EFFECT OF MONITORING AND EVALUATION PLANNING ON SUCCESS OF RURAL WATER CHLORINATION PROJECTS, A CASE OF CHLORINE DISPENSERS PROJECT IN WESTERN; KENYA
Abstract
Project management is a practice that has been there for a long time. It can be traced to the ancient use in constructing of Egyptian pyramids that stand to date. However, it is only from 1950s that project management as a field started being professionalized with massive use by the United States Navy for war operations. Project Management has been found to be important in ensuring projects are completed within the right time, budget, scope and have impact to stakeholders. Rural water chlorination projects provide access to safe water to the most vulnerable in society. Monitoring and Evaluation is an important component in managing projects. This study established the effect of Monitoring and Evaluation Planning on success of Rural Water Chlorination Projects in Western Kenya. The study adopted descriptive research survey design. The target population was water project managers in Western Kenya. Stratified sampling was as a sampling Technique for determination of the study sample. The Questionnaire was used as an instrument for primary data collection. Pilot study was done on the on managers who were not part of the major study from western; Kenya, hence this enabled for testing of the reliability and validity of the research instrument. The study descriptive and inferential statistics was analyzed by use of SPSS software version 24, further; a regression equation model was developed to test the relationships between the variables. The results of the findings indicated Monitoring and Evaluation Planning influenced Success of the Rural Water Chlorination projects in Western Kenya. The study recommended for County Governments to embrace the use of Monitoring and Evaluation Planning practices, since it improves the Success of Rural Water Chlorination. The study recommended for further studies on the same considering same variables but different methodologies.
Key words: Monitoring and Evaluation Planning, Monitoring and Evaluation Practices, Success of the project
CITATION: Wakoli, A. S., Kadima, M. J., & Miroga, J. (2022). Effect of monitoring and evaluation planning on success of rural water chlorination projects, a case of chlorine dispensers project in western; Kenya. The Strategic Journal of Business & Change Management, 9 (2), 424 – 443.
Full Text:
PDFReferences
Abbasi, Y. & Al-Mharmah. (2000). ‘Project management practice by the public sector In a developing country’. International Journal of Project Management, 18(3), pp105-109.
Adams, J. R., Barnt, S. E. & Barndt, S. E. (1983).Behavioral implications of the Project life cycle. Project Management Handbook, Van Nostrand Reinhold . New York.
Adewuyi, O. W. (2018). Mentoring Practices and Years of Work Experience as Predictors of Job Performance of Cataloguers in a Workplace: A Case Study of Nigerian Libraries. Library Philosophy and Practice.
Afande, O.F. (2013). Effects of strategic management practices on performance of financial institutions in Kenya: A case of Kenya Post Office Savings Bank.
Alabama State University; What is Theory?: Answers from the Social and Cultural Sciences. Stockholm, Corvellec, Hervé, ed.
Asher, Herbert, B.(2013).Theory-Building and Data Analysis in the Social Sciences. Knoxville, TN: University of Tennessee Press, Copenhagen Business School Press, 2013.
Abend,G.(2008)."The Meaning of Theory."Sociological Theory 26 (June 2008): 173–199.
Antariska, A.(2019). Understanding renumeration package: Benefit and reward.
Aranda, B.&Loukanova, S.(2013).Systematic review on what works, what does not work and why of implementation of mobile health (mHealth) projects in Africa, BMC Public Health. https://doi.org/10.1186/1471-2458-14-188
Arnaboldi, M., Azzone G., & Savoldelli A.(2004). Managing public sector project: the Case of the Italian Treasury Ministry. International Journal of Project management, 22(3), pp213-223.
Atkinson, R.(1999). Project management: cost, time and quality, two best guesses and a Phenomenon, its time to accept other success criteria. International Journal of Project Management. 17(6), 337 – 342.
Baccarini,D.(1999).The logical framework method for defining project success. Project Management Journal, 30(4), 25 –32.
Bakan, I.(2014).The importance of formal employee education in the world of great uncertainity. Imam University.
Bakouris,Y.Keresidis, V.(2000). Dissemination of innovation and management techniques.
Bartram, J.,Cairncross, S.(2010).Hygiene, Sanitation, and Water: Forgotten Foundations of Health. PLoS Med 7(11): e1000367. https://doi.org/10.1371/journal.pmed.1000367.
