FACTORS INFLUENCING IMPLEMENTATION OF IRRIGATION WATER DEVELOPMENT PROJECTS: A SURVEY OF THE PROJECT TEAM IN MWEA, KENYA

RISPER OKUMBE

Abstract


The purpose of the study is to investigate the influence of project team on implementation of irrigation water management improvement projects. The focus of the study was on the project consultants, project contractors, project client and project beneficiaries of the Mwea irrigation water management improvement project, Mwea, Kenya. The problem the study seeks to address is implementation of irrigation water management improvement projects with regards to the project team. The research designs for this study were descriptive and correlation research designs. Descriptive research design will be used to measure the centrality of data through measures of mean and standard deviation. Correlation research design was used to measure the relationships of the variables under investigation. The study sampled 133 respondents drawn from four villages within Mwea area. A questionnaire was used to collect data which includes close-ended and Likert scale question items. The descriptive analysis of the influence of project team on implementation of irrigation projects showed that the highest mean score observed was for project team variable was type of skills influence project time as 68.5 % of the respondents agreed that they influence completion of projects in time.  The least contributing factor among the project team variable was project teamwork influence project time as cited by 31.5 % of the respondents. The study concludes that project team factors influence the implementation of irrigation projects. The study recommends that it is important for the project team to be constituted during the planning stages and not only during the implementation of the project. This will allow the project team to be more committed to the project through teamwork. This study, thus, proposes that further studies should be carried out to determine other factors which contribute to 53% variations in implementation of irrigation water development projects.

Key Words: Implementation of Irrigation Water Management Projects, Project Team, Critical Success Factors.


Full Text:

PDF

References


Bessali, W. and Tukel, O. L. (1997). A new framework for determining critical success/failure factors in projects (1996). International Journal of Project Management, 4 (3), 141-151

Chan, A. P. C., Scott, D. and Chan, A. P. L. (2004). Factors Affecting the Success of a Construction Project, Journal of Construction Engineering and Management, 130, 153-155

Chan, D. W. and Kumaraswamy, M. M. (2008). A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage, 15 (1), 55–63.

Ebbesen, J. B. and Hope, A. J. (2013). Re-imagining the Iron Triangle: Embedding sustainability into project constraints, PM World Journal, 2 (3), 23-31

Ingason, H. T., Haflidason, T. and Jonasson, H. I. (2010). Communication and Trust in Distributed Project Teams. Project Perspectives, 34-40.

Kothari, C.R. (2004). Research methodology: Methods and techniques.(2nd ed.). New Delhi: New Age international ltd.

Mugenda, O. M. and Mugenda, A. G. (2003). Research methods. Quantitative and qualitative approaches. Nairobi. Acts Press.

National Irrigation Board (2013). Mwea Irrigation Scheme Water Improvement Management Programme: Monthly Progress Report. Nairobi. National Irrigation Board

Owolabi, J. D., Amusan, L. M., Oloke, C. O., Olusanya, O., Tunji- Olayeni, P., Owolabi, D., Peter, Joy. and Omuh, I. (2014). Causes and Effect of Delay on Project Construction Delivery Time. International Journal of Education and Research, 2 (4), 197-208

Parsons, V. S. (2006). Project performance: How to access the early stages. Engineering Management Journal, 18 (4), 11-15.

Patrick, R. (2012). Multiple Linear Regression Analysis; research examples, International Journal of Education and Research, 2 (1), 178-185

Pinto, J. and Covin, J. G. (2000). Critical factors in implementation of irrigation water management improvement projects: a comparison of construction and RandD projects, Technovation, 9 (1). 49-62

Sambasivan, M. and Soon, Y. W. (2007). Causes and Effects of Delays in Malaysian Construction Industry, International Journal of Project Management, 25 (5), 517-526.

Saunders,M., Lewis, P. and Thornhill, A. (2009). Research Methods for Business Students. 5th Ed. Harlow: Pearson Education Limited

Shenhar, A. J., Levy, O. and Dvir, D. (2007). Mapping the dimensions of project

success. Project Management Journal, 3, 5–13.

Slevin, D. P. and Pinto, J. K. (2008). The implementation of irrigation water management improvement projects profile: new tool for project managers, Project Management Journal, 3 (11), 57-63.




DOI: http://dx.doi.org/10.61426/sjbcm.v2i2.156

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.