INFLUENCE OF VALUE MANAGEMENT ON CONSTRUCTION QUALITY OF ALL-WEATHER ROAD PROJECTS IN KISUMU COUNTY, KENYA

ANDREW ONYANGO ABOR, DR. HESBON OTINGA (Ph.D)

Abstract


The main purpose of this study was to evaluate the influence of project contracting terms, project site management, project coordination and conflict management on construction quality of all-weather road projects in Kisumu County, Kenya. The study used explanatory survey design and targeted mainly persons charged with ensuring quality of road construction projects in Kisumu County, Kenya. The study used structured questionnaires to collect primary data. From both descriptive and inferential statistics all conceptualized independent variables (project contracting terms, project site management, project coordination and conflict management) significantly influenced construction quality of all-weather road projects in Kisumu County (dependent variable). The study concluded that one, the county government must ensure there are feasible project contracting terms in terms of clear estimation of contract costs, scope, time, funding sources and compensations agreement to enhance construction quality of all-weather road projects; Secondly, effective project site management to ensure availability of quality materials can boost construction quality of all-weather road projects and three, effective project coordination that ensures seamless flow of communication influences construction quality of all-weather road projects. The study recommended that one, county government must ensure there are feasible project contracting terms in terms of clear estimation of contract costs, scope, time, funding sources and compensations agreement to enhance construction quality of all-weather road projects. Secondly, to boost construction quality of all-weather road projects, contractors should ensure there is secure project site management to guarantee safety and quality of construction materials. Thirdly, road construction project coordinators should ensure that there is seamless and timely communication with relevant liaison officers and supervises construction duty allocations so as to ensure there is timely completion of quality all-weather roads. The study recommends that another study can be done to assess the effect of procurement process on timely completion of all-weather roads.

Key Words: Project Contracting Terms, Project Site Management, Project Coordination, Conflict Management, Construction Quality

CITATION: Abor, A. O., & Otinga, H. (2020). Influence of value management on construction quality of all-weather road projects in Kisumu County, Kenya. The Strategic Journal of Business & Change Management, 7(3), 269 – 286.


Full Text:

PDF

References


Aibinu, A.A., Jagboro.G.O. (2012). The effects of construction delays on project delivery in Nigerian Construction Industry, International Journal of Project Management, Vol. 20, pp. 593-599.

Ajmal, S., Farooq, M. Z., Sajid, N., & Awan, S (2012).Role of Leadership in Change Management Process.Abasyn University Journal of Social Sciences,5(2).

Al-Carlos, E. Y. S.(2014) ,"When do Megaprojects Start and Finish? Redefining Project Lead Time for Megaproject success", International Journal of Managing Projects in Business, Vol. 7 Iss 4; 624 – 637

Al-Momani , A, H (2011) A Quantitative Analysis International Journal of Project Management, 18(1), 51–59.Business, Vol. 7 (5).

Ambler, D and Wilson, W (1995). Managing construction projects: An information processing approach. Chichester: Blackwell Pub.

Ameh, W and Osegbo, E (2011). Significant factors causing delay of building construction projects. Engineering Construction and Architecture Management 14(2).

Ashley, S Assaf, S.A. and Al-Hejji, S. (2017). Causes of Delay in Large Construction Projects.International Journal of Project Management. 24 (4):349-57.

Ballard, G (2014). "Understanding project success through analysis of project management approach", International Journal of Managing Projects in Business, Vol. 7 Iss 4 pp. 638-660.

Bassioni, H. A. et al. (2004). “Performance Measurement in Construction.”Journal of Management in Engineering. 20(2), 42-50.

Blair, C Borman, W. C., Ilgen, D. R., &Klimoski, R. J. (1998). Handbook of Psychology, Volume 12, Industrial and Organizational Psychology. Hoboken, NJ: John Wiley & Sons

Chan, D.W.M. &Kumaraswamy, M.M. (2007). A comparative study of causes of time overruns in Hong Kong construction projects, International Journal of Project Management 15(1).

Chen, P and Partington, D (2016). Three conceptual levels of construction project management work. International Journal of Project Management, 24 (6).

Chen, C Ali, A, Alinatwe, M.Alimanzur, K. (2007). Best practices in planning and performance management: Radically rethinking management for a volatile world. Hoboken, N.J: Wiley.

Cheung, S. O.(2004). “PPMS: a Web-based construction Project Performance Monitoring System.” Automation in Construction.361-376.

Cooper, D &Schinder, P. (2007).Business Research methods (8th Ed.). New Delhi: tata McGraw hill.

Dillman, K (2000). Proposal and Thesis writing: An introduction. Nairobi: Pauline’s Publications Africa.

CIDP report (2019). Kisumu County Integrated Development Plan II, 2018-2022. Available online on Kisumu county government website.

El-Sabaa, S. (2011) The skills and career path of an effective project manager. International

Journal of Project Management, 19(2001).

