FACTORS INFLUENCING PERFORMANCE OF ARTISANAL AND SMALL SCALE MINING PROJECTS IN TAITA TAVETA COUNTY, KENYA

JIDRUPH KIMONDO BARU, DR. MAKORI MORONGE

Abstract


The purpose of the study was to establish factors that influence performance of artisanal and small scale mining projects in Taita Taveta County, Kenya. The design of this research was a descriptive survey research. The study used a census and the population for the study was 155 artisanal and small scale mining projects in Taita Taveta County, Kenya. It was notable that there exists a strong positive relationship between the independent variables and dependent variable. The data also had a high value of coefficient off determination (R2 = 0.724. This showed that the independent variables in the study were able to explain 72.40% variation in the performance of artisanal and small scale mining projects in the study area while the remaining 27.60% was explained by the variables or other aspects outside the model. This indicated that the set of independent variables were important factors that needed to be enhanced to boost performance of artisanal and small scale mining projects in the study area. The study recommended for enhancement of stakeholder involvement in the projects. There is need to develop stakeholder engagement plans that describe the project stakeholder requirements. The study recommended that project teams involved in the various projects be equipped with more project management skills to enhance performance of artisanal and small scale mining projects in Kenya. There is a need for enhancing the planning, communication, leadership and management skills of managers. There is also need to ensure that there is adequate project financing to boost the performance of artisanal and small scale mining projects in Kenya. This would reduce budgetary constraints, cost overruns and reduce interference with running of operations according to the project schedule, and reduce the threat of insufficient capital to run project activities. Internal controls and record keeping are important to boost performance of artisanal and small scale mining projects in Kenya.

Key Words: Stakeholder Involvement, Project Management Skills, Project Funding, Technology, Performance



Full Text:

PDF

References


Agot J. S. (2012). The Glittering Facade: Effects of Mining Activities on Surrounding Communities. Third World Network—Africa (TWN—Africa); Nairobi, Kenya.

Aiyetan, O. A., Smallwood, J. J., & Shakantu, W. (2011). Influences on construction project delivery time performance. In the proceeding of Third Built Environment conference, Cape Town, South Africa.

Amutabi, M. (2011), Gender and Mining in Kenya. A Journal of Culture and African Women Studies. African Resource Centre.

Anfara, V. A., & Mertz, N. T. (Eds.). (2006). Theoretical Frameworks in Quantitative Research. Thousand Oaks, CA: Sage.

Auma, E. (2014). Factors Affecting the Performance of Construction Projects in Kenya: A Survey of Low –Rise Buildings in Nairobi Central Business District. The International Journal of Business & Management, 2 (12), 115.

Babbie, E. (2010). Survey research methods (2nd ed.). Belmont: Woodsworth.

Bailey, J., & Burch, M. (2011). Ethics for behavior analysts, Routledge.

Barney, J. (1986). Strategic factor markets: Expectations, luck, and business strategy. Management Science, 32, 1231-1241.

Bordens, K. S., and Abbott, B. B. (2008). Research design methods: A process approaches (7th ed.). New York, NY: McGraw-Hill.

Bruijn , D. H. (2002). Performance Measurement in the Public Sector: Strategies to cope with the Risks of Performance Measurement. International Journal of Public Sector Management.

Chan, M., & Kumaraswamy, M. (2007). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management 15(1), 55-63.

Chan, M., Scott, D., & Chan, L. (2004). Factors affecting the success of a construction project: Journal of Construction Engineering and Management 130 pp. 153.

Chen, H. X. (2009). Approaches to Quantitative Research: A Guide for Dissertation Students, Ireland: Oak Tree Press.

Chirisa, I. (2014). Building and urban planning in Zimbabwe with special reference to Harare: Putting needs, costs and sustainability in focus.

Conner, K. R. (1991). A historical comparison of resource-based theory and five schools of thought within the industrial organization economics: Do we have a new theory of the firm? Journal of Management, 17, 121-154.

Cooper, D. R., & Schindler, P. S. (2010). Business Research Methods. (8th ed.). Mc Graw-Hill, New Delhi, India.

Creswell, J. W. (2003).Research design: Quantitative, qualitative, and mixed methods approaches (2nd Ed.). Thousand Oaks, CA: Sage.

