INFLUENCE OF PROCUREMENT METHODS ON PROCUREMENT PERFORMANCE IN PUBLIC HOSPITALS IN KENYA. A CASE OF KENYATTA NATIONAL HOSPITAL

MERCY GITHINJI

Abstract


This study sought to find the influence of procurement methods on procurement performance in public hospitals in Kenya, using a case of KNH. Specifically, the study sought to find the influence of internationals competitive tendering on procurement performance in public hospitals in Kenya; to establish the influence of national competitive tendering on procurement performance in public hospitals in Kenya; to determine the influence that restricted tendering has on procurement performance in public hospitals in Kenya; and to find out the influence of direct procurement on procurement performance in public hospitals in Kenya. The study used a descriptive survey research design with a target population of 6,000 employees and management at KNH. Further, this study adopted stratified sampling with a base sample size of 90 respondents. The study used structured questionnaires for collecting primary data from the respondents. SPSS together with Microsoft Excel were used for data analysis. The statistical parameters generated from the software were presented in tables and charts for easier interpretation. Multiple Linear Regression Analysis was used to estimate the relationship between the dependent and independent variables, and provided a means of objectivity in assessing the degree and nature of the relationship between the dependent and independent variables. The study established that only International Competitive Tender and National Competitive Tender variables had a positive and statistically significant influence on the dependent variable (Procurement Performance). Both Restricted Tender and Direct Procurement were statistically insignificant. Therefore the study concluded that a combination of all this methods does not necessary result in better procurement performance. Further, the study concluded that competitive tendering leads to better procurement performance. This study therefore recommended that policy makers at KNH give an edge to competitive tendering over other methods of procurement particularly Restricted Tendering and Direct Procurement.

Key Words: Internationals Competitive, Restricted Tendering, Direct Procurement, National Competitive Tendering, Procurement Performance


Full Text:

PDF

References


Adams, K. M., Hester, P. T., Bradley, J. M., Meyers, T. J., & Keating, C. B. (2014). Systems theory as the foundation for understanding systems. Systems Engineering, 17(1), 112-123.

Afriyie, B. B. (2015). Factors influencing the selection of procurement methods for construction works in Ghana (Doctoral dissertation).

Ahmadi, A., Pishvaee, M. S., & Torabi, S. A. (2018). Procurement Management in Healthcare Systems. In Operations Research Applications in Health Care Management (pp. 569-598). Springer, Cham.

Akuffo, M. K. (2014). Assessing the level of compliance with the public procurement Act 2003,(Act 663) in selected public entities in Upper Denkyira East Municipality, Central Region(Doctoral dissertation).

Amayi, F. K., & Ngugi, G. K. (2013). Determinants of public procurement performance in Kenya: Case Ministry of Environment, Water and Natural Resources. International Journal of Social Sciences and Entrepreneurship, 1(5), 647-667.

Amemba, C. S., Nyaboke, P. G., Osoro, A., & Mburu, N. (2013). Challenges affecting public procurement performance process in Kenya. International Journal of Research in Management, 3(4), 41-55.

Amo Asante, F. (2016). Evaluation of procurement processes and its operational performance in the public sector of Ghana: A case study of Kumasi South Hospital (Doctoral dissertation).

Arrowsmith, S., & Quinot, G. (Eds.). (2013). Public procurement regulation in Africa. Cambridge University Press.

Baiden, B., Abdul-Razak, S., & Danku, J. (2015). The impact of project risk factors on national competitive tendering procurement method in Ghana. International Journal of Procurement Management, 8(6), 731-752.

Baily, P., Farmer, D., Crocker, B., Jessop, D., & Jones, D. (2008). Procurement principles and management. Pearson Education.

Bashir, M., Afzal, M. T., & Azeem, M. (2008). Reliability and validity of qualitative and operational research paradigm. Pakistan journal of statistics and operation research, 4(1).

Beckford, J. (2016). Quality: A critical introduction. Routledge.

Blumberg, B., Cooper, D. R., & Schindler, P. S. (2014). Business research methods. London: McGraw-Hill Education

Bochenek, J. (2014). The contractor selection criteria in open and restricted procedures in public sector in selected EU countries. Procedia Engineering, 85(0), 69-74.

