DETERMINANTS OF SUSTAINABILITY OF RURAL WATER PROJECTS IN KENYA: A CASE STUDY OF THE NETHERLANDS DEVELOPMENT ORGANISATION (SNV) SUPPORTED WATER SCHEMES IN KAJIADO COUNTY

RONALD KWENA

Abstract


The central problem of this study was that despite the government efforts coupled by donor aid to enhance rural water projects sustainability, performance has continued to deteriorate with high project malfunctioning. Causes of the high project failure have not been adequately discussed; hence minimal intervention. To this end, the project purpose was to establish the determinants of rural water projects sustainability in Kenya with a focus on NGO supported projects. The study considered sustainability as the dependent variable and sector policy, post implementation impact evaluation, choice of technology and water committee management skills as the independent variables.    A descriptive research design was adopted and stratified sampling utilized.  Both qualitative and quantitative data analysis was used to analyze the research data.  The study established that there is a strong positive influence on sustainability of rural water sustainability attributable to units of change of all the independent variables. There was a positive correlation of 0.504 between sector policy and sustainability; 0.296 between choice of technology and sustainability; 0.370 between water committee management skills and sustainability and 0.219 post implementation impact evaluation and sustainability.  The study recommends further review and study of the sector policy, post implementation impact evaluation, choice of technology and water committee management necessary for achieving sustainability of rural water supplies. Further research on areas requiring post implementation support is also recommended as many rural water facilities begin to experience challenges after the third year of implementation.

Key Words: Sustainability, Rural Water Project


Full Text:

PDF

References


Ashley, J. (1996). PRINCE in small organizations. Retrieved February 10, 1998 from the World Wide Web: http://www.avnet.co.uk/tesseract/PiP/articles /Ashley/Ashley.

Badiru, A., B. (2012). Project management tools for engineering and management professionals. Norcross, GA: Industrial Engineering and Management Press.

Barnes, R. (2003) A critical look at critical chain project management, Project Management Journal.

Burke, R. (2003). Project management planning and control (2nd ed. New York: JohnWiley & Sons).

Braxton, P. (2008), "Balancing accountability and efficiency in a more competitive private sector environment", Australian Journal of Private Administration, Vol. 59 No.3, pp.58-71.

CIDA (2000) Planning and Implementation of SWAps: An Overview. Issues Paper prepared as a background document for CIDA President's Forum on Sector-Wide Approaches (SWAps) October 10, 2000

Curtis, M. (1996). A framework for project management. Software Quality Journal, 5, 97-105.

Dinsmore, P., C. (1993).The AMA handbook of project management. New York: AMACOM.

DWD (2002a) Overview of the Water Sector, Reform, SWAP and Financial Issues. Issue Paper 1: Directorate of Water Development, Ministry of Water, Lands and Environment, The Republic of Uganda.

DWD (2002b) Rural Water and Sanitation Operation Plan: 2002-2007. Version 1, September 2002, Directorate of Water Development, Ministry of Water, Lands and Environment, The Republic of Uganda.

Eisner, H. (1997). Essentials of project and systems engineering management. New York: John Wiley & Sons, Inc.

Eyaa, S. & Oluka, P. (2011). Explaining non- compliance in private procurement in Uganda. International Journal of Business and Social Science, 2(11).

Goodman, L. J. (1984, December). Integrated project planning and management: A new approach. Project Management Journal, 15(4), 66-76.

Graham, G., Matthews, D. (2002). “The Economic Context of Government Procurement: New Challenges and New Opportunities”. Journal of Private Procurement, 2 (1): 55-71.

Green, D., Salkind, S. (2003). Building Political Collusion: Evidence from Procurement Auctions.Discussion Paper, 4939.

Harvey, P. A.and Reed, R. A. (2004) Rural Water Supply in Africa: Building Blocks for Handpump Sustainability WEDC, Loughborough University, UK.

Harvey, P.A., Jawara, D. and Reed, R.A. (2002a) Sustainable Handpump Projects in Africa: Report on Fieldwork in Ghana. WEDC, Loughborough University: UK.