Cronbach, L. J. (1971). Test validation. In R. L. Thorndike (Ed.). Educational Measurement (2nd Ed.). Washington, D. C.: American Council on Education.

Crook, T. R. (2011). Strategic Resources and Performance: A Meta-analysis.

Field, K. (2006). The Use of Quantitative Content Analysis in Case Study Research.

Flyvbjerg, B. (2005). Policy and Planning of Large Infrastructure Project Problems, Causes, Cures. World Bank Policy Research Working Paper 3781, Cambridge University Press, Cambridge.

Fraenkel, J. R., & Wallen, N. E. (2008). How to design and evaluate research in education. Boston: McGraw-Hill.

Freeman, R. E (2004). “A Stakeholder Theory of Modern Corporations”, Ethical Theory and Business, 7th edn

Fudge, N., & Wolfe, C. D. A. (2008). Assessing the promise of stakeholder involvement in health service development: ethnographic study. BMJ, 336, 313.

Gall, M. D., Gall, J. P., & Borg, W. R. (2007). Educational Research: An Introduction. (8th edn), Pearson.

Gatti, S. (2013). Project finance in theory and practice: designing, structuring, and financing private and public projects. Academic Press.

Hansen, K. T. (2012). Managing Africa’s Natural Resource Endowments. New Dispensation and Good-fit Approaches.

Hartman, H. L. (2011). SME Mining Engineering Handbook, Society for Mining, Metallurgy, and Exploration.

Heemskerk, M. (2015). Collecting data in artisanal and small-scale mining communities: Measuring progress towards more sustainable livelihoods. Nat. Resour. Forum

Hilson, G. (2011). Child labour in African artisanal mining communities: Experiences from Northern Ghana. Development and Change, 41(3), 445-473.

Hilson, G. (2013). Small-scale Mining and its Socio-economic Impact in Developing Countries. Nat. Resour. Forum.

Hilson, G., & McQuilken, J. (2014). Four decades of support for artisanal and small-scale mining in sub-Saharan Africa: a critical review. The Extractive Industries and Society, 1(1), 104-118.

Hruschka, F., & Echavarria, C. (2011). Rock-Solid Chances: For Responsible Artisanal and Small Scale Mining, in Series on Responisble ASM, No. 3 2011, Alliance for Responsible Mining [ARM].

Ika, L. A. (2012). Project management for development in Africa: Why projects are failing and what can be done about it. Project management journal, 43(4), 27-41.

Kaliba, C. Muya, M. & Mumba, K. (2009). Cost Escalation and Schedule Delaying Building Construction Projects in Zambia, International Journal of Project Management, (27), 5, 522-531.

Kerzner, H. (2013). A Systems Approach to Planning, Scheduling and Controlling. John Wiley & Sons.

Koh, H. C., & Tan, G. (2011). Data mining applications in healthcare. Journal of healthcare information management, 19(2), 65.

Kothari, C. R. (2004). Research methodology: Methods and techniques. New Delhi: New Age International (P) Limited Publishers.

Kumar, C. (2006). Research Methods. (2ndedn.). New York: Harper and Row.

Laurence, D. (2011). Establishing a sustainable mining operation: an overview. Journal of Cleaner Production, 19(2-3), 278-284.

Leary, M. R. (2011). Introduction to Behavioral Research Methods, Books a La Carte. (7th edn). Pearson Publishers.

Lin-lin, X., Yang, Y., Hu, Y., & Chan, A.P.C. (2014). Understanding project stakeholders’ perceptions of public participation in China's infrastructure and construction projects: Social effects, benefits, forms, and barriers", Engineering, Construction and Architectural Management, 21(2), 224 – 240.

Marcelino-Sádaba, S., Amaya, P., Angel, M. Echeverria, L. & Pedro, V. (2014). Project Risk Management Methodology for Small Firms.

Mahdavinejad, M., & Molaee, M. (2011). The result of delayed projects on publics' satisfaction in Tehran. In 2nd International Conference on Construction and Project Management IPEDR. Singapore (pp. 16-18).

Marchewka, J. T. (2006). Information Technology Project Management: Providing Measurable Organizational Value, 2nd ed., Wiley, New York, NY.

Ministry of Mining. (2016).Annual Report on the Performance of Artisanal and Small Scale Mining Operations in Kenya.