Bollapragada, R., Kuppusamy, S., & Rao, U. S. (2015). Component procurement and end product assembly in an uncertain supply and demand environment. International Journal of Production Research, 53(3), 969-982.

Buuri, J. M. (2016). Factors Affecting Implementation of Open Tendering Process in Public Institutions.

Cohen, J., Cohen, P., West, S. G., & Aiken, L. S. (2013). Applied multiple regression/correlation analysis for the behavioral sciences. Routledge.

Colton, D., & Covert, R. W. (2007). Designing and constructing instruments for social research and evaluation. John Wiley & Sons.

Coughlan, M., Cronin, P., & Ryan, F. (2007). Step-by-step guide to critiquing research. Part 1: quantitative research. British journal of nursing, 16(11), 658-663.

Coviello, D., Guglielmo, A., & Spagnolo, G. (2017). The effect of discretion on procurement performance. Management Science.

Dillman, D. A., Smyth, J. D., & Christian, L. M. (2014). Internet, phone, mail, and mixed-mode surveys: the tailored design method. John Wiley & Sons.

Fiedler, F. R. E. D. (2015). Contingency theory of leadership. Organizational Behavior 1: Essential Theories of Motivation and Leadership, 232, 01-2015.

Fincham, J. E. (2008). Response rates and responsiveness for surveys, standards, and the Journal. American journal of pharmaceutical education, 72(2), 43.

Gall, M. D., Gall, J. P., & Borg, W. R. (2007). Collecting research data with questionnaires and interviews. Educational research: An introduction, 227-261.

Garson, G. D. (2012). Hierarchical linear modeling: Guide and applications. Sage.

Gbogr, J. M. (2017). Examining the impact of works procurement methods in the Ghana Armed Forces (Doctoral dissertation).

Getuno, P. M., Awino, Z. B., Ngugi, P. K., & Mwaura, F. (2015). Implementation Of The Public Procurement And Disposal Act, (2005)-Kenya And Organizational Performance. DBA Africa Management Review, 5(1).

Ghadamsi, A., & Braimah, N. (2012). The influence of procurement methods on project performance: A conceptual framework. In The CIB International conference entitled: management of construction: research to practice (pp. 1-6).

Ghasemi, A., & Zahediasl, S. (2012). Normality tests for statistical analysis: a guide for non-statisticians. International journal of endocrinology and metabolism, 10(2), 486.

Hanson, B. (2014). General Systems Theory-Beginning With Wholes: Beginning with Wholes. Taylor & Francis.

Haque, M. (2010). Sampling methods in social research. Global Research Methodology, 1-6.

Hargie, O., & Tourish, D. (2009). Data collection log-sheet methods. Auditing Organizational Communication: A Handbook of Research, Theory and Practice, 123.

Hensher, D. A., & Stanley, J. (2008). Transacting under a performance-based contract: The role of negotiation and competitive tendering. Transportation Research Part A: Policy and Practice, 42(9), 1143-1151.

Holbrook, A., Krosnick, J. A., & Pfent, A. (2007). The causes and consequences of response rates in surveys by the news media and government contractor survey research firms. Advances in telephone survey methodology, 499-528.

Ika, L. A. (2012). Project management for development in Africa: Why projects are failing and what can be done about it. Project management journal, 43(4), 27-41.

Ika, L. A., Diallo, A., & Thuillier, D. (2012). Critical success factors for World Bank projects: An empirical investigation. International journal of project management, 30(1), 105-116.

Iregi, A. N., & Kipkorir, M. G. (2017). The Effects of Procurement Processes on the Performance of Public Sector Organizations-A Case Study of Kenya Electricity Generating Company Limited Naivasha Station. Imperial Journal of Interdisciplinary Research, 3(3).

Jacob, O. A. (2010). Procurement law in Nigeria: Challenge for attainment of its objectives. U. Botswana LJ, 11, 131.

Johnson, P. F., Leenders, M. R., & McCue, C. (2017). A comparison of purchasing’s organizational roles and responsibilities in the public and private sector. Journal of Public Procurement, 3(1), 57-74.

Kakwezi, P., & Nyeko, S. (2010). Procurement processes and performance: Efficiency and effectiveness of the procurement function. Retrieved April, 3(2011), 1-22.

Kalatya, B. (2017). Influence of Procurement Practices on Performance of Logistic Firms in Kenya. Strategic Journal of Business & Change Management, 4(4).

