THE EFFECT OF CRITICAL SUCCESS FACTORS ON THE COMPLETION OF PUBLIC CONSTRUCTION PROJECTS IN MACHAKOS COUNTY KENYA

JAMES MUREITHI GITONGA

Abstract


The general objective of this study was to establish the critical success factors influencing completion of public construction project in Machakos County. The specific objectives of the study was to; assess the influence of Project communication and top management support on completion of public construction project in Machakos County. The research study adopted a descriptive survey design. The study focused on the critical success factors influencing completion of public construction project in Machakos County. The target populations for this research was 64 consisting of all 14 technical officers (Engineers, Architects, quantity surveyors) based at the county headquarters, 12 project liaison officers representing each of the 12 departments forming Machakos County government and 30 contractors undertaking government-funded buildings construction projects under the County. The research study adopted a descriptive survey design. According to the findings, there was a positive relationship between two factors and completion of public construction project. The positive relationship indicated that there was a correlation between the factors and the completion of public construction project. Based on the findings, Project communication had the highest influence on completion of public construction project, followed by top management support. With regard to Project communication the study concluded that Project managers should focus on making sure that stakeholders are understood in terms of their communications needs. It also involves determining what communication outputs would be exchanged over the course of the project for example status updates, minutes of meetings, reports on deliverables. Project managers should make careful plans to outline who receives which communications, who is responsible to deliver and respond to communication content, and how and when communications will be delivered. This study recommended that all the project technical team should be trained on all factors that influence successful completion of public construction projects. They should be educated on the key metrics of a successful project. Budget, scope and timelines should be deliberately managed so that a quality project can be realized.

Key Words: Project Communication, Top Management Support, Completion of Public Construction Projects


Full Text:

PDF

References


Ahadzie D., Proverbs D. and Olomolaiye P. (2012) „Critical success criteria for mass housing building projects in developing countries‟ International Journal of Project Management vol. 26,

Ahmed, S.M., Azhar, S., Castillo, M., Kapagantulla, P., (2012) Construction delays in Florida: An Empirical Study Florida: State of Florida Department of Community Affairs.

Ameh, J. O., &Osegbo E. E. (2011).Study of relationship between time overrun and productivity on construction sites. International Journal of Construction Supply Chain Management, Vol. 1 (1).

Ankrah, N.A. & Langford, D.A. 2015, "Architects and contractors: a comparative study of stakeholder influence s", Construction Management and Economics, vol. 23.

Bertelsen, S. 2013, "Complexity: construction in a new perspective", 11th Annual conference in the international group for lean construction.

Bordens, K. S., & Abbott, B.B. (2011).Research design methods: A process approach (7th ed.).New York, NY: McGraw-Hill.

Bryman,A., & Cramer. 2012). Quantitative data analysis with SPSS for windows. London. Routledge.

Cokins, G., (2016), Performance management In: Adkins, T. (Ed.), Case studies in Performance Management: A Guide from the Experts. John Wiley & Sons, New Jersey,

Cooper, R.D., & Schindler, P.S. (2010).Business Research Methods.(8thedn.).New Delhi: Tata McGraw-Hill Edition.

Creswell, J. W. (2002).Educational research: Planning, conducting, and evaluating quantitative and qualitative approaches to research. New Jersey: Merrill/Pearson Education.

De Boer, R. (2008). Resource-constrained multi-project management -A hierarchical decision support system. PhD thesis, University of Twente, Enschede.

Government of the Republic of Kenya (2011): Kenya Vision 2030: A Globally Competitive and Prosperous Kenya. Government Printers

Grifa, D., (2007). The future of international construction, London, Thomas Telford. Kenya: Government Printers.

Fellows, R. and Liu, A. (2007), Research Methods for Construction, Blackwell Science Ltd., Oxford.

Kometa.G and Olomolaiye, E (1997), Cost Studies of Buildings, 4th edition, Pearson Prentice Hall.