Mugenda, O. M., & Mugenda, A. G. (2003). Research Methods, Quantitative & Qualitative Approaches. Acts Press: Nairobi.

Müller, R., & Jugdev, K. (2012). Critical success factors in projects Pinto, Slevin, and Prescott – the elucidation of project success. International Journal of Managing Projects In Business, 5(4), 757-775.

Musa, G. H. (2009). “Determination of Factors Influencing Projects Delays in Water Projects in Kenya: The Case of County government Funded Projects”. Unpublished MBA Thesis, University of Nairobi.

Mwandali, D. (2006). “Analysis of Major Factors that Affect Projects Management: A Case of Kenya Railways Projects”, Unpublished MBA Thesis, University of Nairobi.

Nana, A. (2010). Delays in building construction projects in Ghana.

Ndaro, T. V. (2017). Strategic Practices Influencing the Implementation of Small-Scale Mining Projects In Kenya: A Case Of Artisan Miners In Taita Taveta County.

Nyandika. (2014). Influence of stakeholders' participation on performance of road projects at Kenya National Highways Authority ; A Research Project Submitted in Partial fulfillment for the award of degree of master of science in project management of Jomo Kenyatta University of Agriculture and Technology

Nixon, P., Harrington, M., & Parker, D. (2012). Leadership performance is significant to project success or failure: a critical analysis. International Journal of productivity and performance management, 61(2), 204-216.

Ondieki, W. M. (2011). Factors influencing stakeholders' participation in monitoring and evaluation of Local Authority transfer fund projects in Kisii municipality, Kenya. Available at http://erepository.uonbi.ac.ke:8080/handle/123456789/3906.

Onions, W. (2007). A Knowledge Based Theory of Project Management: McGraw-Hill, pp 61-72.

Orotho, J. A. (2009). Essentials of Educational and Social Science Research Methods. Nairobi: Masola Publishers.

Pemsel, S., & Wiewiora, A. (2013). Project management office a knowledge broker in project-based organisations. International Journal of Project Management, 31(1), 31-42.

Project Management Institute. (2012). A Guide to the Project Management Body of Knowledge. 5th edn.

Salthouse, T. A. (2012). Robust Cognitive Change. Journal of the International Neurosychological Society, 18, 749-756.

Särndal, V. S., Swensson D., & Wretman, E. W. (2011). Sample Survey Principles and Methods. New York: Oxford University Press.

Sampson, B. (2007). Get with the project. Professional Engineering, 20 (12), 41-42.

Saunders, M. (2011). Research Methods for Business Students.(4thedn.). Harlow: Financial Times Prentice Hall.

Serdar, S. D. (2009). The role of top management team's information technology (IT) infrast9999ructure view on new product development: Conceptualizing IT infrastructure capability as a mediator. European Journal of Innovation Management, 12(3), 364 – 385.

Spiegel, S. J., & Veiga, M. M. (2010). International guidelines on mercury management in small-scale gold mining. Journal of Cleaner Production, 18(4), 375-385.

Sawang, S., & Unsworth, K. (2011). Success Traits for a Construction Project. Journal of Construction Engineering & Management,138(10), 1131-1138.

Spiegel S. J. (2011). Governance Institutions, Resource Rights Regimes, and the Informal Mining Sector:

Winch, G. M. (2010). Managing construction projects. John Wiley & Sons.

World Bank. (2013). Artisanal and Small Scale Mining. Artisanal Mining Focus.

Yin, R. K. (2013).Case Study Research: Design and Methods, (3rd edition). Sage Publications, London.

Zami, M. S. (2011). Potentialities of contemporary earth construction addressing urban housing crisis in Africa –A lesson from Zimbabwe. Plenary Paper Session I: Water, 66.

Zhang, Z. H. (2000). Implementation of Total Quality Management: An Empirical Study of Chinese Manufacturing Firms. Unpublished doctoral dissertation, University of Groningen, Groningen, Netherlands.

Zou, P. X. W., Zhang, G., & Wang, J. (2006). Identifying key risks in construction projects: life cycle and stakeholder perspectives. www.prress.net/papers/Zou_risks-construAccessed 4/9/2012.




DOI: http://dx.doi.org/10.61426/sjbcm.v5i3.817

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.