Belassi,W., &Tukel,O.I. (1996). A new framework for determining critical Success/failure factors in projects. International Journal of Project Management.14(3).
Bent,J.(2008). Project Management for Engineering and Construction. Prentice hall, p2.
Besner, C.(2006).The Perceived Value and Potential Contribution of Project Management Practices to Project Success. Project management journal.https://doi.org/10.1177/875697280603700305
Bin.J.,Heiser,D.R.(2004).The eye diagram: A new perspective on the project life Cycle. Journal of Education for Business. 80(1), 10 – 16.
Birongo, J.M., & Le, N.Q. (2005). An Analysis of Water Governance in Kibera, Kenya.
BMRA Researchers, Toolkit( 2003). Market research techniques – data collection methods designing and conducting surveys), http://www.bmra.org.uk/researchers- toolkit/index.asp
Bolarinwa,O.(2015).Principles and methods of validity and reliability testing of questionnaires used in social and health sciece researches. Niger Postgrad Med J [serial online] 2015 http://www.npmj.org/text.asp? 2015/22/4/195/173959.
Bonnet,D., Thomas,W.(2014).Cronbachs alpha reliability: Interval estimation, hypothesis, testind sample size planning.Journal of organizational behaviour.htps://doi.org/10.1002/job.1960.
Booz, A.& Hamilton.(2011).Earned Value Management Tutorial Module 2: Work Breakdown Structure Office of Science, Tools & Resources for Project Management. science.energy.gov.
Brest,P.(2010)."The Power of Theories of Change". Stanford Social Innovation Review.
Botev, Z.,Ridder, A.(2017). "Variance Reduction". Wiley StatsRef: Statistics Reference Online: 1--6. doi:10.1002/9781118445112.stat07975.
Bwisa,H.(2018).The basics of writing a statement of the problem for your research proposal . Editage Insights, https://doi.org/10.34193/EI-A-5275
Chan,W.K.,&Suhaiza,Z.(2007). Factors influencing the success of project Management amongst manufacturing companies in Malaysia: a conceptual framework. 7th Global Conference on Business & Economic. ISBN: 978-0-9742114-9-7.
Clarke, A.(1999). A practical use of key success factors to improve the effectiveness of Project management. International Journal of Project Management. 17(3), 139 – 145.
Collins Dictionary.(2019). www.collinsdictionary.com.
Cooke-Davies,T.(2002).The “real” success factors in projects. International Journal of Project Management. 6(3), 164 – 170.
Crawford, L., Pollack, J., England, D.(2006). Uncovering the trends in project Management: Journal emphases over the last 10 years. International Journal of Management. pg175.
Clark. H.&D.Taplin (2012).Theory of Change Basics: A Primer on Theory of Change.New York:
Cinque.M, D.Cotroneo, R. D. Corte &A. Pecchia,(2014)."Assessing Direct Monitoring Techniques to Analyze Failures of Critical Industrial Systems,".2014 IEEE 25th International Symposium on Software Reliability Engineering, Naples, 2014, pp.212-222. doi: 10.1109/ISSRE.2014.30
Chad, H. Iddekinge et al.(2019).A meta‐analysis of the criterion‐related validity of prehire work Experience. Personnel Psychology. doi: 10.1111/peps.12335
Clark H.(2004). Deciding the Scope of a Theory of Change. New York: ActKnowledge.
Clarke, R.(2009). Water. London: Routledge. https://doi.org/10.4324/9781315070261
Collony, B.(2012). Wrongful remuneration: Short term reward for long term failure. 2 King's Inns Student L. Rev. 115.
Creswell.,John,W.(2014). Research design : qualitative, quantitative, and mixed methods approaches (4th ed.). Thousand Oaks: SAGE Publications. ISBN 978-1-4522-2609-5.
Cruickshank,V.(2017) . Renumeration key to keeping quality staff.The Examiner, Fairfax Regional Media, Launceston, Tasmania. Retrieved 20 September 2017 .
