Abstract


Monitoring and Evaluation (M&E) has turned into an irrefutably critical move in achieving regular, money related and social practicality. Monitoring and evaluation (M&E) help those involved with projects to assess if progress is being achieved in line with expectations or not so that reasonable measures can be taken in good time to ensure the project success. While the knowledge on monitoring and evaluation of projects exists, the administrative components of monitoring and evaluation seem to be lacking in the management of non-government organizations projects. The purpose of this study was to determine the effect of monitoring and evaluation on project goals achievement in non-governmental organizations in Rwanda: A case of Adventist Development and Relief Agency Rwanda. The study investigated the effect of policy, level of planning, resources and the process adequacy of the projects in Non-Governmental Organizations. The examination embraced a review research plan and the objective populace was 144 respondents dealing with different projects at Adventist Development and Relief Agency Rwanda. A sample size of 106 respondents was determined using Yamane's formula. The study used both essential and auxiliary information, where polls were utilized for information assortment. Cronbach's alpha test was used in evaluating dependability of examination instrument. Information gathered was prepared through SPSS. Data analysis involved statistical computations for averages, percentages, and correlation and regression analysis. Descriptive statistics and Correlation (using the Karl Pearson’s coefficient of correlation) was used to analyze the data and establish the relationship between the dependent variables and the set of independent variables. Thematic analysis was used in analysing qualitative data. The study also used simple regressions to analyze the data. From the regression equation, that holding M&E Planning, M&E Training, Baseline overview, Information framework to a consistent zero, project objectives in Non-Governmental Organizations in Rwanda would be at 0.315. A unit increment on M&E Planning would prompt expansion in project objectives in Non-Governmental Organizations in Rwanda by a factor of 0.750, a unit expansion in M&E Training would prompt expansion in project objectives in Non-Governmental Organizations in Rwanda by a factor of 0.311, a unit expansion in Baseline study would prompt expansion in project objectives in Non-Governmental Organizations in Rwanda by a factor of 0.546 and unit expansion in Information framework would prompt expansion in project objectives in Non-Governmental Organizations in Rwanda by a factor of 0.491. In conclusion, the review showed that observing and assessment impacts project execution and M&E plan ought to be set up if a positive impact of M&E must be seen. The study recommended that ADRA should ensure that there is adequate early planning for project M&E activities including human resources and involvement of all stakeholders in development and implementation of the M&E system. Also ADRA Coordination Board and the NGO Council should work with NGOs in developing a database of M&E systems information across the sector, where lessons learnt from previous experiences of other NGOs can be documented. Further, M&E should be carried out in full and efficiently to impact project execution. Taking into account that undertakings are carried out by foundations that have structures, it was therefore suggested that M&E unit ought to be important for an establishment.

Keywords: M&E Planning, M&E Training, Baseline survey, Information system, Project goal, Adventist Development and Relief Agency Rwanda

CITATION: Uwiringiyimana, E., & Gitahi, N. (2022). Effect of monitoring and evaluation on project goals in non-governmental organizations: case of school feeding project by Adventist Development and Relief Agency Rwanda. The Strategic Journal of Business & Change Management, 9 (4), 775 – 788.


Full Text:

PDF

References


Abdisalan, J. A. (2012). The Factors Influencing the Application of Participatory Monitoring and Evaluation in Community Based Projects: A Case of IDPs in Mogadishu Somalia. Nairobi: Unpublished Research Project Report, University of Nairobi.

Adek, R. T. (2016). Determinants of successful projects implementation of infrastructure projects in devolved units: a case study of Mombasa, Kenya. Nairobi: Unpublished project report, University of Nairobi.

Aden J. (2012). Participatory Monitoring and Evaluation of Community Projects. Community Based Project Monitoring, Qualitative Impact Assessment and People Friendly Evaluation Methods. Journal, August 2012 edition Vol.8.

Africa Development Bank (2016). “Country assistance evaluation, final report”, Operations Evaluation Department, February.

Agaba, E & Shipman, N. (2017). Public Procurement Reform in Developing Countries: The Ugandan xperience.

Ahsan, B., & Gunawan, D. (2010). Construction client multi-projects–A complex adaptive systems Perspective. International Journal of Project Management, 27(1), 72-79.

Ali I. A. (2012), Factors influencing sustainable funding of non-governmental organizations in Kenya: a case study of sister’s maternity home (simaho) in Garissa, University of Nairobi.

Alvi, M. (2016). A Manual for Selecting Sampling Techniques in Research. Karachi: University of Karachi, Iqra University.

