DETERMINANTS OF SUCCESSFUL COMPLETION OF ROAD MAINTENANCE PROJECTS IN KENYA: A CASE STUDY OF KENYA NATIONAL HIGHWAYS AUTHORITY

HENRY GAKURU NGUGI

Abstract


Completion of road maintenance projects in Kenya suffers from many problems and complex issues in performance. There are many realistic reasons such as closures, amendment of drawings and designs and delayed release of funds. In addition, there are other different reasons affecting completion of road maintenance projects in Kenya such as poor management and leadership; poor relations and coordination; absence of motivation, control, monitoring or decision making systems; inadequate infrastructure, political problems; cultural problems and economic conditions. The general objective of this study was therefore to explore determinants of successful completion of road maintenance projects in Kenya. The specific objectives of the study were; environmental factors and capacity of contractors of the road maintenance projects in Kenya. A descriptive research design was adopted. The two independent variables were anchored on relevant theories as per this study. The target population for this study was composed of staff in the 10 regions of coverage of Kenya National Highways Authority and its head office in Kenya, specifically road engineers and road inspectors, since they were involved in one way or the other in decision making on roads maintenance projects. The study used a census of all the respondents. Data was collected with the help of instruments which were both structured and semi-structured questionnaires. The data for this study consisted both primary and secondary. Pilot test were done on the instruments to disclose their reliability and validity before the actual collection of data. The collected data was analyzed with the help of Statistical Package for Social Sciences (SPSS) version 23 and the findings for this study were presented in form of pie charts, graphs, tables and figures. Results implied that successful completion of road maintenance projects in Kenya was collectively influenced by Project Contractor’s Capacity and Project Environment.

 

Key Words: Environmental factors, Capacity of Contractors, Kenya National Highway Authority


Full Text:

PDF

References


Al-Momani H., (2010), Examining service quality within construction processes, Technovation, 20, 643.651.

Barrett, "Systems and relationships for construction quality," International Journal of Quality & Reliability Management, vol. 17(4/5), pp. 377-392, 2000.

Burningham S. and Stankevich N. 2005, Why road maintenance is important and how to get it done, Transport note no. TRN-4, World Bank, Washington DC.

Canadian International Development Agency and Consultants. 1996. Project Feasibility Study Report. Mombassa Urban Transportation Strategy, Project documentation. Hull, Canada: Industrial Cooperation Division,CIDA.

C. M. T. Albert P.C. Chan, "Factors affecting the quality of building projects in Hong Kong,"

International Journal of Quality & Reliability Management, vol. 17, pp. 423-442, 2000.

D. A. a. H. M. Gunaydin, "Factors That Affect Process Quality in the Life Cycle of Building Projects," J. Constr. Eng. Manage, vol. 124(3), pp. 194-203, 1998.

D. I. OT Ibironke, "Factors Affecting Time, Cost and Quality Management in Building Construction Projects," FUTY Journal of the Environment, vol. 6(1), 2011.

Factors," International Journal of Quality &Reliability Management, vol. 12(5), 1995.

Ferreira A. L. and Meneses S. C. N. 2011, ‘A multi-objective decision-aid tool for road network maintenance management’, 5th International Conference on Bituminous Mixture and Pavements, Thessaloniki, 1–3 June.

Huang A, Levinson D, 2009, ``Retail location choice with complementary goods: an agent-based model'', in Complex Sciences Ed. I Zhow (Springer, Berlin) pp 175 ^ 187

Huang A, Levinson D, 2011, ``Why retailers cluster: an agent model of location choice on Supply chains'' Environment and Planning B: Planning and Design 38 82 94

Jacobson J, Forsyth A, 2008, ``Seven American TODs: good practices for urban design in transit-oriented development projects'' Journal of Transport and Land Use 1(2) 51 ^ 88

J.a. Gunaydin, "Total quality management in the construction process," International Journal of Project Management, vol. 15(4), pp. 235-243, 2007.

J. I. a. A. Mwasha, "The Effects of ISO Certification on Organization Workmanship Performance," QMJ, vol. 19(1), pp. 53-67, 2012

Jackson K., (2010) Fundamentals of Project Performance Measurement,: [http://alarcos.inf-cr.uclm.es/doc/pgsi/doc/otros/pmbok-2000.pdf]

Jackson, B. (2008) Construction Management Jump Start, Sybex, Incorporated, Key relationship-based determinants of project performance in China, Building and Environment, 41, 915-925

Jenelius E, 2010, ``User inequality implications of road network vulnerability'' Journal of Transportand Land Use 2(3/4) 57 ^ 73

John Wiley & Sons 2000. Kantner, The ISO 9000 Answer Book.