D’Costa, A.&Sneed, J.,Vivian, V.,(1987). Work Experience as a Predictor of Performance: A Validation Study. Evaluation & the Health Professions, 10(1), 42–57. https://doi.org/10.1177/016327878701000104
David, H.(2003).Using a Risk Breakdown Structure in Project Management. Journal of Facilities Management 2, no. 1.pg 85–97.
Dannish Demming Group.(2012).Impact Monitoring: An Introduction.
Dennis, L.(2007). Project Management (9th ed.) Gower Publishing, Ltd.
Devare,S.(2015).Important of SPSS for Social Sciences Research SSRN: https://ssrn.com/abstract=2663283 or http://dx.doi.org/10.2139/ssrn.2663283
Devaux,A.(1999). Total Project Control: A Manager's Guide to Integrated Project Planning, Measuring, and Tracking (pp. xxiv–xxvi).New York, NY: Wiley.ISBN 0-471-32859-6.
Dikko, M.(2016). Establishing Construct Validity and Reliability: Pilot Testing of a Qualitative
Interview for Research in Takaful (Islamic Insurance). The Qualitative Report, 21(3), 521- 528. Retrieved from https://nsuworks.nova.edu/tqr/vol21/iss3/6.
Dudovosky,J(2015). The ultimate guide to writing a dissertation.https://research-methodology.net/sampling-in-primary -data-collection/stratified- sampling/Evidence Action (2019). www.evidenceaction.org
Fotopoulos, C., Evangelos, L.(2010).The structural relationships between TQM factors and organizational performance. The TQM Journal, Vol. 22. Issue: 5, pp.539 – 552, https://doi.org/ 10.1108/17542731011072874
Gooding, K., Makwinja, R., Nyirenda, D., Vincent, R., & Sambakunsi, R. (2018). Using theories of change to design monitoring and evaluation of community engagement in research: experiences from a research institute in Malawi. Wellcome open research, 3, 8. doi:10.12688/wellcomeopenres.13790.1
Gong, P., Xia, B. S.(2015). Review of business intelligence through data analysis. Benchmarking, 21(2), 300-311. doi:10.1108/BIJ-08-2012-0050.
Grant, C. & Osanloo, A.(2014). Understanding, Selecting, and Integrating a Theoretical Framework in Dissertation Research: Creating the Blue print f or ‘House’. Administrative Issues Journal: Connecting Education, Practice and Research, Pp. 12-22 DOI: 10.5929/2014.4.2.9
Gwaya,A,Wanyona, G.(2014). Need for change in the practice of Project Management in Kenya, International Journal of Soft computing and Engineering, Vol. 3.
Habeeb,S(2008). Impact of 'fund of funds' and other initiatives in building entrepreneurial economy of emerging India: a comparison with China. International Journal on Financial Innovation in Banking, Vol. 2, No.2
Hall-Jones,P(2006).The rise and rise of NGOs. Global Policy forum. https://www.globalpolicy.org/ component/content/article/176/31937.html
Haiying,L.(2014). An Empirical Review of Research Methodologies and Methods in Creativity Studies
Harison,C.(2017). Tip Sheet on question wording, Harvard University program survey research.
Haughey,D.(2014). A brief History of Project Management. www.projectsmart.co.uk/brief- history-of-project-management.php
Hayes,A.(2019). Stratified Random sampling. www.investopedia.com/terms/
Hazir,O.(2015).A review of analytical models, approaches and decision support tools in project
monitoring and control. International Journal of Project Management .Volume 33. Issue 4, May 2015, Pages 808-815.
Hendricks & V. Singhal(1996).Quality Awards and the Market Value of the Firm: An Empirical Investigation . Georgia Tech, Management Science,Vol. 42, No. 3., pp.415-436.
Holbrook, A., Johnson,T.(2013).The impact of question and impact characteristics on comprehension and mapping difficulties, Pubic opinion quarterly pg 565.
Hwang, B.&Lim, E. (2013). ”Critical Success Factors for Key Project Players and Objectives: Case Study.
Idoro,G. I & Patunola-Ajayi J. B. (2009).Evaluating the strategies for marketing project management system in the Nigerian construction industry. Nordic Journal of Surveying and Real Estate Research.6(2), pp.25-36.
Ignatious,O.(2018).Contractors in Bungoma on the run as banks demand money. The Standard.
https://www.standardmedia.co.ke/article/2001274870/contractors-in-bungoma-on-the-run-as-banks-demand-money.
