INFLUENCE OF RESOURCE MANAGEMENT PRACTICES ON TIMELY COMPLETION OF ROAD PROJECTS IMPLEMENTED BY THE COUNTY GOVERNMENT OF KAKAMEGA COUNTY, KENYA

WILLIS MUDENI KOYI, DR. JULIUS MIROGA (PhD), DR. HESBON OTINGA (PhD)

Abstract


The aim of this study was the assessment of how practices of managing resources are affecting timely completion of road projects implemented by the County Government of Kakamega County, Kenya. This study determined how planning and scheduling factors affect timely completion road projects in Kakamega County. The study was guided by the theory of planning and resource based view theory. A descriptive survey design was adopted in this research. Selection of the sample was done using stratified random sampling. Structured questionnaires were utilized in gathering of primary data. Analysis of quantitative data was done using descriptive and inferential statistics with use of Statistical Package for Social Sciences. A multiple linear regression model aided in indicating links between practices of managing resources and performance of road projects within the county of Kakamega. Both resource planning and resource scheduling were found to have a positive and significant influence on timely completion of road projects implemented by County Government of Kakamega. This implied project resources management practices are significant predicator of timely completion of road projects. The study concluded that a key benefit to resource planning is that it helps organisations to fulfill task specifications efficiently. Successful resource scheduling allows in different ways to solve problems related to resource availability and job efficiency. The study recommended that project managers should use backward scheduling techniques when the date of delivery is set and the work has to be planned or scheduled to meet the deadline. The study suggested that further studies should be carried out on how project resource management practices affect the performance of road projects in other Counties in Kenya.

Key Words: Resource Planning, Resource Scheduling, Implementation of Government Projects

CITATION: Koyi W. M., Miroga, J., & Otinga, H. (2021). Influence of resource management practices on timely completion of road projects implemented by the County Government of Kakamega County, Kenya. The Strategic Journal of Business & Change Management, 8 (2), 244 – 260.


Full Text:

PDF

References


Abu El-alkass, M. M. (2012). A construction resources management system for Gaza strip building contractors. Retrieved from: https://iugspace.iugaza.edu.ps/bitstream/handle/20.500.12358/19053/ file_1.pdf?sequence=1&isAllowed=y

Akali, T. (2018). Influence of contractors’ capacity on performance of road construction projects in Kakamega County, Kenya. Unpublished MA Project, University of Nairobi.

Anunda, S. (2016). Factors influencing the performance of projects implemented by NGOs in the health sector: A case of HIV/AIDS projects in Nairobi County, Kenya. Unpublished Master of Arts in Project Planning and Management Thesis: University of Nairobi.

Blichfeldt, B. S., & Eskerod, P. (2008). Project portfolio management–There’s more to it than what management enacts. International Journal of Project Management, 26(4), 357- 365.

Bulle, H.,& Makori, M. (2015).Influence of strategic planning on performance of urban road projects in Kenya; A case of Kenya Urban Roads Authority. The Strategic Journal of Business and Change Management, 2(91), 1285 – 1313.

Burns, N., & Grove, S. (2003). Understanding nursing research (ed.). St Louis: W.B Saunders Company.

Calderon, C., Cantu, C., & Chuhan-Pole, P. (2018). Infrastructure development in Sub- Saharan Africa: a scorecard. The World Bank.

Chan, W. T., Chua, D. K., & Kannan, G. (2018). Construction resource scheduling with genetic algorithms. Journal of construction engineering and management, 122(2), 125-132.

Cohen, P., West, S. G., & Aiken, L. S. (2014). Applied multiple regression/correlation analysis for the behavioral sciences. Psychology Press.

Dong, F., Li, M., Zhao, Y., Li, J., & Yang, Y. (2008, May). Software multi-project resource scheduling: A comparative analysis. In International Conference on Software Process (pp. 63-75). Springer, Berlin, Heidelberg

Elonen, S., & Artto, K. A. (2018). Problems in managing internal development projects in multi-project environments. International journal of project management, 21(6), 395- 402.

Engwall, M., & Jerbrant, A. (2013). The resource allocation syndrome: The prime challenge of multi-project management? International Journal of Project Management, 21(6), 403-409.