K. N. J. K. C. IYER, "Critical Factors Affecting Quality Performance in Construction Projects," Total Quality Management, vol. 17(9), pp. 1155-1170, 2006.

Kothari,C.R (2011). Research Methodology. Methods and Techniques. New Delhi: New Age International Publishers. (2nd Edition).

Levinson D, Krizek K, 2008 Planning for Place and Plexus: Metropolitan Land Use and Transport (Routledge, New York)

Levinson D,Yerra B, 2006, ``Self-organization of surface transportation networks'' Transportation Science 40 179 ^ 188

Levinson D, Xie F, Zhu S, 2007, ``The co-evolution of land use and road networks'', in Seventeenth International Symposium on Transportation and Traffic Theory at Imperial College, London Eds R E Allsop, M G H Bell, B Heydecker (Emerald, Bradford,West Yorkshire) pp 839 ^ 859

Love, P. E. D. & Smith, J. (2003) Benchmarking, benchaction, and benchlearning: rework mitigation in projects,ASCE Journal of Management in Engineering, 19(4), pp. 147–159.

McElroy, M., (2010). Integrating complexity theory, knowledge management and organizational learning. Journal of knowledge management, 4(3), 195-203.

M. I. A. Rifat N. Rustom, "Modeling the factors affecting quality in building construction projects in gaza strip," Journal of Construction Research, vol. 7(33), pp. 241-252, 2006.

Mugenda and Mugenda (2003). Quantitative Research Method Analysis Kenya; Nairobi Press.

O. A. Adenuga, "Factors Affecting Quality in the Delivery of Public Housing Projects in Lagos State, Nigeria," International Journal of Engineering and Technology, vol. 3(3), pp. 332-344, 2013. Samuels, "Construction facilities audit: quality system and performance control," Journal of Management in Engineering, vol. 10(4), 1994.

P. E. Love, and Heng Li, "Quantifying the causes and costs of rework in construction,"

Construction Management & Economics vol. 18(4), pp. 479-490, 2000. FIDIC. Quality of Construction [Online].

P. S. B. A. Bezelga, Management, Quality and Economics in Building: Routledge, 2002.

R. a. Sanders, Operation Management John Wiley &Sons 2011.

R. H. Abdel -Razek, El -Dosouky, A.I. and Solaiman, A.M. , "A Proposed Method to Measure Quality of the Construction Project," International Exhibition Conference for Building & Construction, Egypt. , 2001.

R. R. a. L. Tan, Y.G., "On the Quality of Construction Engineering Design Project: Criteria and Impacting Swenson-Lepper, T. (2005). Ethical sensitivity for organizational communication issues:Examining individual and organizational differences. Journal of Business Ethics,59, 205–231

Saelens, B., Sallis, J., Black, J., Chen, D. (2003). Neighborhood-based differences in physical activity: An environment scale evaluation. American Journal of Public Health, 93(9), 1552- 1448.

S. M. A. Rizwan U. Farooqui, and Sarosh H. Lodi., "Assessment of Pakistani Construction Industry – Current Performance and the Way Forward " Journal for the Advancement of Performance Information and Value vol. 1(1), pp. 51-72, 2008.

Weligamage, J., Piyatrapoomi, N. and Gunapala, L. (2011) Techniqal Report of Traffic Speed Deflectometer, Queensland Trial.

World Bank. 1996a. “Regional Environmental Assessment,” m Environmental Assessment Sourcebook Update, no. 15. Washington, DC: World Bank, Environment Department.

World Bank. 1996b. The Impact of Environmental Assessment: Second Environmental Assessment Review of Projects Financed by the World Bank (hdy 2992 - ]une 2995).

Washington, DC: World Bank, Environment Department.

World Bank. 1995. “Sectoral Environmental Assessment,“ in Environmental Assessment Sourcebook Update, no. 4.Washington, DC: World Bank, Environment Department.

Xie F, Levinson D, 2007, ``Measuring the structure of road networks'' Geographical Analysis 39 336.

Xie F, Levinson D, 2009a, ``The topological evolution of road networks'' Computers, Environment, and Urban Systems 33 211 ^ 223

Zhang, Z., Jaipuria, S., Murphy, M.R., Sims, T. and Garza, T. (2010) ‘Pavement preservation. transportation research record’, Journal of the Transportation Research Board, Vol. 2150,No. 1, pp.28–35.




DOI: http://dx.doi.org/10.61426/sjbcm.v4i2.441

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.