This study investigated on project cost control techniques on performance of water projects in Kericho County, Kenya. The study variables were grounded on the organizational control theory, the transaction cost theory and the theory of project management. The study applied descriptive research design and targeted 16 completed water projects as the unit of analysis. There was use of semi-structured questionnaires that was first pilot tested and found to be valid and reliable in collecting primary data. The findings showed that improvements in performance of the water projects was due to cost estimation using different models, price variations and forecast that helped in reducing cost overruns. Findings showed project budgeting significantly influenced performance of the water projects based on the budget guidelines, reducing risks, budgets informing project decisions and maximum utilization of resources. The monitoring and evaluation function helped improve performance by regular checks on progress of implementation of project plans, improving transparency, accountability and mechanisms. The results showed that project expenditure controls enhanced performance of the water projects setting limits, authorization process to access resources, monitoring costs and implementing cash flow management systems. The study concluded that project cost control techniques of cost estimation, budgeting, monitoring and evaluation and expenditure controls had positive and significant effects on performance of the water projects in Kericho County. The performance improved in terms of quality and sustainability of the project, keeping to the budget lines and completion on time. The study recommended project managers and team to implement cost control techniques for improvement in performance of projects. It also recommended that county governments to train contractors and project managers on budgeting, expenditure control, cost estimation and monitoring and evaluating project activities. It was recommended that the policy makers should formulate regulations and laws that support control of costs for delivery of quality projects. 

Key Words: Cost Estimation, Budgeting, Monitoring and Evaluation, Expenditure Control

CITATION: Bichang’a, L. C., & Kimutai, G. (2023). Project cost control techniques and performance of water projects in Kericho County, Kenya. The Strategic Journal of Business & Change Management, 10 (4), 569 – 592. http://dx.doi.org/10.61426/sjbcm.v10i4.2776.


Full Text:

PDF

References


Abdel-Hamid, M., & Abdelhaleem, H. M. (2021). Project cost control using five dimensions building information modeling. International Journal of Construction Management, 1-10.

Abobakr, A. (2018). Necessity of Cost Control Process (Pre & Post Contract Stage) in Construction Projects: Cost Control in Pre & Post Contract. (Dissertation for Masters’ Degree Helsinki Metropolia – University of Applied Sciences)

Adafin, J., Rotimi, J. O., & Wilkinson, S. (2020). Risk impact assessments in project budget development: quantity surveyors' perspectives. International Journal of Construction Management, 20(1), 13-28.

Adjei, K. O., Aigbavboa, C. O., & Thwala, W. D. (2018). The Challenges of Cost Control Practice in the Construction Industry: A Literature Review. In International Conference on Applied Science and Technology Conference Proceedings, 4 (1), 14-24)

Agarwal, R., Rainey, T. J., Steinberg, T., Rahman, S. A., Perrons, R. K., & Brown, R. J. (2020). LNG regasification–Effects of project stage decisions on capital expenditure and implications for gas pricing. Journal of Natural Gas Science and Engineering, 78, 103291

Ahn, J., Ji, S. H., Ahn, S. J., Park, M., Lee, H. S., Kwon, N., ... & Kim, Y. (2020). Performance evaluation of normalization-based CBR models for improving construction cost estimation. Automation in Construction, 119, 103329

Akeem, L. B. (2017). Effect of cost control and cost reduction techniques in organizational performance. International Business and Management, 14(3), 19-26.

Alaghehband, F. K., Rivard, S., Wu, S., & Goyette, S. (2011). An assessment of the use of transaction cost theory in information technology outsourcing. The Journal of Strategic Information Systems, 20(2), 125-138.

Ali, A. S., & Muathe, S. M. (2020). Facilitation Strategy and Performance of Donor Assisted Water Supply and Sanitation Development Projects in Wajir County, Kenya (Doctoral dissertation, Kenyatta University)

Bhorat, H., & Kimani, M. (2018). South Africa’s growth trap: The constraints on economic growth and the role of water. Water Resources Commission, 2601(1), 18

Chan, L. L., & Idris, N. (2017). Validity and reliability of the instrument using exploratory factor analysis and Cronbach’s alpha. International Journal of Academic Research in Business and Social Sciences, 7(10), 400-410.