Frame, J. D. (2003). Managing projects in organizations: How to make the best use of time, techniques, and people. John Wiley & Sons.

Gashuga, D., Kule, J. W., &Ndabaga, E. (2016). Effect of funds management on project performance in Rwanda; Case study of Dairy Community Processing Center ProjectBurera District.International Journal of Scientific and Research Publications, 6(10), 628-649.

Gordon, J., & Tulip, A. (2017). Resource scheduling. International Journal of Project Management, 15(6), 359-370.

Guest, G. (2013). Describing mixed methods research: An alternative to typologies. Journal of Mixed Methods Research, 7(2), 141-151.

Joshi, R., &Patil, V. Z. (2013). Resource scheduling of construction project: Case study. International Journal of Science and Research, 4(5), 563-568.

Kamwana, W. C. & Muturi, W. (2014). Effects of financial management on performance of World Bank funded projects in Kenya: A case of KPLC Projects. European Journal of Business Management, 2(1), 370-384.

Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.

Kohli, U. (2006). Project management Handbook. Tata McGraw-Hill Education.

Kothari, C. R. (2004). Research methodology: Methods and techniques. New Age International.

Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and psychological measurement, 30(3), 607-610.

Kumari, K. S., & Vikranth, J. (2012). A study on resource planning in highway construction projects. International Journal of Engineering Research and Applications, 2(4), 1960- 1967.

Kwatsima, S. A. (2017). An investigation into the causes of delay in large construction projects in Kenya (Doctoral dissertation, COETEC, JKUAT).

Lyons, J. E., Runge, M. C., Laskowski, H. P., & Kendall, W. L. (2019). Monitoring in the context of structured decision‐making and adaptive management. The Journal of Wildlife Management, 72(8), 1683-1692.

Maserang, S. (2012). Project management: Tools & techniques. Retrieved from: http://www.umsl.edu/~sauterv/analysis/488_f02_papers/ProjMgmt.html

Mbaabu, P. P. (2012). Factors influencing implementation of road construction projects in Kenya: a case of Isiolo County, Kenya (Doctoral dissertation, University of Nairobi, Kenya).

Mburu, S. N. (2017). Influence of project planning on sustainability of road construction projects in Nairobi City County, Kenya: A case of China Wuyi Company Limited (Doctoral dissertation, MUA).

Memon, A. H., & Zin, R. M. (2011). Resource-driven scheduling implementation in Malaysian construction industry. International Journal of Sustainable Construction Engineering and Technology, 1(2), 77-90.

Mogaka, C. K. (2017). Funds disbursement procedures and implementation of donor funded health projects in Nairobi City County, Kenya (Doctoral dissertation, Kenyatta University).

Monk, E., & Wagner, B. (2012). Concepts in enterprise resource planning. Cengage Learning.

Mugenda, A., & Mugenda, O. (2013). Research methods: Quantitative and qualitative approaches. Nairobi: ACTS Press.

Mugenda, O. M., & Mugenda, A. G. (2003). Qualitative and quantitative approaches. Research Methods Africa Center for Technology Studies (Acts) Press. Nairobi Kenya.

Murithi, S. H., Makokha, E. N., & Otieno, C. (2017). Factors affecting timely completion of public construction projects in Trans-Nzoia County. International Journal of Scientific and Research Publications,7(4), 404-434.

Murugu, P. M. (2014). The Challenges and Opportunities of Decentralized Political Systems. Unpublished Master’s Thesis, University of Nairobi, Institute of Development Studies.

Musyoki, A. N. (2018). Institutional factors influencingimplementation of infrastructure projects by countygovernments in Kenya; A case of Embu County, Kenya. (Doctoral dissertation, University of Nairobi).

Ngetich, E. K. (2017). Influence of implementation of devolution on performance of road construction projects in Kericho County, Kenya.Unpublished MA Project, University of Nairobi.

Njiru, S. G. (2018). Project management practices and implementation of projects in manufacturing companies in Nairobi City County, Kenya.Unpublished MBA Project, Kenyatta University.

Ochieng, E. A. (2014). Influence of resource management on implementation ofprojects in global system of mobile communicationscompanies in Kenya. Unpublished MA Project, University of Nairobi.

