PROJECT PROCESS MONITORING ON COMPLETION OF AIRSTRIP PROJECTS IN KENYA

DESNA CHELANGAT KILEL, NEHEMIAH KIPLAGAT, TALLAM ZAKAYO

Abstract


Despite the critical role airstrips play in enhancing regional connectivity and supporting the aviation sector in Kenya, many airstrip projects face significant challenges related to timely and successful completion. Delays, cost overruns, and failure to meet safety and quality standards are common issues that hinder the operationalization of these vital infrastructures therefore the study seeks to assess the effect of project process monitoring on the completion of airstrip projects in Kenya, focusing on the case of Lanet Airstrip in Nakuru County. The study was guided by the theory of change and theory of constraints. A descriptive research design was employed to gather information. The study took place at Lanet Airstrip, which is located at the 80 Tank Battalion Barracks in Nakuru County. The target population for the study includes 95 personnel involved in the Lanet Airstrip construction project, comprising engineers, construction officers, project managers, site agents, and surveyors. A census approach was used to include the entire target population of 95 respondents, considering the small and easily accessible nature of the population. Primary data was collected using questionnaires with closed-ended questions to obtain measurable and quantitative data and eliminate irrelevant answers. The Social Sciences Statistical Package version 25 was used for data analysis, employing a regression model to examine the relationship between the variables. Presentations were done in tables. The findings indicated that process monitoring is a critical technique for reducing the chance of project failure to be completed on time.  To enhance project process monitoring and improve the completion of airstrip projects in Kenya project managers should  adopt real-time monitoring tools for better tracking, strengthening communication and collaboration among stakeholders to ensure timely problem-solving, and conducting regular audits and inspections to maintain quality and compliance

Key words: Project Process Monitoring, Completion of Airstrip Projects

 CITATION: Kilel, D. C., Kiplagat, N., & Zakayo, T. (2024). Project process monitoring on completion of airstrip projects in Kenya. The Strategic Journal of Business & Change Management, 11 (4), 1325 – 1334.  http://dx.doi.org/10.61426/sjbcm.v11i4.3159


Full Text:

PDF

References


Alagidede, P., Mbewe, M., & Apagu, M. (2013). An analysis of the impact of project management practices on project performance in Ghana. International Journal of Project Management, 31(6), 892-904.

Andeso, N. (2021). Nakuru's Lanet airstrip construction: A transformative initiative for regional connectivity. Daily Nation. https://www.nation.co.ke/kenya/news/nakuru-lanet-airstrip-construction-2033244

Anyango, R. (2020). Nakuru County announces Sh 3 billion Lanet airstrip project. The Standard. https://www.standardmedia.co.ke/business/article/2001386778/nakuru-county-announces-sh-3-billion-lanet-airstrip-project

Burt, R. (2016). Theory of change: A guide for development. The Clear Impact Framework. https://www.clearimpact.com/resources/theory-of-change/

Cheng, E. W. L. (2014). Construction cost escalation: A case study of the UK and Australia. International Journal of Project Management, 32(4), 563-573.

Damoah, I. S., & Kumi, E. (2018). Examining the effects of project management on performance in Ghana. International Journal of Project Management, 36(6), 914-926.

Dyer, J. H., Godfrey, P. E., Jensen, R., & Mason, K. (2019). Towards a systematic theory of project management success. International Journal of Project Management, 37(5), 689-700.

Florentine, S. (2017). IT project failures: Why do so many projects fail? CIO. https://www.cio.com/article/3215560/it-project-failures-why-do-so-many-projects-fail.html

Heeks, R. (2018). Information systems for development: A critical review. Journal of Information Technology, 33(1), 43-56.

Irfan, M., Khan, F., Hassan, A., Hassan, S., & Habib, A. (2021). The impact of project monitoring on project success: A quantitative study. Project Management Journal, 52(2), 174-188.

Jean, L. K., Diana, C., & Avan, B. I. (2011). Theory of change in practice: Lessons learned from the UK. Evaluation and Program Planning, 34(2), 187-195.

Jean, L. K., Diana, C., & Avan, B. I. (2016). The theory of change approach: A practical guide to the theory of change process. Evaluation and Program Planning, 56, 194-203.

Jaselskis, E. J., & Ashley, D. B. (2021). Project performance: How project team, planning, and control affect project success. Journal of Construction Engineering and Management, 147(3), 04020164.

Kharub, M., & Saini, R. (2021). Project monitoring and evaluation: A systematic review. International Journal of Project Management, 39(4), 402-415.

Mbarawa, M. (2016). African aviation: The next infrastructural frontier. Journal of Transport and Supply Chain Management, 10(1), 1-9.

Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: A framework for understanding project success. International Journal of Project Management, 32(2), 184-196.

Mokwena, G., & Fregidou-Malama, M. (2020). Addressing the challenges of air transport development in Africa: Insights from stakeholders. African Journal of Transportation Studies, 12(2), 1-10.

Okereke, C. (2017). The failure of the Toshka project: Lessons for Egypt’s future developments. Egyptian Journal of Engineering Sciences, 36(3), 45-60.

Odhiambo, J., & Kaibui, A. (2016). Project delivery delays and cost overruns: Evidence from Kenya's air transport sector. Journal of Air Transport Management, 54, 43-53. https://doi.org/10.1016/j.jairtraman.2016.09.002

Patanakul, P. (2018). The impact of project management on project success: A critical review. International Journal of Project Management, 36(2), 382-397.

Solon, O. (2015). Taxpayer money wasted on failed IT projects: A cost of £100 million. The Mirror.

Toshka New Valley Project. (2017). Project report: Analysis of the Toshka New Valley development initiative. Egyptian Journal of Urban Studies, 45(1), 99-117.

Yaoga, M. (2015). The theory of constraints in project management: A review of the literature. Project Management Journal, 46(3), 56-69.

Zuofa, T. (2018). The challenges of infrastructure development in Nigeria: A case study of the Abuja Investment and Property Development Company. International Journal of Urban and Regional Studies, 42(3), 321-334.




DOI: http://dx.doi.org/10.61426/sjbcm.v11i4.3159

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.