Eliyahu M. Goldratt (2004). The Goal: A Process of Ongoing Improvement, ISBN 978-0-88427-178-9.

Fugar, F.D.K. &Agyakwah-Baah, A.B. (2010).Delays in building construction projects in Ghana, Australasian Journal of Construction Economics and Buildings. Vol.10 (1/2)

Freeman, S (1984). Project management: The managerial process. Boston: McGraw-Hill/Irwin.

Gaba,G. (2013). The impact of project delivery systems, cost minimizations and project control on construction project success.Evidence from Ghana (Master‟s thesis). University College London, United Kingdom.

Garvin, A. (2013). “A Note on Quality: The Views of Deming, Juran, and Crosby.” Harvard Business Review.

Hossain, L., 2009. Effect of organizational position and network centrality on project coordination. International Journal of Project Management, 27: 680-689.

Huang, G (2012). Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Journal of Management in Engineering, 133–139.

Hussin, A.A., Omran, A. (2011). Implication of non-completion projects in Malaysia. ACTA TechnicaCorviniensis-Bulletin of Engineering, University Polytehnica Timisoara. Romania.

Jeffrey, M. (2011). An Analysis of the extent and nature of thefts of equipment within the construction industry report No 1 MEL ref 2001-002 prepared for the Civil Contractors Federation-NDW OAMPS.

Jha, K N (2005) Attributes of a project coordinator. Association of Researchers innConstruction Management, Vol. 1, 115-24.

Kalsen, I (2014). Relationship between construction time and project cost of health sector construction in Bangladesh. Blacksburg, Virginia: Virginia Polytehnic Institute and State University.

Kenya Engineer Magazine,2016). Annual reports on construction projects.Kenya Engineers Magazine.Government printing press.

Kikwasi, G (2012). Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania‟, Australasian Journal of Construction Economics and, Conference Series, 1 (2) 52-59.

Kim, K and Paulson, P, (2013). Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes. Journal of Computing in Civil Engineering, 17 (10)

Kothari C.R., (2007). Research Methodology: Methods and Techniques, New Age International Publishers.

KRB, 2016).Annual reports on construction projects in Kenya.Government printing press.

Kwak, Y. H., and Ibbs, C. W. (2004). “Project Management Process Maturity (PM)2 Model.” Journal of Management in Engineering. 18(3), 150-155.

Lee, H. S.(2014). “Impact of Labor Factors on Workflow.”Journal of Construction Engineering and Management.170(16).

Lundy, C and Morin, S (2013). Criteria of project success: an explaratory reexamination. International Journal of project management. Vol.39.

Mubarak Msafiri, S., (2014).An Investigation into Factors Causing Delays in Road Construction Projects in Kenya.American Journal of Civil Engineering. Vol. 3, No. 3, pp. 51-63.

Mugenda, O, M. &Mugenda, A. G., (2008). Research Methods: Quantitative and Qualitative Approaches. Nairobi: ACTS Press

Neuman, W, L (2005) Social Research Methods: Quantitative and Qualitative Approaches (6th Ed). Boston, MA; Ally & Bacon

Nixon, B Ogunsemi, D. R. & G. O. Jagboro (2012). Time‐cost model for projects in Construction Management and Economics, 49 (8).

Olatunji, A. A. (2010). Influences on construction project delivery time. (PhD. thesis).Nelson Mandela Metropolitan University, Estern Cape, South Africa.

Peshkin, B (1990). Qualitative Inquiry in Education: Teachers College press. New York.

Project Management Institute (2015).Project Management Body of Knowledge; A Guide to Project Management Handbook. Van Nostrand Reinhold, New York, NY.

Pyzdek, B (2013). Leadership development: Applying the same leadership theories and development practices to different contexts?.Leadership, 7(3).

Rose, L. (2015). Measuring Quality Performance on Construction Projects. The Construction Industry Institute

Smith, A & Walmsley, R. (2012). The nature and extent of construction plant theft. Police Research Series. London. Home Office.

Smith,S and Jaggar, W (2017). Causes and effects of delays in Malaysian construction industry, International Journal of Project Management , Vol 25 (2007) pp.517–526.

Tabishl S. Z. S., Jha, K. N. (2011, September 16-18). Important Factors for Success of Public Construction Projects. A paper presented at the 2nd International Conference on Construction and Project Management. Singapore.

UN Habitat (2018). Kisumu City Development Strategy 2013–2018. Nairobi: UNON.

Waddock (2002). Effective project management: Traditional, agile, extreme. Indianapolis, IN: Wiley.

Wesam S and MohdLiew (2015). Duties of Coordination Process in Construction Projects in Gaza Strip. J. Appl. Sci. & Agric., 10(3): 44-51.

Yang, J (2013) An Empirical Study of Schedule Delay Causes Based on Taiwan‟s Litigation Cases. Project Management Journal 7(8).




DOI: http://dx.doi.org/10.61426/sjbcm.v7i3.1671

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.