Ogutu, B. O., &Muturi, W. (2017). Factors influencing successful completion of road construction projects in Kenya: The case of Kisumu County. International Journal of Economics, Commerce and Management, 5(6), 728-771.

Omoregie, A., & Radford, D. (2016, April). Infrastructure delays and cost escalation: Causes and effects in Nigeria. In Proceedings of the 6th International Postgraduate Research Conference in the Built and Human Environment. International Council for Research and Innovation in Building and Construction.

Onyango, L. B., Bwisa, H.,& Orwa, G.(2017). Critical factors influencing the implementation of public infrastructure projects in Kenya: A case of Thika Sub-County, Kiambu County Kenya. International Journal of Scientific and Research Publications, 7(5), 200-211.

Petrovic, M., & Van Bruwaene, S. (2004). U.S. Patent No. 6,678,671. Washington, DC: U.S. Patent and Trademark Office.

Pfeffer, J., & Salancik, G., R. (1978). The External Control of Organizations: A Resource Dependence Perspective, Harper & Row, New York

Pinha, D. C., & Ahluwalia, R. S. (2019). Flexible resource management and its effect on project cost and duration. Journal of Industrial Engineering International, 15(1), 119- 133.

Pojani, D., & Stead, D. (2015). Sustainable urban transport in the developing world: beyond megacities. Sustainability, 7(6), 7784-7805.

Schwindt, C. (2016). Resource allocation in project management. Springer Science & Business Media.

Sekaran, U. (2009). Bougie. M,” Research methods for business: A skill building approach”. UK: John Wiley & Sons.

Sekaran, U., & Bougie, R. (2016). Research methods for business: A skill building approach. John Wiley & Sons.

Shadrack, M. S. (2018). Factors influencing the practice of resource planning and leveling in the Kenyan construction industry: A survey of contractors in Nairobi County (Doctoral dissertation, JKUAT-SABS).

Sushma, H., Bhavya, S., Rajeeva, S. J.,& Narayan, G. (2017). Planning, scheduling and resource optimization for road construction using primavera. International Journal of Innovative Research in Technology, 4(3), 73-84.

Umble, E. J., Haft, R. R., & Umble, M. M. (2015). Enterprise resource planning: Implementation procedures and critical success factors. European journal of operational research, 146(2), 241-257.

Umulisa, A., Mbabazize, M., & Shukla, J. (2015). Effects of project resource planning practices on project performance of Agaseke Project in Kigali, Rwanda. International Journal of Business and Management Review, 3(5), 29-51.

Vishnuraj, R. G., & Vishak, M. S. (2017). Optimization of resources in highway construction. International Journal of Engineering and Management Research (IJEMR), 7(2), 106- 110.

Wafula, E. F. (2017). Factors influencing road projects performance in Kenya: A case of road contractors in Machakos County. University of Nairobi.

Wairimu, M. V. (2016). Factors influencing completion of road construction projects in Embakasi, Nairobi County Kenya.Unpublished MA Project, University of Nairobi.

Watt, A. (2007). Resource planning in project management. Retrieved from: https://opentextbc.ca/projectmanagement/chapter/chapter-11-resource-planning- project-management/

Westland, J. (2007). The Project Management Life Cycle: A Complete Step-by-step Methodology for Initiating Planning Executing and Closing the Project. Kogan Page Publishers.

World Bank (2010). Infrastructure at crossroads:Lessons from 20 years of World Bank experience. The World Bank, Washington,D.C.

World Bank (2016). North Eastern Transport Improvement Project (P161305): Project Information Document/Integrated Safeguards Data Sheet (PID/ISDS).

World Bank Group (2016). Transformation through infrastructure. Retrieved from: http://siteresources.worldbank.org/INTINFRA/Resources/Transformationthroughinfra structure.pdf

Yeri, T. M. (2018). Determinants of successful implementation of infrastructure projects in devolved units in Kenya: A case of Kilifi County, Kenya.Unpublished MA Project, University of Nairobi.

Yeri, T. M. (2018). Determinants of successful implementation of infrastructure projects in devolved units in Kenya: A case of Kilifi County, Kenya.Unpublished MA Project, University of Nairobi.




DOI: http://dx.doi.org/10.61426/sjbcm.v8i2.1992

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.