Ika, L.A. (2012). Project management for development in Africa: why projects are failing and what can be done about it. Project Management Journal. 43(4), 27-41.
Ikal, L. A. (2009). Project success as a topic in project management journal, 40(4), 6- International Affairs (PASSIA).
International Labor Organization, (2011).http://www.ilo.org/wcmsp5/groups/public/---dgreports/ excel/documents/generic document/wcms _172679.pdf.
Jackson, E.(2013).Interrogating the theory of change: evaluating impact investing where it matters most.Journal of Sustainable Finance & Investment. 3:2: 95–110.
James, P. Lewis (2000). The project manager's desk reference: a comprehensive guide to project planning, scheduling, evaluation, and systems. p.18.
Jenny,R.(2014).Designing and using research questionnaires. Management Research Review, Vol. 37 Issue: 3, pp.308-330, https://doi.org/10.1108/MRR-02-2013-0027
Joshi,H,Kumar,A(2008).Role of NGOs in restoration and management of fresh water ecosystems. Proceedings of Taal 2007:The 12th world lake conference 1880-1884.
Joshi,V&Kumar,K.(2006). Extreme rainfall events and associated natural hazards in Alaknanda Valley, Indian Himalayan Region. J. Mt. Sci.. 3. 228-236. 10.1007/s11629-006-0228-0.
Jugdev, K., & Müller, R. (2005). A Retrospective look at our Evolving Understanding of Project Success. Project Management Journal. 36(4), 19–31. https://doi.org/10.1177/875697280503600403.
Kamau,G., Humam,B.(2015).Efficacy of Monitoring and Evaluation Function in Achieving Project Success in Kenya: A Conceptual Framework. Science Journal of Business and Management. Vol. 3, No. 3, 2015, pp. 82-94. doi: 10.11648/j.sjbm.20150303.14
Kamau, G.,Mohamed,H.(2015). Efficacy of Monitoring and Evaluation Function in Achieving Project Success in Kenya: A Conceptual Framework. Science Journal of Business and Management. Vol. 3, No. 3, pp. 82-94. doi: 10.11648/j.sjbm.20150303.14
Katwa, M.(2016). Remuneration package. Beyond the gross salary. www.brightermonday.co.ke/ blog/remuneration-package/
Keith, S.(2015). Dechlorination-The First Tank Guide-Preparing Your Tap Water for Aquarium Use. First Tank guide.
Kenya National Bureau of Statistics.(2009). Population Distribution by Sex, Number of Households, Area and Density by County and District.
Kerzner, H. R. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Kerzner, H.(1998).In Search of Excellence in Project Management. John Wiley and Sons, 1998.
Kerzner, H. (1987). In search of excellence in project management. Journal of Systems Management, 38(2), 30 – 40.
Kithinji,C, Senelwa,A(2018).Influence of monitoring and evaluation tools usage on agricultural project success in ngo`s in kenya: a case study of farm africa, kenya. International Journal of Social Science and Humanities Research ISSN 2348-3164 (online) Vol. 6, Issue 4, pp: (210-233).
Kithinji,C.,Gakuu,C.,Kidombo,C.(2017).Resource Allocation, Evaluation Capacity Building M&E Results Utilization Among Community Based Organizations in Meru County in Kenya. 79. European Scientific Journal June 2017 edition Vol.13, No.16 ISSN: 1857 – 7881. doi: 10.19044/esj.2017.v13n16p283.
Kiarie, C.(2015).The Effect of Select Value Practices as a Strategic Factor of Students Satisfaction in the Management of Higher Institutions of Learning: A Case of Jomo Kenyatta University of Agriculture and Technology (JKUAT). International Journal of Science and Research (IJSR) ISSN (Online): 2319-7064.
Kihuha,P.(2019). Monitoring and evaluation practices and performance of Global environment facility projects in Kenya, a case of united Nations environment programme. Kenyatta University Library.