Chebet, W. K. (2021). Role of monitoring and evaluation in development of school infrastructure in Marakwet West Sub-County, Kenya (Doctoral dissertation, Moi University)

Chege, F. M., & Bowa, O. (2020). Monitoring and evaluation and project performance in Kenya: the case of non-governmental organisations implementing education projects in Nairobi County. International Academic Journal of Information Sciences and Project Management, 3(6), 312-337.

Cheney, G., & Tompkins, P. K. (1987). Coming to terms with organizational identification and commitment. Communication Studies, 38(1), 1-15.

Chipulu, C., Mwanaumo, E., Mwiya, B., Haabazoka, L., & Chisumbe, S. (2019). Accuracy Influencing Factors for Pre-tender Cost Estimates for the Roads Sector in Zambia. In Construction Industry Development Board Postgraduate Research Conference (547-555).

Delmon, J. (2021). Water projects: a commercial and contractual guide. BRILL

Doyle, L., McCabe, C., Keogh, B., Brady, A., & McCann, M. (2020). An overview of the qualitative descriptive design within nursing research. Journal of Research in Nursing, 25(5), 443-455.

Eyibio, O. N., & Daniel, C. O. (2020). Effective Resource Budgeting as a Tool for Project Management. Asian Journal of Business and Management (ISSN: 2321-2802), 8(2)

Fazil, M. W., Lee, C. K., & Tamyez, P. F. M. (2021). Cost Estimation Performance in the Construction Projects: A Systematic Review and Future Directions. International Journal of Industrial Management, 11, 217-234.

Feghaly, J., El Asmar, M., & Ariaratnam, S. T. (2021). A comparison of project delivery method performance for water infrastructure capital projects. Canadian Journal of Civil Engineering, 48(6), 691-701.

Gidey, B. (2019). Staff Perception on Project Cost Management; The Case Of Save The Children Ethiopia, Addis Ababa (Doctoral dissertation, St. Mary's University).

Hanisch, B., & Wald, A. (2012). A bibliometric view on the use of contingency theory in project management research. Project Management Journal, 43(3), 4-23.

Hussein, Y. N. (2020). Influence of monitoring practices on projects performance at the water sector trust fund (Doctoral dissertation, Africa Nazarene University).

Hwang, B. G., Shan, M., Zhu, L., & Lim, W. C. (2020). Cost control in megaprojects: efficacy, tools and techniques, key knowledge areas and project comparisons. International Journal of Construction Management, 20(5), 437-449.

Johnston, B. D. (2014). Sharing data collection instruments. Injury prevention, 20(2), 73-73

Jones, D. E. (2019). Project Cost Monitoring. In Drug Development (15-26). CRC Press.

Joseph, F., Egwu, K., Agbo, M., & Nnadi, E. (2020). Project Cost Control for Effective Risk Management in Nigeria Construction Industry. Inosr Applied Sciences, 6(1).

Joseph, O. O., & Caleb, K. C. (2021). Cost Management and Implementation of Construction Projects in Elgeyo Marakwet County, Kenya. African Journal of Education, Science and Technology, 6(4), 133-143.

Karadimos, P., & Anthopoulos, L. (2021). Neural Network Models for Actual Cost and Actual Duration Estimation in Construction Projects: Findings from Greece. International Journal of Structural and Construction Engineering, 15(5), 250-261.

Karunakaran, P., Abdullah, A. H., Nagapan, S., Sohu, S., & Kasvar, K. K. (2018). Categorization of potential project cost overrun factors in construction industry. In IOP Conference Series: Earth and Environmental Science 140 (1) 012098

Kermanshachi, S., Anderson, S., Molenaar, K. R., & Schexnayder, C. (2018). Effectiveness assessment of transportation cost estimation and cost management workforce educational training for complex projects. In International Conference on Transportation and Development 2018: Planning, Sustainability, and Infrastructure Systems (82-93). Reston, VA: American Society of Civil Engineers.