Khan R.A., (2013). Role of Construction Sector in Economic Growth: Empirical Evidence from Pakistan Economy. Proceedings of the first International Conference on Construction in Developing Countries (ICCIDC–I) titled‘ Advancing and Integrating Construction Education, Research & Practice’ ,August 4-5, Karachi.

Kvale, S. (2007).Doing Interviews. Thousands Oaks, CA:Sage.

Lee, S., Pena-Mora, F. & Park, M. 2013, "Dynamic quality and change management framework for concurrent design and construction", ASCE Construction Research.

Luu, V.T., Kim, S., Huynh, T., 2010. Improving project management performance of large contractors using benchmarking approach: Int. J. Project Management.

Lock, D., (2007). Project Management, 9thedition, Gower Publishing, England Barnes, M., (2012). Association of Project Management President: At its most Fundamental, Project Management is about people getting things done.

Toor, S.-u.-R. and Ogunlana, S. O. (2008), “Construction professionals' perception of critical success factors for large-scale construction projects”, Construction Innovation, 9, 149-167.

ILO, (2011).The construction industry in the twenty first century: Its image, employment prospects and skill requirements. International Labor Office, Geneva.

Memon, A., Rahman, I., &Azi, A. (2012). Time and Cost performance in Construction Projects in Southern and Central Regions of Penisular Malaysia. International Journal of Advances in Applied Sciences, Vol. 1(1), pp. 45–52.

Metri, E. (2014), Understanding the Construction Client. 1st Ed.London: Blackwell Publishing.

Mugenda, A.G. (2008). Social Science Research. Nairobi: Acts Press.

Mugenda,A. , & Mugenda, O. (2008).Research methods; quantitative and qualitative

Muijs, D.(2014). Doing quantitative research in education with SPSS. Thousand Oaks,

Njuguna, J. (2008). The Construction Industry in Developing Countries: Alternative Strategy for Development, Croom Helm.

Neuman, W.L. (2010). Social Research Methods: Qualitative and Quantitative Approaches. Boston: Allyn & Bacon Publishers.

OLATUNJI, A. A. (2010). Influences on construction project delivery time, (PhD. Thesis) Nelson Mandela Metropolitan University, Eastern Cape, South Africa.

Orodho, A.J. (2013). Essentials of Educational and Social Science Research methods: Qualitative and Quantitative Approaches. Nairobi: Acts Press.

Patton, M. Q. (2012). Utilization-focused evaluation (4th ed.). Thousand Oaks, CA: Sage.

Pollack-Johnson, B., Liberatore, M., 1998. Project management software: usage patterns and suggested research directions for future developments. Project Management Journal 29 (2), 19–28.

Pinto, J.K., Covin, J.G., 2014. Critical factors in project implementation: a comparison of construction and R&D projects. Technovation 9, 49–62.

Popper, K. (2013). Conjectures and Refutations. California: Mayfield Publishing Company. Qualitative and Quantitative Approaches. Nairobi: Acts Press.

Republic of Kenya, (2012).Sessional paper No. 10 of 2012 On Kenya Vision 2030.NairobiResearch Methods .Las Vegas: Acts Press.

Rockart, J. (2010). Chief Executives Define Their Own Information Needs.: Harvard Business Review, March/April 1979, 81-92.

Sweis, G. J. (2013). Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan. International Journal of Business and Management; Vol. 8 (23).

Westerveld, E (2013) The Project Excellence Model: Linking Success Criteria And Critical Success Factors. International Journal of Project Management, 21, 411-418.

Young, N. (2009). Understanding the Research Process and Methods. An Introduction

Yang, J., Shen, G.Q., Ho, M., Drew, D.S., & Chan, A.P.C. (2009).Exploring critical success factors for stakeholder management in construction projects. Journal of Civil Engineering and Management, Vol. 15 (4), pp. 337-348.




DOI: http://dx.doi.org/10.61426/sjbcm.v4i3.525

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.