Kirsten,M., Rosacker,R. (2010). Information technology project management within public sector organizations. Journal of Enterprise Information Management, Vol. 23 Issue: 5, pp.587-594, https://doi.org/10.1108/17410391011083047
Korb, K.(2012). Conducting Educational Research. Validity of Instruments. http://korbedpsych.com/ R09eValidity.html
Kostas, S.& Finn,W.(2015).Performance-based contracting: a literature review and future research directions. International Journal of Production Research, 53:12, 3505-3540, DOI: 10.1080/00207543.2014.978031.
Kubisch, A.(1997). Voices from the field: Learning from the early work of comprehensive community initiatives. Washington, DC: Aspen Institute.
Kumar,S.,Ahmad,S.(2009). Meanings, Aims and Processes of Education.
Kuzmić,Tomislav.(2018). www.eudict.com. Retrieved 2018-06-14.
Kwak, Y.(2003). Brief History of Project Management. Quorum Books.
Lauren, D.,John, M.(2014). A Meta-Analysis of Different Forms of Shared Leadership–Team Performance Relations. Journal of management Vol 42,issue 7. https://doi.org/10.1177/0149206314525205.
Lavagnon,I.& Jan,S.(2014).Why Do Projects Fail in Africa?. Journal of African Business, 15:3, 151-155, DOI: 10.1080/15228916.2014.956635.
Leitch,C.(2018). The 6 biggest benefits of work experience. https://www.careeraddict.com/benefits-work-experience.
Lewis, J. P.(2007).‘Fundamentals of Project Management, 3rd ed, New York: AMACOM.
Li, M., Tsai, J., Perng, C., & Gao, M. (2015). Project risk management based on WBS-RBS- OBS and ANP-With the aerospace industry as example. International Journal of Technology and Engineering Studies, 1(4), 136-142.
Lock, D. (2007).Project Management (9th ed.) Gower Publishing, Ltd., 2007. ISBN 0-566-08772-3.
Luse, A., Mennecke, B.,&Townsend, A.(2012). Selecting a Research Topic: A Framework for Doctoral Students. International Journal of Doctoral Studies, 7, 143-152.
Luthans, F., & Davis, T.R.V (1982). ‘An Idiographic Approach to Organizational Behavior research: The Use of Single Case Experimental Designs and Direct Measures’, Academy of Management Review, JSTOR.
Malcolm T., The Golden Age of Academe: Myth or Memory?. British Journal of Educational Studies. 10.1080/00071000903516502, 58, 1, (105-116), (2010).
Marilyn, K., Jim, G.(2013).Ex-Post Facto Research. Recipes for Success. Seattle, WA:Dissertation success LLC, www.dissertationrecipes.com.
Martinez, Carlos & Olander, Stefan. (2015). Stakeholder Participation for Sustainable Property Development. Procedia Economics and Finance. 21. 10.1016/S2212-5671(15)00150-1.
Mbega,W.(2015). Factors affecting the job perfomance of agricultural extension workers in Handeni District, Tanzania. Sokoine University Press.http://hdl.handle.net/123456789/948
McGaghie,W. C., Bordage, G.&Shea.(2001). Problem Statement, Conceptual Framework, and Research Question. Retrieved on January 5, 2015 from http://goo.gl/qLIUFg
Michael,S.(2010).“2010 PMO Global Study: How a Project Management Office Can Improve Organizational Effectiveness”.
Michael,W., Marina, N.(2004). The Project Management Question and Answer Book. p.8.
Mladen,R., Mariela ,S.(2017). Project Management Success Factors, Creative construction conference, Croatia.
Mok, K., Shen,P.(2015). Stakeholder management studies in mega construction projects: A review and future directions. International journal of project Management. https://doi.org/10.1016/ j.ijproman.2014.08.007.
Monette, Sullivan.(2005).Applied social research. A tool for the Human services, 6th Edition.
Muchelule, Y.& Amuhaya,I.,&Odhiambo, R.& Ismail,S.(2017). Effect of Monitoring Techniques on Project Performance of Kenyan State Corporations. European Scientific Journal. 13. 10.19044/esj.2017. v13n19p264.
Muller, R. & Turner, R. (2007). Matching the project manager’s leadership style to project type. International Journal of Project Management, 25(4), pp. 21-32, DOI:10.1016/j.ijproman .2006.04.003, Science Direct database.
Murei, L., Kidombo,H.(2017). Influence of monitoring and evaluation budget on performance of horticulture projects in nakuru county, kenya. International Journal of Economics, Commerce and Management. Vol. V, Issue 12, December 2017.