Khodeir, L. M., & El Ghandour, A. (2019). Examining the role of value management in controlling cost overrun [application on residential construction projects in Egypt]. Ain Shams Engineering Journal, 10(3), 471-479.

Kim, Y. W. (2019). The impact of make-ready process on project cost performance in heavy civil construction projects. Production Planning & Control, 30(13), 1064-1071.

Kissi, E., Agyekum, K., Baiden, B. K., Tannor, R. A., Asamoah, G. E., & Andam, E. T. (2019). Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9 (3), 364-382

Kosgei, N. K. (2021). Stakeholder Consultation and Implementation Water Projects: A Case of Machakos County, Kenya. East African Journal of Business and Economics, 4(1), 14-21.

Koskela, L., & Howell, G. (2002). The theory of project management: Explanation to novel methods. In Proceedings IGLC, 10 (1), 1-11

Kwon, H., & Kang, C. W. (2019). Improving project budget estimation accuracy and precision by analyzing reserves for both identified and unidentified risks. Project Management Journal, 50(1), 86-100.

Liu, L., Borman, M., & Gao, J. (2014). Delivering complex engineering projects: Reexamining organizational control theory. International Journal of Project Management, 32(5), 791-802.

Love, P. E., Ahiaga-Dagbui, D. D., Smith, S. D., Sing, M. C. P., & Tokede, O. (2018). Cost profiling of water infrastructure projects. Journal of Infrastructure Systems, 24(4), 04018023

Lu, X. (2019). A study on the cost of production in film project management: Taking small-budget films in China as an example. Open Journal of Social Sciences, 7(03), 75.

Lukale, A. M. (2018). Determinants of cost overruns in rural roads infrastructure projects in Kenya (Doctoral dissertation, Strathmore University).

Madu, N., Jimoh, R., Shittu, A., & Tsado, T. (2019). Assessment of Drivers and Challenges of the Use of Cost Control Techniques in Dam Project Delivery in Nigeria. Environmental Technology and Science Journal, 10(2), 53-63

Mbugua, M., & Winja, M. (2021). Identification and Ranking of Key Performance Indicators in Building Construction Projects in Kenya. Engineering, Technology & Applied Science Research, 11(1), 6668-6673.

McKenney, S., & Reeves, T. C. (2018). Conducting educational design research. Routledge

Mokua, C., & Kimutai, G. (2019). Monitoring and Evaluation Systems and Performance of Public Private Partnership Projects in Nairobi City County, Kenya. International Journal of Current Aspects, 3(6), 124-148.

Morris, P. W. (2002, May). Science, objective knowledge and the theory of project management. In Proceedings of the Institution of Civil Engineers-Civil Engineering, 150 (2), 82-90) Thomas Telford Ltd

Muema, D. M., & Ngugi, L. (2021). Critical Success Factors and Performance of Water Projects in Machakos County, Kenya. Journal of Entrepreneurship & Project Management, 1(2), 25-37.

Murata, K., Tezel, A., Koskela, L., & Tzortzopoulos, P. (2017). An Application of Control Theory to Visual Management for Organizational Communication in Construction. In 25th Annual Conference of the International Group for Lean Construction (185-191)

Mutya, T. (2018). Cost control: A fundamental tool towards organisation performance. Journal of Accounting & Marketing, 7(3), 1-11.

Mwaguni, H. J., Mbugua, J., & Rambo, C. (2020). Budgets and Performance of Research Projects in Public Universities in the Coastal Region, Kenya. European Journal of Business and Management Research, 5(3)

Odhiambo, J. O., Wakibia, J., & Sakwa, M. M. (2020). Effects of monitoring and evaluation planning on implementation of poverty alleviation mariculture projects in the coast of Kenya. Marine Policy, 119, 104050

Omotayo, T., Bankole, A., & Olubunmi Olanipekun, A. (2020). An artificial neural network approach to predicting most applicable post-contract cost controlling techniques in construction projects. Applied Sciences, 10(15), 5171.

