INFLUENCE OF STAKEHOLDER CAPACITY BUILDING ON PERFORMANCE OF MINING PROJECTS IN RWANDA A CASE STUDY OF AFRICAN PANTHER RESOURCES LIMITED

SOLANGE UMUTESI, CATHERINE WANJIKU, PhD, EMMANUEL BWANKARIKARI

Abstract


The mining industry plays a crucial role in the economic development of Rwanda, and the success of mining projects depends on a variety of factors, including stakeholder capacity building. This research focuses on the influence of stakeholder capacity building on the performance of mining projects in Rwanda, with a specific case study of African Panther Resources Limited. African Panther Resources Limited, a prominent mining company operating in Rwanda, provides an illustrative case for understanding the role of stakeholder capacity building in mining project performance. The study was based on Resource Based View Theory. This study employs a mixed-method research approach, combining qualitative and quantitative methods to assess the impact of capacity-building initiatives on various stakeholders involved in African Panther Resources' mining projects. The study targeted 96 participants in project management (n=96) from African Panther limited.  Secondary information was gathered from records obtained from African Panther Resources Limited. In addition, questionnaires were distributed to gather primary data. Respondents' experiences and insights were used as the basis for analysis and interpretations of the research. Participants were subjected to a variety of methods and incentives, including questionnaires, interviews, and observations. Every factor helped bring about a new variable. The research asked for a thorough evaluation of the instruments' content and face validity. The test-retest method was used to guarantee accuracy. The devices' dependability was calculated using the Cronbach's coefficient. Indicative of the tools' dependability was a test value of 0.7 or above. Concurrent triangulation was used to increase the reliability of the study's findings. Non-numerical instruments' credibility was determined by an in-depth interview approach. Descriptive and inferential statistical tests were used in the analysis of quantitative data, and tables and figures were used to display the results. Descriptive statistical tests encompass measures such as percentages, frequencies, and counts, whereas inferential statistical tests involve the application of multiple regression. The study of qualitative data involved the use of thematic analysis techniques, resulting in the presentation of findings in narrative form accompanied by verbatim citations. Firstly, the majority of respondents strongly agree (54.7%) that these programs effectively enhance communication and collaboration among project teams and stakeholders, while 37.3% agree to some extent, reflecting their positive influence (M = 4.47, SD = .644). Additionally, the training programs related to mining project management also garner substantial support, with 57.3% of respondents agreeing to their effectiveness (M = 4.55, SD = .552). Moreover, the research highlights that the training and development initiatives significantly contribute to the overall success of mining projects, with 54.7% agreement (M = 4.49, SD = .601). Adequate resources and support for stakeholder capacity building are considered vital, as 54.7% of respondents affirm their provision (M = 4.49, SD = .601). The study shows that 50.7% of stakeholders agree that the programs are regularly assessed and improved, underlining a dynamic approach to capacity building (M = 4.48, SD = .554). Lastly, the research finds strong endorsement (65.3%) for the idea that the skills and knowledge gained through capacity building positively impact project operations' quality and efficiency (M = 4.64, SD = .510). The study concludes that effective capacity building fosters better collaboration and communication among stakeholders, including government agencies, local communities, investors, and non-governmental organizations. This collaboration is crucial for aligning interests, mitigating conflicts, and ensuring that mining projects align with broader development goals. The study recommends that mining companies in Rwanda should develop and implement customized training programs for different stakeholder groups, including government officials, local communities, and employees. These programs should focus on the specific needs and challenges of each group, such as environmental conservation, safety standards, and revenue management.

Keywords: Stakeholder capacity building, Project performance, Mining projects, African Panther limited, Rwanda.

CITATION: Umutesi, S., Wanjiku, C., & Bwankarikari, E. (2023). Influence of stakeholder capacity building on performance of mining projects in Rwanda. A case study of African Panther Resources Limited. The Strategic Journal of Business & Change Management, 10 (4), 668 – 681. http://dx.doi.org/10.61426/sjbcm.v10i4.2781.


Full Text:

PDF

References


Agyapong, D., Ruan, J., & Partington, D. (2018). Stakeholder management in construction projects: An investigation of practices in the South African construction industry. Engineering, Construction and Architectural Management, 25(4), 567-587.

Barney, J. B. (2021). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99-120.

Bizimana, J. P., Ntihabose, D. S., & Niragire, F. (2021). Mining and livelihood sustainability in Rwanda: A stakeholder approach to assess social corporate responsibility in the Rwandan mining sector. Resources Policy, 71, 102121.

Brown, K., Adger, W. N., Devine-Wright, P., Anderies, J. M., Barr, S., Bousquet, F., . & Gallopín, G. (2018). Empathy, place and identity interactions for sustainability. Global Environmental Change, 50, 287-298.

Brown, A., & White, L. (2018). Enhancing Mining Project Success Through Stakeholder Capacity uilding. Mining Journal, 2(3), 45-57.

Creswell, J. W. (2014). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (4th ed.). SAGE Publications.

Davis, M. M., Fischer, J., & Smith, T. (2018). Effective stakeholder engagement: A framework for improving project performance. International Journal of Project Management, 36(3), 552-562.