Mwere,D.(2018). Contractors stall Sh 9bn roads after payment ,https://www.businessdailyafrica.com /economy/ Contractors-stall-Sh9bn-roads-after- payment/3946234-4784874-biuhj7z/index.html.
Naidoo, I. A. (2011). The role of monitoring and evaluation in promoting good governance in South Africa: A case study of the Department of Social Development (Doctoral dissertation, University of Witwatersrand).
Nalianya, Micah & Wanyonyi, Stephen. (2017). Monitoring and Evaluation Systems and Performance of Non-Governmental Based Maternal Health Projects in Bungoma South Sub-County, Kenya. European Scientific Journal. 13. 10.19044/esj.2017.v13n23p11.
National Security Agency.(2005), “Elapsed Time management”, https://www.nsa.gov/ academia/_files/collected_learning/elementary/geometry/elapsed time2.pdf.
Ndungu,R(2014).Factors influencing the completion time of water projects in water service boards in kenya: a case of athi water services board, kiambu county. Nairobi University Library. NGO Coordination Board(2018). Report of the Auditor General on Financial Statements of NGOs Coordination Board.
Njogu,I.(2017). Effect of employees’ work experience on performance within hotel industry: a case of amber hotel, Kenya.USIU Library.
Nyandika, O. F & Ngugi, K . (2014). Influence of Stakeholders' Participation on Performance of Road Projects At Kenya National Highways Authority. European Journal of Business Management, 1 (11), 384-404.
Nuwagaba,F.(2015). Factors affecting the implementationof the performance appraisal system in Rwanda: a case of nyamasheke district local government. JKUAT Library.
Ochami,M.(2016). The effect of female employee empowerment on organizational reputation in environment oriented parastals in the public sector in kenya. www.academia.edu/31559246.
O’Donnell, T.K. & Galat.(2008), Environmental Management 41: 90. https://doi.org/10.1007/s00267-007-9010-5.
Ofer,Z, Mark,A.(2010).The Effectiveness of Risk Management: An Analysis of Project Risk Planning Across Industries and Countries ,vol. 31.
Oloo, D. (2015). Modified variation order management model for civil engineering construction projects. Jomo Kenyatta University of Agriculture and Technology
Patanakul, P., Iewwongcharoen, B., & Milosevic, D. (2010). An Empirical Study on the use of Project Management Tools and Techniques across Project Life-Cycle and their Impact on Project Success.Journal of General Management, 35(3), 41–66. https://doi.org/10.1177/030630701003500304.
Patel, B. M. (2008).‘Project Management: Strategic financial planning, evaluation and control’; New Delhi, Vikas Publishing House PVT Ltd.
Parliament of Kenya(2019),Bills. www.parliament.go.ke
Partner, S.(2019).Did it Work? 5 Tools for Evaluating the Success of Your Project. https://www.sumac.com/did-it-work-5-tools-for-evaluating-the-success-of-your-project/
Petra,L(2009).Research into questionnaire design. International Journal of Market research Vol 52 issue 2.
Pitagorsky,G(2017).Measuring_In-Progress_Project_Performance https://www.projecttimes.com/ george-pitagorsky/measuring-in-progress-project- performance.html
Pinnington, A.&Edwards, T. (2000). “Introduction to Human Resource Management”, Oxford University Press, Oxford.
Pinto, J.K.(2007). Project Management: Achieving Competitive Advantage. Upper Saddle River, NJ: Pearson Education.
Pinto, J. K., Dennis, P. S. (1987). Balancing strategy and tactics in project implementation. ABI/INFORM, 33 – 40.
Pinto, J. K., Dennis, P. S. (1989). Critical success factors in R and D projects. Research
Pinto, J. K.(1986). Project Implementation: A determination of its critical success factors, moderators, and their relative importance across the project life cycle. Doctorate dissertation, University of Pittsburgh. Technology Management, 32(1), 31 – 36.
Pozin,I.(2018). 6 Ways to Measure the Success of Any Project.https://www.inc.com/ilya-pozin/6- ways-to-measure-the-success-of-any-project.html.
