RISK MANAGEMENT DETERMINANTS AND PERFORMANCE OF RESIDENTIAL BUILDINGS CONSTRUCTION PROJECTS IN NAIROBI COUNTY, KENYA

NICKSON MBUI KAHANYA, ALFAYOS ONDARA, PhD

Abstract


Project performance is evaluated based on cost, time, and quality. Residential building construction projects encounter various risks that hamper those components of performance. Risk management enhances project performance and it is affected by various determinants. This study established the impact of risk management determinants on performance of residential buildings construction projects in Nairobi, Kenya. The identified determinants were risk mitigation strategy, risk management skills, project organization structure, and resource allocation. The study was anchored on decision theory, cost-benefit analysis model, and stakeholder theory. The target population was 1024 projects undertaken by contractors in the NCA 1, 2, 3 categories. The applied stratified random sampling method yielded 103 projects as the sample size (sampling factor being 0.1). Descriptive survey research design was used. The pilot study comprised sample of 5 projects. Data was collected using a questionnaire. The response rate from the targeted sample was 73.8% which was above the expected threshold. Data analysis was done on SPSS for both inferential and descriptive analysis. The respondents’ education level was noted to be 42.11%, 36.16%, and 19.74% for post-graduate, undergraduate, and diploma respectively. 50% of the respondents had worked between 5-10 years, 36.84% had worked over 10 years, while 13.16% had worked for less than 5 years. A reliability analysis was conducted using Cronbach’s Alpha test which yielded 0.762, an indication of higher level of internal consistency. The model summary indicated R to be 0.676 which showed high levels of correlation between project performance and the identified determinants. Regression analysis yielded coefficients that resulted in the equation, Y = 1.779 + 0.258X1 - 0.049X2 + 0.303X3 + 0.120X4. That illustrated that all determinants had positive correlation with project performance except project organization structure. The study concluded that risk management strategies and risk management skills had positive and significant impact on the project performance of residential buildings’ construction in Nairobi, Kenya. Project stakeholders were recommended to adopt these strategies without fail. The study recommended undertaking the study in other areas to ascertain a comparative analysis on the significant determinants.  

Key Words: Risk Mitigation Strategy, Risk Management, Project Organization Structure, Resource Allocation

CITATION: Kahanya, N. M., & Ondara, A. (2023). Risk management determinants and performance of residential buildings construction projects in Nairobi County, Kenya. The Strategic Journal of Business & Change Management, 10 (2), 1479 – 1495.


Full Text:

PDF

References


Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W. A., & Sorooshian, S. (2018). The influence of organizational external factors on construction risk management among Nigerian construction companies. Safety and health at work, 9(1), 115-124.

Bahamid, R. A., Doh, S. I., Al-Sharafi, M. A., & Rahimi, A. R. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In IOP Conference Series: Materials Science and Engineering, 712(1), p. 012007.

Banobi, E. T., & Jung, W. (2019). Causes and mitigation strategies of delay in power construction projects: Gaps between owners and contractors in successful and unsuccessful projects. Sustainability, 11(21), 5973.

Befrouei, M. A. R., & Taghipour, M. (2015). Identification and management of risks in construction projects. American Journal of Civil Engineering, 3(5), 170-177.

Belay, A. M., Torp, O., Thodesen, C., & Odeck, J. (2016). A framework for organizing a resilient cost-benefit analysis for construction projects. Procedia Engineering, 145, 1169-1176.

Boadu, E. F., Wang, C. C., & Sunindijo, R. Y. (2020). Characteristics of the construction industry in developing countries and its implications for health and safety: an exploratory study in Ghana. International journal of environmental research and public health, 17(11), 4110.

Brown, R. (2012). Decision Theory as an Aid to Private Choice: Limitations, Contributions, and Prospects. Judgment and Decision Making, 7(2), 207-223.

Fakunle, F. F., & Fashina, A. A. (2020). Major delays in construction projects: A global overview. PM World Journal, 9(5), 1-15.

Gurcanli, G. E., Bilir, S., & Sevim, M. (2015). Activity based risk assessment and safety cost estimation for residential building construction projects. Safety Science, 80, 1-12.

Hong, J., Shen, G. Q., Li, Z., Zhang, B., & Zhang, W. (2018). Barriers to promoting prefabricated construction in China: A cost–benefit analysis. Journal of cleaner production, 172, 649-660.

Ibadov, N. (2020). Ecology of building solutions in the engineering of construction projects. Arabian Journal of Geosciences, 13(13), 1-9.

Livermore, M. A. (2014). Cost-benefit analysis and agency independence. The University of Chicago Law Review, 609-688.

Mongina, C., & Moronge, M. (2021). Project management practices and performance of road

construction projects in Nairobi City County, Kenya. The Strategic Journal of Business & Change Management, 8(1), 545-562.

Mutunga, M., S., & Ondara, A. (2021). Risk Management

Practices and Project Performance at Kenya Airports Authority. Journal of

Entrepreneurship & Project management, 5(1), 45-63.

Ndungu, L. M. (2014). Factors influencing completion of projects in government tertiary institutions: A case of Nairobi County in Kenya (Doctoral dissertation, University of Nairobi).

Okweto, A. N. (2012). An assessment of the organisation structure and leadership effects on construction projects’ performance in Kenya: a case study of public building projects within the Nairobi region (Doctoral dissertation, University of Nairobi, Kenya).

Ondara, A. E. (2017). Risk Management Strategies and Performance of Construction firms in Selected Counties in Kenya. Unpublished PhD Thesis.

Osazuwaa, E. M., Ogbub, C. P., & Okec, A. E. (2019). Assessment of Risk Management Skills of Construction Professionals in Edo State, Nigeria. Journal of Science and Technology Research, 1(3), 75-83.

Radujković, M., & Sjekavica, M. (2017). Project management success factors. Procedia engineering, 196, 607-615.

Salleh, F., Palaniappan, S., Theng, I. L. P., Helmi, H. N. M., Hamid, A. A., & Kassim, N. M. (2020). A review on risk management implementation in the construction industry. Journal of Critical Reviews, 7(11), 562-567.

Serpella, A. F., Ferrada, X., Howard, R., & Rubio, L. (2014). Risk management in construction projects: a knowledge-based approach. Procedia-Social and Behavioral Sciences, 119, 653-662.

Shehu, G. A., & Wang, W. (2020). Risk Management Practices In Construction Industry In Nigeria. Vidyabharati International Interdisciplinary Research Journal, 11(2), 47-57.

Taber, K. S. (2018). The use of Cronbach’s alpha when developing and reporting research instruments in science education. Research in science education, 48(6), 1273-1296.

Taofeeq, D. M., Adeleke, A. Q., & Hassan, A. K. (2019). Factors Affecting Contractors risk attitude from Malaysia construction industry perspective. Social Science and Humanities Journal, 3(6), 1281-1298.

Transparency Market Research. (2020, February). Kenya Construction Market 2019-2027. https://www.thebig5constructkenya.com/wp-content/uploads/sites/2/2020/03/The-Big-5-Construct-Kenya-2020-Kenya-Construction-Market-Report.pdf

Valentinov, V., Roth, S., & Will, M. G. (2019). Stakeholder theory: A Luhmannian perspective. Administration & Society, 51(5), 826-849.




DOI: http://dx.doi.org/10.61426/sjbcm.v10i2.2680

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 2 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 1 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
  Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
  Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.