Keraro, V. N. (2014). Role of Governance in the Strategic management of Counties in Kenya. JKUAT.

Kiilu, C. (2016). The Influence of Goods Receipt and Sorting and Loading and Delivery to Client Practices on Inventory Management Performance in Humanitarian Organizations; A Case Study of Afghan Red Crescent Society Medical Supply Chain. International Journal of Supply Chain Management, 1(1), 62-74.

Kinyua, B. K. (2015). An assessment of just in time procurement system on organization performance: A case study of corn products Kenya limited. European Journal of Business and Social Sciences, 4(05), 40-53.

Kiruja, K. B. (2014). Procurement Methods and Procurement Performance amongst State Corporations under The National Treasury of Kenya (doctoral dissertation, University of Nairobi).

Kombo, D. K., & Tromp, D. A. (2011). Proposal and thesis writing; an introduction; 2nd reprint; Pauline Publication Africa; Kenya.

Lemayian, D., & Moronge, M. (2018). Determinants of Procurement Process Enhancement of Supplies in Public Hospitals in Kenya. Strategic Journal of Business & Change Management, 5(1), 720-744.

Levy, P. S., & Lemeshow, S. (2013). Sampling of populations: methods and applications. John Wiley & Sons.

Love, P. E., Davis, P. R., Edwards, D. J., & Baccarini, D. (2008). Uncertainty avoidance: public sector clients and procurement selection. International Journal of Public Sector Management, 21(7), 753-776.

Markowski, S., Hall, P., & Wylie, R. (Eds.). (2009). Defence procurement and industry policy: a small country perspective. Routledge.

Masanja, K. (2013). Tendering procedures in public sector: The case of Ilala municipal council (Doctoral dissertation, Mzumbe University).

Matthew, K., Patrick, K., & Denise, K. (2013). The effects of fraudulent procurement practices on public procurement performance. International Journal of Business and Behavioral Sciences, 3(1), 17-27.

Mbae, N. (2014). Public Procurement Law and Procurement Performance of County governments in Kenya: Case of Machakos county government.

McMillan, J. H., & Schumacher, S. (2014). Research in education: Evidence-based inquiry. Pearson Higher Ed.

Mugenda, A. G. (2008). Social science research: Theory and principles. Nairobi: Applied.

Mugenda, O. M., & Mugenda, A. G. (2012). Research methods dictionary.

Mukura, P. K., Shalee, N., Kanda, M. K., & Ngatia, P. M. (2016). Role of Public Procurement Oversight Authority on Procurement Regulations in Kenyan State Corporations. A Case of Kenya Electricity Generating Company (KenGen). International Journal of Academic Research in Accounting, Finance and Management Sciences, 6(3), 190-201.

Muraguri, J. T. (2013). Implementation of the youth preference and reservations policy in public procurement: The case of state owned enterprises in Nairobi. Unpublished MBA Research Project, University of Nairobi.

Mwangi, E. W., & Kagiri, A. (2016). Effects of e-procurement on procurement performance in hospitality industry in Kenya: Case of Sarova chain of hotels. International Academic Journal of Procurement and Supply Chain Management, 2(2), 1-19.

Mwangi, P. G., Kiarie, D., & Kiai, R. (2018). Integrated financial management information System, procurement performance and customer Satisfaction in the county government of nyeri. International Journal of Supply Chain Management, 3(1), 27-45.

Ngobeni, S. A. (2011). An analysis of the tender process in national government in South Africa (Doctoral dissertation, North-West University).

Njoki, G. N., & Kimiti, G. (2015). Influence of Competitive Procurement Practices on Service Delivery in Public Hospitals in Nakuru Kenya. International Journal of Economics, Commerce and Management, 6(4), 72-89.

Ondigi, S. K., & Muturi, W. (2015). Factors Affecting Public Procurement of Hospital Supplies in Public Health Institutions in Kenya: A Case Study of Kisii Teaching and Referral Hospital, Kenya. International Journal of Economics, Commerce and Management, 3(11), 863-872.

Oppong, D. (2013). The Impact of the Implementation of Public Procurement Act 2003 (Act 663), on the Timely Delivery of Goods and Services: A Case Study of Ghana Water Company Limited (GWCL). International Journal of Application or Innovation in Engineering & Management (IJAIEM), 2, 107-121.