Andersson, B., Jensen, R. I., Naitore, H., & Christoplos, I. (2014). Final Evaluation of the National Integrated Monitoring and Evaluation System (NIMES) capacity development project. Stockholm: Citat.

Aranda-Jan, C. B., Mohutsiwa-Dibe, N., & Loukanova, S. (2014). A systematic review on what Works, what does not work, and why of implementation of mobile health (mHealth) projects in Africa. BMC public health, 14(1), 1-15.

Armstrong, M., & Baron, A. (2013). Performance Management: The New Realities. Chartered Institute of Personnel and Development

Baumfield, V. S. (2016). Stakeholder Theory from a Management Perspective: Bridging the Shareholder/Stakeholder Divide. Australian Journal of Corporate Law, 1-23.

Brignall, S., & Modell, S. (2010). An Institutional Perspective on Performance Measurement and Management in the "New Public Sector”. Management Accounting Research, 11

Boyd, L., & Gupta, M. (2014). Constraints management: what is the theory? International Journal of Operations & Production Management, 24(4), 350-371.

Cassidy, C. and Ball, L. (2018). Communications monitoring, evaluating and learning toolkit. Overseas Development Institute, London.

Ceniga, P., & Šukalová, V. (2014). Application of the Theory of Constraints in Supply Chain. Applied Mechanics & Materials, 708.

Chikere, C. C., & Nwoka, J. (2015). The Systems Theory of Management in Modern Day Organizations - A Study of Aldgate Congress Resort Limited Port Harcourt. International Journal of Scientific and Research Publications, 1-7.

Chouinard, J. A. (2013). The Case for Participatory Evaluation in an Era of Accountability. American Journal of Evaluation, 34(2), 237-253

Chouinard, J. A., & Cousins, J. B. (2015). The journey from rhetoric to reality: Participatory Evaluation in a development context. Educational Assessment, Evaluation, and Accountability, 27(1), 5-39.

Clarke, A. (2011). A practical use of key success factors to improve the effectiveness of project Management. International Journal of Project Management, 17(3), 139 – 145.

Clear, R. (2013). Demand and Supply: Monitoring, Evaluation, and Performance management Information and services in Anglophone Sub-Saharan Africa. A Synthesis of Nine Studies: Washington DC, DC 20433. Retrieved from http://www.clearinitaitive.org/

Cooper, D. R., & Schindler, P. S. (2013). Business Research Methods. New Delhi, Mc Graw Hill Publishing Co. Ltd.

Crawford, P. & Bryce, P. (2013). Project Monitoring and Evaluation: A method of enhancing the Efficiency and effectiveness of aid project implementation. International Journal of Project Management, 21(5): 363 – 37319

Creswell, J. W. (2014). Research design: qualitative, quantitative, and mixed methods approach (4th ed.). California: Sage Publications, Inc.

Dave, A. (2014). Monitoring-and-Evaluation versus Feedback Loops. https://www.learningtheories.com/feedback-loops.html

Day, J. (2010). The need and practice of monitoring, evaluating and adapting marine planning and management—lessons from the Great Barrier Reef. Marine Policy, 32(5), 823-831.

Del Pico, W. J. (2013). Project Control: Integrating Cost and Schedule in Construction. John Wiley & Sons.

Dobi, B.A., Nyonje, R. and Wanjare, J. (2012), “Factors influencing adoption of monitoring and evaluation system for project management among NGOs in Rarieda District, Siaya county, Kenya”, master of arts degree in project planning and management thesis, University of Nairobi, Nairobi.

Erasmus, R. (2018). Monitoring and Evaluation For The Success Of Agricultural Donor Funded Projects: A Case Study of Rice Growing Project in Cogirira Cooperative in Bugesera District, Rwanda (Doctoral dissertation).

European Union. (2017). Introduction to Monitoring and Evaluation Using the Logical Framework Approach. European Commission and Civil Society in Ethiopia.

Fitzpatrick, J. L. (2012). An introduction to context and its role in evaluation practice. New Directions for Evaluation, 2012 (135), 7-24.

Garson, G. D. (2012). Testing statistical assumptions. North Carolina: Statistical Associates Publishing.

Gosling, Lousia, & Edwards, M. (2019). Toolkits: A Practical Guide to Assessment, Monitoring, Review and Evaluation. London: Save the Children.

Gupta, M. C., & Boyd, L. H. (2012). Theory of constraints: a theory for operations management. International Journal of Operations & Production Management, 28(10), 991-1012.