Project Management Institute, (2017). A Guide to the Project Management Body of Knowledge. copyright page, edition 6 .
Pretorius, S., Steyn, H., & Jordaan, J. C. (2012). Project management maturity and project management success in the engineering and construction industries in Southern Africa. South African Journal of Industrial Engineering, 23(3), 1-12.
Quinones, Miguel & Ford, J & Teachout, Mark. (2001). The Relationship Between Work Experience and Job Performance: A Conceptual and Meta-Analytic Review. 36.
Rolstadås, A., Tommelein, I., Morten Schiefloe, P., & Ballard, G. (2014). Understanding project success through analysis of project management approach. International journal of managing projects in business, 7(4), 638-660.
Salapatas, J.(2000). Best practices-the nine elements to success. Paper presented at Project Management Institute Annual seminars & symposium.
Samuel,L. "Critical Path Method (CPM)."University of South Carolina, Health Services Policy
and Management Courses.
Sarah,S.(2012). Questionnaire Layout. www.explorable.com/questionnaire-layout Saranshkataria. (2015)."Do not keep waiting for everything to be perfect". Wisdomgeek.
Särndal,C, Bengt,S, Jan,W.(2003). Model assisted survey sampling. Springer. pp. 9–12. ISBN 978-0-387-40620-6.
Sasaka,M(2016). The effect of female employee empowerment on organizational reputation in environment oriented parastals in the public sector in Kenya. JKUAT Library.
Serrador, P., & Pinto, J. K. (2015). Does Agile work?—A quantitative analysis of agile project success. International Journal of Project Management, 33(5), 1040-1051.
Shahrokh,E., Mohammad , M., Edward R. (2014). "Effect of separate sampling on classification accuracy". Bioinformatics. doi:10.1093/bioinformatics/btt662. PMID 24257187.
Shuttleworth, M.(2015). Internal Consistency Reliability. www://explorable.com/internal-consistency-reliability.
Schumacher,S.,Macmillan, J.(2010).Research in Education: Evidence Based Inquiry (7th Edition)London. Pearson.
Slaymaker,T&Adank, M& Boelee, E& Hagos,F&Nicol, A& Tafesse,T&Degaga,D&Tucker, J. (2007). Water, Livelihoods and Growth.Concept paper.
Stojcetovic, Bojan. (2013). Project management: cost, time and quality.
Stukenbruck, L. C.& Zomorrodian, A. (1987). ‘Project Management: the promise for developing countries’. Project Management, 5(3), pp.167-175.
Spacey, J.(2018). https://simplicable.com/new/job-levels
Surbhi,S.(2017).Difference Between Monitoring and Evaluation. https://keydifferences.com/ difference- between-monitoring-and-evaluation.html.
Surendran, A.(2019). Quantitative research. Defination, types, examples www.questionpro.com/blog/ quantitative-research/
Swanson, Richard, A.(2013).Theory Building in Applied Disciplines. San Francisco, CA: Berrett-Koehler Publishers 2013.
Szalajko, G., Klein, G., Raue, S.(2014) Project Management excellence-Enabling quality in project execution. Berlin. Systemic Excellence group.
Talen, E. (1996). Do Plans Get Implemented? A Review of Evaluation in Planning. Journal of Planning Literature, 10(3), 248–259. https://doi.org/10.1177/088541229601000302
Tanda, Amarjit.(2014)."Statistical Data for Labour". www.labourbureau.nic.in.
Thairu,R(2014).An analysis of implementation of NGO projects in Nairobi county. Research paper. Kenyatta University.
Thomas, W., Allan, H.(2015). Strategic Management and Business policy globalization, innovation and sustainability. Pearson Education Inc.
Tom, S.(2014). History of Project Management, International Journal of management , V8.
Tukel, O. I., Rom, W. O. (2001). An empirical investigation of project evaluation criteria. International Journal of Operations and Production Management, 21(3), 400 – 409.
Turner,A.(2003).Designing of Household sample surveys ,United Nations Statistical Division.
Turner, J. R. (2004). Five necessary conditions for project success. International Journal of Project Management, 22(2004), 349 – 350.
United Nations development programme evaluation office - Handbook on Monitoring and
Evaluating for Results. http://web.undp.org/evaluation/documents/handbook/me- handbook.pdf
Valters, C., Steine, D.(2012).Understanding the Theory of Change in International Development.