Orodho, J. A. (2009). Elements of education and social science research methods. Nairobi/Maseno, 126-133.

Oso, W. Y., & Onen, D. (2009). A general guide to writing research proposal and report. Jomo Kenyatta Foundation.

Patil, T. C., & Waghmare, A. P. (2014). Tender and Bidding in Construction Projects. Int. Journal of Engineering Research and Applications, 4(12), 18-22

Philly, R. K., Were, S., & Nkirina, S. P. (2017). Effects of Conflict Of Interest on Procurement Performance in Referral Hospitals in Kenya: A Case of Kenyatta National Hospital (KNH) Nairobi, Kenya. International Journal of Supply Chain Management, 2(2), 22-41.

Ramanathan, C.T., & Narayanan, S. (2016). Project Procurement Methods and Success of Infrastructure Projects in Malaysia. International Journal of Innovative Research in Science, Engineering and Technology, 5(14), 346-353

Rea, L. M., & Parker, R. A. (2014). Designing and conducting survey research: A comprehensive guide. John Wiley & Sons.

Rose-Ackerman, S., & Palifka, B. J. (2016). Corruption and government: Causes, consequences, and reform. Cambridge university press.

Rotich, G. K., & Okello, B. (2015). Analysis of use of e-procurement on performance of the procurement functions of County Governments in Kenya. International Journal of Economics, Commerce and Management, 3(6), 1381-1398.

Salaria, N. (2012). Meaning of the term descriptive survey research method. International journal of transformations in business management, 1(6), 161-175.

Silwimba, S. (2017). An Investigation of the Effects of Procurement Methods on Project Delivery in the Zambian Road Sector. Global Journal of Research In Engineering.

Snider, K. F., & Rendon, R. G. (2008). Public procurement policy: Implications for theory and practice. Journal of public procurement, 8(3), 310-333.

Song, Z., Landrum, M. B., & Chernew, M. E. (2013). Competitive bidding in Medicare Advantage: Effect of benchmark changes on plan bids. Journal of health economics, 32(6), 1301-1312.

Synyenlentu, J., Badu, E., & Peprah, O. M. (2015). The impact of Public Procurement Act 663 on the procurement of essential water treatment chemicals at Ghana Water Company Limited. International Journal of Innovation and Applied Studies, 10(2), 707.

Tai, Y. M. (2017). Role of management capability and web-enabled direct procurement in creating competitive direct procurement advantage. International Journal of Logistics Systems and Management, 26(1), 125-143.

Tai, Y. M. (2017). Web-enabled direct procurement and competitive advantage: mediating effects of interorganisational management capability. International Journal of Procurement Management, 10(6), 665-682.

Takano, Y., Ishii, N., & Muraki, M. (2014). A sequential competitive bidding strategy considering inaccurate cost estimates. Omega, 42(1), 132-140.

Tavakol, M., & Dennick, R. (2011). Making sense of Cronbach's alpha. International journal of medical education, 2, 53.

Tetteh, E. (2014). Causes and effects of delays in procurement of works at pre-tender stage in Upper Denkyira East Municipal Assembly (Doctoral dissertation).

Tweneboah S., E., & Ndebugri, H. (2017). Evaluating the effectiveness of the Procurement Acts in public financial administration; the case study in Ghana.

Van de Ven, A. H., Ganco, M., & Hinings, C. B. (2013). Returning to the frontier of contingency theory of organizational and institutional designs. Academy of Management Annals, 7(1), 393-440.

Vos, F. G., Schiele, H., & Hüttinger, L. (2016). Supplier satisfaction: Explanation and out-of-sample prediction. Journal of business research, 69(10), 4613-4623.

Waigwa, M. W., & Njeru, A. (2016). Factors influencing management of procurement contracts in public security agencies: A case of Kenya Police Service. International Academic Journal of Procurement and Supply Chain Management, 2(2), 20-40.

Whitchurch, G. G., & Constantine, L. L. (2009). Systems theory. In Sourcebook of family theories and methods (pp. 325-355). Springer, Boston, MA.

Zohrabi, M. (2013). Mixed method research: Instruments, validity, reliability and reporting findings. Theory and Practice in Language Studies, 3(2), 254.




DOI: http://dx.doi.org/10.61426/sjbcm.v5i2.766

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.