Hodgkin, J.and WASH Project Sponsors(2004). The Sustainability of donor Assisted Rural Water Supply Projects.Water and Sanitation for Health Project. WASH Technical Report No. 94. Washington, DC

IRC International Water and Sanitation Centre.(2011). Lessons for Rural Water Supply. Assessing progress towards sustainable service delivery, Ethiopia

Jansz, S. (2011).A Study into Rural Water Supply Sustainability in Niassa Province, Mozambique, WaterAid

Kenya Joint Assistance Strategy (2007-2012), published by the Aid Effectiveness Group and GoK Treasury, 2007

Kliem, R. L., & Ludin, I. S. (2006). Developing a project management methodology for is environments. Managing System Development, 1-4.

Koroknay, J. W. (1993). Software development using process project management. Project Management Institute 24th Annual Seminar/Symposium: papers present October 1 to October 7, 1993, 544-552.

Kothari, C. R., (2007). Research Methodology Methods and Techniques.(Pp1-56). New Delhi: New Age International (P). ltd.

Laufer, A. (1991, June). Project planning: Timing issues and path of progress. Project Management Journal, 22(2), 39-45.

Laufer, A. (2007). Simultaneous Management. New York: AMACOM.

Lewis, J. P. (2005). Fundamentals of project management. New York: American Management Association.

Lewis, J. P. (1995). Project planning, scheduling & control (Rev. ed.). Chicago: IRWIN Professional Publishing.

Lockwood, H. and Smits, S (2011). Supporting Rural Water Supply. Moving towards a Service Delivery Approach. Practical Action Publishing Ltd. Warwickshire, UK

McNeil, H. J., & Hartley, K. O. (1986, March). Project planning and performance. Project Management Journal, 17(1), 36-43.

Mugenda, A. and Mugenda. (2003). Research Methods: Quantitative and Qualitative Approaches. Nairobi: Act Press.

Mwamati F.T. (2007). Factors Determining Sustainability of Rural Community Water projects in Kenya. MBA Executive Thesis. Moi University, Eldoret, Kenya

Nidumolu, S. R. (1996). Standardization, requirements uncertainty and software project performance. Information & Management, 31, 135-150.

Ogus, A.L. (2004) Regulation: Legal forum and economic theory. Oxford University Press.

Oraro, E. J. (2012). Determinants of Delays in Construction of Community Water Projects in district. A Case of GOK UNICEF WASH Programme. M.A Thesis. University of Nairobi. Nairobi, Kenya

Scoy, R. L. (2002). Software development risk: opportunity, not problem. (Tech. Rep. No. CMU/SEI-92-TR-30 / ESC-TR-92-030). Pittsburgh, Pennsylvania: Carnegie Mellon University, Software Engineering Institute.

SNV. (2014) Systematic issues behind non functionality of rural water points in Kenya, A case of Kisumu, Final draft report, Homa Bay, Siaya.

SNV. (2013) Functionality: The challenge to sustain rural water supply services. SNV Practice Brief Issue 5, October 2013

Stone, W., & Archibald, R. D. (2003). Team planning workshops cut project time and cost. Project Management Institute Seminar/Symposium: papers presented October 1-7, 1993, 491-494.

Trémolet, S. and Browning, S. (2002) The Interface between Regulatory Frameworks and Tri-Sector Partnerships. Business Partners for Development, Water and Sanitation Cluster: London.

Tryon and Associates (2000). Managing single-time efforts: project management in the information age [seminar].

Water and Sanitation Programme- Field Note (2010).Sustainable Management of Small Water Supply Systems in Africa. Practitioner’s Workshop Report. October 6-8. 2010.

WELL (1998) DFID Guidance manual on water supply and sanitation programmes. WELL, WEDC, Loughborough University, UK, 1998,

Wideman, R. M. (2002). Managing project development for better results. Project Management Quarterly, 12(3), 13-19.

World Bank (2004) PRSP Source Book. World Bank: Washington D.C. http://www.worldbank.org/poverty/strategies/sourcons.htm

Zells, L. (2011). Balancing trade-offs in quality, cost, schedule, resources, and risk. Project Management Institute Seminar/Symposium: papers present September 28 toOctober 2, 1991, 406-411.

Zambia-Water (2004) WASHE. http://www.zambia-water.org.zm/washe.htm




DOI: http://dx.doi.org/10.61426/sjbcm.v2i2.201

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.