, 12(2); 231-247.

Volker Blanz (2013). Government to Business (G2b) E-Services in Bulgaria – Specifics and Development. New Bulgarian University

Walter, A., Ritter, T., Gemunden, H. G., ”Value Creation in Buyer-Seller Relationships”, (2001), 366

Wood J. Organizational Configuration as an Antecedent to Buying Center's Size and Structure [Journal] // The Journal of Business & Industrial Marketing. 2005. (20); 263-275.

Zhang, Q. Vonderembse, M.A. and Lom, J.S. (2012). Logistic Flexibility and Its Imapct on Customer Satisfaction” The Internaitonal Journal of Logistics Management, 16(1):89-96.




DOI: http://dx.doi.org/10.61426/sjbcm.v4i2.455

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.