DETERMINANTS OF TIMELY COMPLETION OF CONSTRUCTION PROJECTS AT KENYA AIRPORTS AUTHORITY

ROSELINE NYAMWANGE

Abstract


The aim of this study was to assess the determinants of timely completion of construction projects at Kenya Airports Authority. Empirical review on budgets; contract variation; monitoring and evaluation; and staff competencies was conducted. The study used a descriptive survey design. The target population for this research was 122 staff obtained from KAA project management department that had been handling different projects at KAA for the last 5 years. Questionnaires were coded, given a distinct number and data entered manually in a computer. This was then analyzed and tabulated accordingly. Data was represented by use of frequencies, percentages and tabulated in frequency tables and descriptive statistics. The study found that budgeting, staff competencies, monitoring and evaluation had appositive and significant correlation with timely completion of construction projects at KAA. The study also found that contract variation had a negative and significant correlation with timely completion of construction projects at KAA. The study recommended that KAA should come up with budgeting procedures which aims to enhance the performance of construction projects such as introduction of budget plans, budget control processes and stakeholder involvement in budgeting process. There is also a need for KAA to involve all the stakeholders involved in project management to reduce contract variation. The management should come up with specific policies that prevent adjustment of the quantity, quality and scope of construction projects by over 15%. The findings of the study also led to the recommendations that KAA should enhance monitoring and evaluation of construction projects by enhancing the monitoring of project viability and increasing performance auditing since it influences performance of construction at KAA positively and significantly. Furthermore, there is a need to establish training programmes to enhance the competence of the project team. There is also a need to recruit based on experience, education level and skills.

Key Terms: Budgeting, Staff Competencies, Monitoring and  Evaluation, Contract Variation, Completion of Construction Projects


Full Text:

PDF

References


Achieng Michael, (2005), A Comparative Study between Construction Project Management and Traditional Approach, MA Thesis, University of Nairobi Agreement and Conditions of Contract for Building Works: 1999 Edition, Published by The Joint Building Council, Kenya.

Ahmed, S.M., Azhar, S., Castillo, M.& Kappagantula, P. (2002) Construction Delays in Florida: An Empirical Study, Final Report Submitted to State Florida, Department of Community Affairs, Florida.

Allen, T. J., & Katz, R. (2012). Age, education and the technical ladder. IEEE transactions on engineering management, 39(3), 237-245.

Alreck P.L.,& Settle R.B, (1985), The Survey Research Handbook: the Irwin series in marketing, Irwin.

Ayudhya, B. I. N.(2011), Evaluation of Common Delay Causes of Construction. Journal of Civil Engineering and Architecture, 5(1) 1027-1034.

Bucur, I. (2013). Managerial core competencies as predictors of managerial performance, on Diff erent Levels of Management. Procedia – Social and Behavioural Science, 2(78) 365–369.

Chan D.W.M.,&Kumaraswamy M.M (1995) A Study of Factors Affecting Construction Durations in Hong Kong; Construction Management & Economics, E& FS Spon.

Chang, T., & Chuang, S. (2011). Performance implications of knowledge management processes: examining the role of infrastructure capability and business strategy. Expert System with Applications, 3(38) 6170–6178.

Chism, N. & Armstrong, G. (2010). Project delivery strategy: getting it right. KPMG International, 2(3) 1-24.

Collier, K. F., (1974) Fundamentals of Construction Estimating and Cost Accounting, New Jersey, Prentice Hall.

De Leeuw, C. P. (1988) Building Contract Periods, The Building Economics Manual, South Africa, C.P. De Leeuw (pty) Ltd.

Dlakwa, M. M &Culpin M.F (1990), Reasons for Overruns in Public Sector Construction Projects in Nigeria, International Journal of Project Management, 8: 237-241, Elsevier Science Ltd.

El-Sabaa, S. (2011). The skills and career path of an effective project manager. International journal of project management, 19(1), 1-7.

Fincham, B. (2008). Enhancing Response Rate. Qualitative Health Research, 18(6), 853-862.

Flannagan, R.,& Norman G. (2002), Risk Management and Construction: Oxford Blackwell Publishers.

Frenzel, L.E. (1987),Crash Course in Artificial Intelligence and Expert System, Indianapolis, USA: Haward W. Sams& Co.

Frosdick, S. (1997), The Technique of Risk Analysis are Insufficient in Themselves; Disaster Prevention and Management, 6(3); 167-177, MCB, University Press.

Ganiyu, B.O., & Zubairu, I.K. (2010). Project cost prediction model using principal component regression for public building projects in Nigeria. Journal of Building Performance ISSN: 1(3) 21-28.

George, T.H. (1975), Time, Cost and Architecture, McGraw Hill, New York.

Gichunge, H. (2008), Risk Management in the Building Industry in Kenya: An Analysis of Time and Cost Risks, PHD Thesis, University of Nairobi

Hussin, A.A., & Omran, A. (2011). Implication of non-completion projects in Malaysia. ACTA Technica Corviniensis-Bulletin of Engineering, University Polytehnica Timisoara. Romania.

Ireri, G.K, (2008), An Identification of Causes and Effects of Cost Overruns on the Client, Design Team, Main Contractor, Subcontractor, Objective in a Building Project, MA Thesis University of Nairobi.

Isabella N.W, (2008), An Investigation into the Training of Labour in the Informal Construction Sector in Kenya, PHD Thesis, University of Cape Town.

Jagboro, D., & Ogunsemi, G. (2006). Time-cost model for Building projects inNigeria. Construction Management and Economics, 253-258. [38].