Viedor, P(2017).How Important Is Project Monitoring And How Do We Implement It Through AI? https://project-management.com/how-important-is-project-monitoring-and-how-do-we- implement-it-through-ai/
Wachaiya, V.(2016) Monitoring and evaluation factors influencing success of development projects: a case of starehe sub-county, kenya. UON, Library.
Wagner,R.(2017). It´s all about the impact of a project, not the deliverables. Blog. www.ipma.world/impact-project-not-deliverables/
Walton, R. E., Cutcher-Gershenfeld, J., & McKersie, R. B. (2000). Strategic negotiations: A theory of change in labor-management relations. Cornell University Press.
Wateridge,J. (1998). How can IS/IT projects be measured for success? International Journal of Project Management, 16(1), 59 – 63.
Wauter, B.(2007). ‘Project Management Handbook’,DANS.
Weiss C. (1998).Have We Learned Anything New About the Use of Evaluation? American Journal of Evaluation. 19: 21–33. doi:10.1177/109821409801900103
Westall, F.& Brack, A.(2018).Space Sci Rev (2018) 214: 50. https://doi.org/10.1007/s11214-018-0476-7
Westland, J(2018). The Triple Constraint in Project Management: Time, Scope & Cost.
https://www.projectmanager.com/blog/triple-constraint-project-management-time- scope-cost.
Westerved, E.(2003).The Project Excellence Model®: linking success criteria and critical success factors. International Journal of Project Management, Vol. 21, PAGE 411-418.
Westland A. (2003). ‘Project Management Lifecycle’, London, Kogan Rage Limited.
Westland,J.(2018). History of Project Management. www.projectmanager.com/blog/history- project-management.
White, D. & Fortune, J. (2002). ‘Current practice in project management – an empirical study’ International Journal of Project Management, 20(6), pp.1-11.
WHO.(2011). Guidelines for drinking water quality.WHO Library Cataloguing-in-Publication Data.
Willetts, J., & Crawford, P. (2007). The most significant lessons about the Most Significant Change technique. Development in Practice, 17(3), 367-379.
WWC-World Water Center(2008). https://www.worldwatercouncil.org/en/publications
Wysocki,R. K.(2009).‘Effective Project Management: traditional, agile, extreme’, 5th ed, Indianapolis, IN :Wiley Publishing.
WorldBank(2012).Critical success factors for World Bank projects: An empirical investigation. International Journal of Project ManagementVolume 30, Issue 1, Page105-116.
Worldbank.(2000). Evaluating the impact of development projects on poverty: A handbook for practitioners. ISBN: 978-0-8213-4697-6. https://doi.org/10.1596/0-8213-4697-0
Yang, H., Miao, D., Zhu, X.(2008). The Influence of a Pay Increase on Job Satisfaction: A Study with the Chinese Army. Social Behavior and Personality: An International Journal, 36(10),pp. 1333-1339 (7).
Yang, J.(2015). Construction performance monitoring via still images, time-lapse photos, and video streams: Now, tomorrow, and the future.Advanced Engineering InformaticsVolume 29, Issue 2, April 2015, Pages 211-224.
Yang, R., Shen, G., Framework for Stakeholder Management in Construction Projects. Journal of Management in Engineering . Vol 31-Issue 4.
Yogesh,K.(2006). Fundamentals of Research Methodology and Scientists. New Age International(P) Limited, New Delhi, pp 77-95.
Young-Hoon,K.(2005). "A brief History of Project Management". In: The story of managing projects. Greenwood Publishing Group, 2005. ISBN 1-56720-506-2.
Young, T. (2007). The Handbook of Project Management: A Practical Guide to Effective Policies and Proced. Kogan Page Publishers.
Yousaf, M.(2018). Research Design-Types of Research. https://scholarshipfellow.com/research- design-types-research-design/
Zwick, T. (2012). Consequences of Seniority Wages on the Employment Structure. ILR Review, 65(1), 108–125. https://doi.org/10.1177/001979391206500106.
DOI: http://dx.doi.org/10.61426/sjbcm.v9i2.2273
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution 3.0 License.
PAST ISSUES:
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.