Oyolla, C. A. (2019). Factors Influencing Cost of Road Construction Projects Within Selected Urban Areas in Kenya (Doctoral dissertation, University of Nairobi).

Parker, A., & Manley, A. (2017). Goffman, identity and organizational control: Elite sports academies and social theory. Sociology of sport journal, 34(3), 211-222

Pollack, J. (2007). The changing paradigms of project management. International journal of project management, 25(3), 266-274

Richardson, G. L. (2010). Project management theory and practice. Crc Press.

Rindfleisch, A. (2020). Transaction cost theory: past, present and future. AMS Review, 10(1), 85-97.

Romanovich, M. A., & Adel, O. A. (2018). Cost estimation and performance analysis using building information modeling (BIM) for the project in construction industry of Saudi Arabia. In BIM-моделирование в задачах строительства и архитектуры (188-192).

Saad, W., & Taleb, A. (2018). The causal relationship between renewable energy consumption and economic growth: evidence from Europe. Clean Technologies and Environmental Policy, 20(1), 127-136.

Seliudi, M. (2019). “Assessing Factors Causing Delay and Cost Overruns in Construction of Ground Water Project in Dar es salaam (Doctoral dissertation, The Open University of Tanzania)

Shani, F.Y, Owino, Z.B Ogutu, M Iraki, X.N (2021). Competitive strategies and performance of project based Non-Governmental Organizations in Kenya. DBA Africa Management Review, 11(1), 10-18

Sharma, G. (2017). Pros and cons of different sampling techniques. International journal of applied research, 3(7), 749-752

Siele, K. C., & Tibbs, C. Y. (2019). Accounts receivable management and financial performance of Kericho Water and Sanitation Company Limited, Kericho, Kenya. International Academic Journal of Economics and Finance, 3(3), 1-17.

Sinigi, J., & Kaburu, K. (2020). Monitoring and Evaluation and Performance of Youth Employment Projects in Narok County, Kenya. Journal of Entrepreneurship & Project Management, 4(4), 41-55.

Snell, S. A. (1992). Control theory in strategic human resource management: The mediating effect of administrative information. Academy of management Journal, 35(2), 292-327

Taber, K.S. (2018).The Use of Cronbach’s Alpha When Developing and Reporting Research Instruments in Science Education. Res Sci Educ 48, 1273–1296

Tariq, S., & Zhang, X. (2020). Critical failure drivers in international water PPP projects. Journal of Infrastructure Systems, 26(4), 04020038

Waithira, M. D., & Onjure, C. O. (2020). Influence of Cost Control Practices on Performance of Fish Farming Projects Funded by the Kiambu County Government, Kenya. The International Journal of Business Management and Technology, 4 (3), 114-130

Wambua, C. M. (2019). Monitoring And Evaluation Practices And Perfomance Of County Funded Education Projects In Makueni County, Kenya (Doctoral dissertation, Doctoral dissertation, Kenyatta University)

Wang, Q., Mei, T., Kong, L., & Xiao, Y. (2019). Incentive Compensation Structure for Cost Control of Construction Project Based on IPD-Ish in China. In ICCREM 2019: Innovative Construction Project Management and Construction Industrialization (101-108). Reston, VA: American Society of Civil Engineers.

Williamson, O. E. (1979). Transaction-cost economics: the governance of contractual relations. The journal of Law and Economics, 22(2), 233-261

Xue, X., Jia, Y., & Tang, Y. (2020). Expressway Project Cost Estimation With a Convolutional Neural Network Model. IEEE Access, 8, 217848-217866.

Yismalet, A., & Patel, D. (2018). A critical literature review on improving project cost management practice and profitability of domestic contractors. International Journal of Engineering Technologies and Management Research, 5(1), 51-58.

Younas, A., Shahzad, S., & Inayat, S. (2021). Data Analysis and Presentation in Integrative Reviews: A Narrative Review. Western Journal of Nursing Research, 01939459211030344




DOI: http://dx.doi.org/10.61426/sjbcm.v10i4.2776

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.