PROJECT MANAGEMENT PRACTICES AND PERFORMANCE OF GOVERNMENT FUNDED ELECTRIFICATION PROJECTS IN KENYA

NANCY EMMA WAMBUI, DR. PATRICK KARANJA NGUGI (Ph.D)

Abstract


Project management practices are those fundamental issues inherent in the project, which must be maintained in order for team working to take place in an efficient and effective manner. They require day to day attention and operate through the life of the project. The current state of project management practices in developing African countries remain actual serious to the development of innovation, the growing difficulty of program and the shortage of human wealth. The main purpose of this study was to determine the relationship between project management practices and performance of Government funded electrification projects in Kenya. The specific objectives of the study were to determine the effect of stakeholder involvement, resource allocation, risk management and monitoring & evaluation on performance of Government funded electrification projects in Kenya. This study adopted descriptive survey research design for the qualitative data. The target population involved Kenya Power Lighting Company, Kengen and Rural Electrification and Renewable Energy Corporation ((REREC). The research adopted primary data which was done by use self-administered questionnaires. Descriptive statistics was used to present data whereby frequencies, means and standard deviations was used. The study findings showed that the four variables had a significant influence on performance of the government funded electrification projects. The study recommended that a similar research should be conducted with an aim at investigating determinates of project management practices on the performance of government funded electrification projects with other variables or of other firms in other sectors, including other ministries in the Kenya. The findings showed that 69.4 % of the performance is explained by the four variables while 30.6 can be accounted by other factors captured by the standard error. 

Key Words; Stakeholder Involvement, Resource Allocation, Risk Management,Monitoring and Evaluation, Performance

CITATION: Wambui, N. E., & Ngugi, P. K. (2020). Project management practices and performance of government funded electrification projects in Kenya. The Strategic Journal of Business & Change Management, 7(3), 339 – 353.


Full Text:

PDF

References


Abdullah S. & Markandya A. (2017) Electrification projects in Rural Kenya, evaluation study, U. K.: Department of Economics, University of Bath.

Amos, J. and Dents, P. (2017). Risk analysis and management for major construction projects. Proceedings: RICS COBRA 1997 Conference. Portsmouth, September, 1–35.

Baker, Murphy & Fisher (1983). Project Management Handbook: Factors affecting project success New York: Van Nostrand Reinhold.

Barriere (2015) Effect of project management on Performance of Constituency Development Fund Projects in Kenya.

Baloi, P. & Price, A. (2013). Modeling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4), 262-269.

Crawford L., Morris P., Thomas J. and Winter M. (2013). Practitioner Development: From Trained Technicians to Reflective Practitioners. International Journal of Project Management 24:722-733.

Cooper, D. et al. (2015). Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements. West Sussex: John Wiley & Sons Ltd., pp. 1-41.

Elkington, P and Smallman, C (2012). Managing project risks: a case study from the utilities sector. International Journal of Project Management, 20(1), 49-57.

Kimweli, J. M. (2013). The Role of Monitoring and Evaluation Practices to the Success of Donor Funded Food Security Intervention Projects A Case Study of Kibwezi District. International Journal of Academic Research in Business and Social Sciences, 3(6), 9.

Kothari & Gaurav Garg (2014), Research Methodology, Third Edition, New Age International Publishers, New Delhi.

Sebastiano, L., & Ragnhild, K. (2014). Constraint-Shattering Practices and creative Action in Organizations. Organization Studies, 35(4), 587-611.

Stem, C., Margoluis, R.,Salafsky, N. & Brown, M. (2014). Monitoring and evaluation in Conservation: A review of trends and approaches. Conservation Biology, 19, 295 -309.

Tinnirello, P C (ed.) (2010) Best Practices Series- Project Management. USA: Auerbach.

Tversky, Amos and Daniel Kahneman. (2012). Loss Aversion in Riskless Choice: A Reference Dependent Model, Quarterly Journal of Economics 107(4), 1039-1061.

Wanyona, G. (2015). Risk Management in the cost planning and control of building

World Bank (2012). Addressing Electricity Access Gap. World Bank.

World Bank, (2015). The Welfare Impact of Rural Electrification: A reassessment of the Costs and Benefits –An IEG Impact Evaluation. World Bank, Washington DC




DOI: http://dx.doi.org/10.61426/sjbcm.v7i3.1675

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.