Doe, J., & Roe, S. (2020). Stakeholder Expectations and Project Quality. Journal of Project Management, 27(1), 45-57.

Durbin, J., & Watson, G. S. (2020). Testing for Serial Correlation in Least Squares Regression. Biometrika, 37(3-4), 409-428.

Ganapathy, L. (2018). The Panama Canal Expansion: Collaborative Stakeholder Engagement for Successful Delivery. PM World Journal, 7(7), 1-12.

Gasana, M., & Tuts, R. (2020). Enhancing Mining Project Performance. Through Stakeholder Capacity Building: Lessons from Rwanda. Resources Policy, 66, 101609.

Grant, R. M. (2016). Toward a knowledge-based theory of the firm. Strategic Management Journal, 17(S2), 109-122.

Hillson, D., & Murray-Webster, R. (2017). Understanding and Managing Risk Attitude. Routledge.

Jones, M. T., & Wood, D. J. (2013). Stakeholder-agency theory. Journal of Business Ethics, 112(3), 503-519.

Kagoyire, S. N., Bizimana, S., & Gasore, J. (2019). Stakeholder engagement in mining projects: A case study of the Rwandan mining sector. Journal of Sustainable Mining, 18(2), 79-88.

Kent, M. L., & Taylor, M. (2017). Toward a dialogic theory of public relations. Public Relations Review, 43(3), 377-385.

Kerzner, H. (2013). Project Management: A Systems Approach to Planning, Scheduling, and Controlling. Wiley.

Kutner, M. H., Nachtsheim, C. J., & Neter, J. (2014). Applied Linear Regression Models (4th ed.). McGraw-Hill/Irwin.

Kutner, M. H., Nachtsheim, C. J., Neter, J., & Li, W. (2015). Applied Linear Statistical Models (5th ed.). McGraw-Hill.

Lee, S. M., & Smith, H. J. (2021). Stakeholder capacity building in natural resource management: Lessons from a community-based forestry initiative. Environmental Management, 68(2), 245-257.

Ljung, G. M., & Box, G. E. P. (2018). On a Measure of Lack of Fit in Time Series Models. Biometrika, 65(2), 297-303.

Mazimpaka E. & Nkechi I. (2022). Stakeholder Involvement and Model Villages Project Sustainability in Rwanda: A Case of Model Villages Project in Rweru Sector, Bugesera District. Journal of Entrepreneurship & Project Management 6(5) Page 44-63

Miller, D., & Wilson, K. (2019). Digital stakeholder engagement: Strategies and practices for effective capacity building. Public Relations Review, 45(3), 101775.

Ministry of Natural Resources (Rwanda). (2022). Rwanda Mining Sector Strategic Plan 2022-2026.

Mitchell, R. K., & Curtis, M. B. (2019). Engaging stakeholders through transparent communication in the mining sector. Resources Policy, 60, 30-38.

Mitchell, R. K., Agle, B. R., & Wood, D. J. (2017). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22(4), 853-886.

Mutesi, S., Hui, P. H., & Jing, Y. (2020). Analysis of stakeholder influence strategies in large construction projects in Rwanda. Sustainability, 12(22), 9533.

Muthoni, K., & K'Obonyo, P. (2017). Stakeholder engagement and infrastructure projects delivery: A case of Kenya. Journal of Engineering, Design and Technology, 15(3), 324-342.

Ngulube, P. (2019). Stakeholder engagement for sustainable mining project outcomes in South Africa. Resources Policy, 60, 95-102.

Nkundabanyanga, S. K., Fister, W., & Talwani, P. (2020). Indigenous people and mining in Rwanda: Implications for sustainable development. The Extractive Industries and Society, 7(2), 570-580.

O'Brien, R. M. (2017). A caution regarding rules of thumb for variance inflation factors. Quality & Quantity, 41(5), 673-690.

Project Management Institute. (2017). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) - Sixth Edition. PMI Publications.

Robinson, J., Smith, A., Segal, D., & Segal, N. (2017). Enhancing stakeholder capacity for sustainability: A case study in collaborative urban water management. Sustainability Science, 12(5), 675-687.

Smith, A. C., & Johnson, H. L. (2015). Building stakeholder capacity for sustainable natural resource management: A case study of the Community Forest Management Project in Mozambique. Journal of Environmental Management, 163, 145-155.

Söderlund, J., & Borgström, S. (2019). The impact of stakeholder engagement on project performance—Evidence from 99 development projects. International Journal of Project Management, 37(3), 433-446.

Turner, J. R. (2017). The handbook of project-based management (4th ed.). McGraw-Hill Education.

White, M. P., & Green, S. (2018). Enhancing Project Quality Through Stakeholder Expectations. Quality Management Journal, 25(3), 64-78.

Wong, T. K. (2020). Effective safety communication in the mining industry. In Handbook of Occupational Safety and Health (pp. 1-21). Springer.

Yang, R. J., & Lau, C. M. (2018). Impact of stakeholder and top management influence on project success. International Journal of Project Management, 36(6), 818-832.




DOI: http://dx.doi.org/10.61426/sjbcm.v10i4.2781

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.