Abstract


Water projects all over the world have been started so as to solve challenges facing water availability. Various agencies like Government, Non-Governmental Organisations (NGOs) and donors have for a long time been committed to building water projects like building dams, boreholes, and wells. However, fewer projects experience successful completion and more so within the budget owing to the fact that water project stalled and collapsed. This therefore, led to continuous shortage water, particularly in the rural and slum areas of Kenya. Budget planning is necessary for project success. Many studies have been carried out on the influence of budget planning on projects implementation, but the main focus has been on project management practices and project performance. This study sought to fill this knowledge gap. The main objective of this study was to analyze the influence of budget planning on implementation of water projects. Cash management theory guided this study. The study used descriptive survey design. Data was collected by use of self-administered Questionnaires. The study targeted 440 respondents and the sample size were 131. Pre-test study was administered to 18 respondents of Kajiado County to test the reliability and viability of the instruments. Data was collected through administration of a questionnaire. Regression results showed that budget planning was significant on implementation of water project with the F statistics value of 49.64, and P-value of 0.000. Technology integration (moderating variable) was found to have an influence on the relationship between budget planning and implementation of water projects. In conclusion, therefore budget planning influenced implementation of water projects. The study recommended that water trust funds and other institutions funding water projects can replicate the findings of this study to improve on accessibility to safe and clean drinking water in other counties. 

Key words: Budget planning, Implementation, water projects

CITATION: Rotich, E. C., Mukulu, E., & Nyang’au, S. P. (2022). Influence of budget planning on implementation of water projects in Bomet County, Kenya. The Strategic Journal of Business & Change Management, 9 (3), 247-256.


Full Text:

PDF

References


Bolt, E., & Fonseca, C. (2001). Keep it working: a field manual to support community management of rural water supplies. Journal of Rural Studies 4(7):85-96.

Carter, N. (2007). The Politics of the Environment; Ideas, Activism, Policy, (2nd ed.). New York: Cambridge University Press.

Cheruiyot, K., J. (2016). Analysis of Household Water Demand, Distribution and Community Management Strategies in Nyongores Sub catchment, Bomet County, Kenya. Unpublished masters’ thesis, Kenyatta University, Kenya.

Dvapriya, K., & Ganesan S. (2012). Building Research and Information. New Age International Publishers, 12 (6), 5-13.

Fwamba, R. S. (2017). Influence of Financial Management Practice on Financial Performance of Sugar Manufacturing Companies in Kenya. Unpublished thesis, Jomo Kenyatta University of Agriculture and Technology, Kenya.

Fürst, J., Herrnegger, M., & Olang, L., O. (2014). MaMa-Hydro: Exploring Water Resources Planning and Management of Options in Nyangores. Headwater Catchment of the Vulnerable Maasai Mara River Basin in Kenya. mid-term project report kef project p196.

Ghadome, T. (2013). The decision to finance and its impact on the company's performance: An Empirical Study on a sample of companies listed on the Amman Stock Exchange Securities, Journal Jordanian Applied Sciences, 12(1): 1- 24.

Kothari, C., R. (2014). Research Methodology: Methods and Techniques, (2nd ed). New Delhi: New Age International.

Müller, R., & Turner, R. (2014). Project oriented leadership. London: Gower publishing limited.

Munene, Z., K. (2017. Factors influencing implementation of water projects under the devolved system of governance in Kenya: A case of Meru County government. Unpublished thesis, University of Nairobi, Kenya.

Mugenda, A., (2008). Social Science Research: Theory and Principles. Nairobi: Act Press.

Mugenda,O.,& Mugenda, A. (2003) Research Methods. Nairobi: Acts Press.

Mwendera, E., &Atyosi, Y., (2018). A Review of Water Storage for Socio-Economic Development in South Africa" Journal of Water Resource and Protection, 10(3), 266-286

Muaz, M., J. (2013). Practical Guidelines for Conducting Research - Summarising Good Research Practice in Line with the DCED Standard (February 2013). Retrieved on 25th June 2021. Available at SSRN: http://dx.doi.org/10.2139/ssrn.2591803.

Ndungu R., W. (2014). Factors Influencing the Completion Time Of Water Projects In Water Service Boards In Kenya: A Case Of Athi Water Services Board, Kiambu County. (Unpublished MBA Thesis), University of Nairobi, Kenya.

Okelo, J., Ogendi, G. M., & Ong'oa, I., M. (2013). Water Policy, Accessibility and Water Ethics in Kenya. Santa Clara Journal of International Law, 7(1), 177-196.

PWC. (2004). Boosting Business Performance through Programme and Project Management. Retrieved on April 5th 2021. From http://www.pwc.com/us/en/operations-management/assets/pwc-global-project-management-survey-first-survey-2004.pdf.

Rotich, E., C., Isaboke O., K. & Nassiuma, B. (2017). Determinants of Willingness to Pay for Improved Management Of Water Projects Among Households In Baringo County, Kenya. International Journal of Innovative Research & Development 7(1), 220-233.

Saris, W., E. (2007). Design, Evaluation and Analysis of Questionnaires for survey research. Hoboken, NJ: Wiley-Interscience.

Thomas S. N., Ekambaram P., & Mohan M., K. (2002), A dynamic e-Reporting system for Contractor’s performance appraisal. Advances in Engineering Software. 33(2), 339.349.

Thomas, M., Jacques, P. H., Adams, J. R. & Kihneman - Woote, J. (2012). Developing an effective Project, Planning and Team Building Combined. Project Management Journal, 39(4), 105-113.

Water Services Regulatory Board. (2016). Impact Issue No. 9, A Performance Review of Kenya’s Water Services Sector 2014-2015. Nairobi: Water Services Regulatory Board.

Water Services Regulatory Board. (2011). Financing Urban Water Services in Kenya. Nairobi: Government Printer.

Water Resources Management Authority. (2015). Strengthening Regulations for Sustainable Water Resources Management in Kenya. Nairobi: Water Resources Management Authority.




DOI: http://dx.doi.org/10.61426/sjbcm.v9i3.2364

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.