Kabue, M. (2011) Factors Influencing Women Involvement in Implementation of Community Development Projects; A Case of Wanyororo Integrated Sustainable Development Unit, MA Thesis, University of Nairobi.

Kagiri D.N. (2005), Time and Cost Overruns in Power Projects in Kenya: A Case Study of KENGEN, University of Nairobi.

Kikwasi, G.J. (2012) „Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania‟, Australasian Journal of Construction Economics and Building, Conference Series, (2) 52-59.

Kikwasi, G.J., (2012) “Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania”, Australasian Journal of Construction Economics and Building, Conference Series, 4(2) 52-59.

Kimani S.M; (2004), An Investigation into Role of Planning in Managing Delays in Construction Projects, MA Thesis, University of Nairobi.

Kivaa, T, (2000), Developing a Model for Estimating Construction Period; a Survey of Building Projects in Nairobi, MA Thesis, University of Nairobi.

Kothari, C. R. (2004). Research Methodology; Methods & Techniques. New Delhi, India: New Age International Publishers. [41].

Krejcie, R.,& Morgan D, (1970) Determining Sample Size for Research Activities, Education and Psychological Measurements.

Letmathe, P., Schweitzer, M., & Zielinski, M. (2012). How to learn new task: shop fl oor performance eff ects of knowledge transfer and performance feedback. Journal of Operational Management, 4(30) 221–236.

Lock, D. (1973).Engineers Handbook of Management Techniques, Hants, Gower press.

Love P.E.D, Raymond Y.C.Tse, & David J. Edwards, (2005), Time-Cost Relations in Australia Building Construction Projects; Journal of Construction Engineering and Management, 131-2: 187-194, ASCE.

Mansfield, N.R., Ugwu O.O., & Doran T. (1994) „Causes of Delay and Cost Overruns in Nigeria Construction Projects‟, International Journal of Project Management, 12 (4), 254-260.

Martinelli, F. (2014). Introduction to Competencies: Leadership Competency.

Mbatha C.M, (1986), Building Contract Performance: A Case Study of Government Projects in Kenya, MA Thesis, unpublished, University of Nairobi.

McMiniminee, J.C, Shaftlin, S, Warne, T.R., Detmer, S.S., Lester, M.C., Mroczsca G.F, & Yew, C. (2012). Best Practices in Project Management project delivery. Scan Management Arora and Associates, P.C. Washington DC.

Micheli, P. & Mari, L. (2013). The theory and Practice of performance measurement.. Management Accounting Research, 25(2) 147–156.

Mojahed, S. (2009). A project improvement system for effective management of construction projects.(Master’s thesis). Louisiana State University, Louisiana,USA.

Morris, S. (1990) „Cost and Time Overruns in Public Sector Projects‟, Economic and Political Weekly, Nov. 24, 25 (47) 154 -168.

Mugenda , O.M., & Mugenda, A. G. (2009). Research Methods. Quantitative and Qualitative

Mugenda O, Mugenda A, (2003) Qualitative and Quantitative Approaches, Research Methods, Africa Centre for Technology Studies (Acts) Press, Nairobi.

Munano, A. N. (2012).Preconstruction Monitoring: Exploring The Factors That Influence Timeliness of Project Completion for Public Sector s in Kenya. MSC Thesis. [58].

Mwangi, G. (2006), Risk Management in Relation to Money and Time in Building Construction Projects.

Nyaguthii J. (2005), An Investigation of the Budgeting Function in the Management of Commercial Buildings in Nairobi, MA Thesis, University of Nairobi.

Ogunlana, S.O, Thorvaldsson K, Skjoldebrand C, Kabissa J.C.B, Kayumbo H.Y, Yarro J.G, Glass N, Promkuntong K, Jearkjirm V, (1996), Construction Delays in Fast Growing Economy; Comparing Thailand with Other Economies; International Journal of Project Management, 14(1), 37-40.

Oketch, T. O (2004), An Investigation into Risk Management; Response in Handling Building Materials on Construction Sites in Kenya, MA Thesis, University of Nairobi.

Orodho, A. &Kombo, D (2002) Research Methods, Nairobi, Kenyatta University, Institute of Open Learning.

Sambasivan, M., & Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry, International Journal of Project Management, 25 (2) 517–526.

Seaga, (2011): Project Cycle Management Technical Guide. Rome: FAO. URL [Accessed: 05.09.2010].

Ssegawa J. (2007), Study into the causes of poor performance of public construction projects in Botswana. Research report, Faculty of Engineering and Technology, University of Botswana.

Stukhart G. (1984) Contractual Incentives, Journal of Construction, Engineering and Management, ASCE 110(1), 34-42.

Thornton, M.D. (2008). Construction Contract Durations.(Master’s thesis). University of Florida, Florida, USA.

Wachira I.N, (2001), The Construction Industry in the 21st Century; Its Image, Employment Prospects and Skill Requirements; Case Study of Kenya, report for ILO.

Wai, F. (1980), Project Management in Hong Kong, The Quantity Surveyor Journal, IQSK.

Walker, D.H.T, (1995), An Investigation into Construction Time Performance; Construction Management and Economics, E&FN Spon Ltd.

Wambugu, D. M. (2013). Determinant of successful completion of rural electrification projects in Kenya: A case study of Rural Electrification Authority. International Journal of Social Sciences and Entrepreneurship.1(2), 549-560.

Wang, Z., & Wang, N. (2012). Knowledge sharing, innovation and fi rm performance. Expert System with Applications, 39(10) 8899–8908.

Welch G. A (1964), Budgeting: Profit Planning and Control, Premice-Hall Inc, Eagle Word, Cliffs: New Jersey.




DOI: http://dx.doi.org/10.61426/sjbcm.v5i2.685

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.