Gupta M.C., Sahi G.K. and Chahal H. (2013). Improving market orientation: the theory of Constraints-based framework. Journal of Strategic Marketing, 21(4), 305-322

Gyadu-Asiedu, W. (2013). “Towards a systemic construction industry development: a research agenda for a fragmented industry in Africa”, Journal of Construction Project Management and Innovation, Vol. 3 No. 2, pp. 680-696.

Gyorkos T. (2011). Monitoring and Evaluation of large-scale Helminth control programmes. Acta Tropic, 86(2),275 – 282.

Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2012). Multivariate Data Analysis (7 ed.).

Hazzi, O., & Maldaon, I. (2015). A pilot study: Vital methodological issues. Business: Theory and Practice, 16, 53.

Hwang, B. & Lim, E. (2013). Critical Success Factors for Key Project Players and Objectives: Case Study of Singapore. Project Management Journal, 40(4), 6-19.

Idoro, G. I. (2012). Influence of the monitoring and control strategies of indigenous and expatriate Nigerian contractors on project outcome. Journal of Construction in Developing Countries, 17(1), 2012.

Igobkwe, I. and Chibeaka, J., (2016). Issues and challenges in local government project: Monitoring and evaluation in Nigeria: the way forward, European Scientific Journal, Vol.8, No 18.

Jabeen, S. (2018). Unintended outcomes evaluation approach: A plausible way to evaluate Unintended outcomes of social development programmes. Evaluation and Program Planning, 262-274.

Jayamaha, A. and Silva, L.M.D. (2012), “Budgetary process and organizational performance of Apparel industry in Sri Lanka”. Journal of Emerging Trends in Economics and Management Sciences, Vol. 3 No. 4, pp. 354-360

Jones, A. (2011). A guide to Monitoring and evaluating policy influence.

Jooste, G. (2010). Stakeholder engagement and business performance for selected SMEs in Gauteng. Doctoral dissertation. North-West University.

Kabeyi, M. J. B. (2019). Evolution of project management, monitoring, and evaluation, with historical events and projects that have shaped the development of project management as a profession. Int J Sci Res, 8(12), 63-79.

Kabonga, I. (2020). The contribution of volunteerism to monitoring and evaluation of NGO Projects in Chegutu district, Zimbabwe. Cogent Social Sciences, 6(1), 1752590.

Kairu, K. M. (2015). Role of strategic inventory management on performance of manufacturing firms in Kenya: A case of Diversey Eastern and Central Africa Limited. International Academic Journal of Procurement and Supply Chain Management, 1(4), 22-44.

Karanja, G. (2014). Influence of Management Practices on Sustainability of Youth Income Generating Projects in Kangema District, Muranga County, Kenya. International Journal of Education and Research, Vol 2, 1-12

Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.

Khan, D. B. (2013). Measuring Project Success in the Construction Industry. Electronic Journal of Business Research Methods, 6(1), 43-52

Khang, D. B., & Moe, T. L. (2011). Success criteria and factors for international development projects: A life‐cycle‐based framework. Project Management Journal, 39(1), 72-84.

Kinda, O. (2012). The monitoring and Evaluation System of the millennium villages project: Close Look at the Mid- term Evaluation Report. Journal of Sustainable Development.

King, J. A. (2010). Response to Evaluation Field Building in South Asia: Reflections, Anecdotes, and Questions. American Journal of Evaluation, 31(2), 232-237.

Kissi, E., Kofi. A., Bernard, B., Reuben A., Effah G. & Tweneboah A. (2019) "Impact of project monitoring and evaluation practices on construction project success criteria in Ghana", Built Environment Project and Asset Management.

Kothari, C. R., & Garg, G. (2014). Research Methodology: Methods and Techniques (3 ed.). New Delhi: New Age International (P) Ltd.

Kusek, J. Z., & Rist, R. C. (2012). Building results-based monitoring and evaluation systems: Assessing developing countries readiness. Zeitschriftfuer Evaluation, 1, 151-158.

Kyriakopoulos, G. L. (2011). Project Management (PM) Prosperity: A Second Half of the 20th Century Literature Review. Journal of Management and Sustainability, 1 (1), 64-81.

Lahey, R. (2015). Common issues affecting monitoring and evaluation of large ILO projects: Strategies to address them. ieval THINK Piece (9)

Louisa, G. (2010). Monitoring and evaluation. How to Guide. Bond for International Development

Management Agency. (2013). Ethiopian Protection of basic services social accountability program, monitoring and evaluation manual for grantees. Addis Ababa: unpublished.

Marra, M. (2018). The ambiguities of performance-based governance reforms in Italy: Reviving the fortunes of evaluation and performance measurement. Evaluation and program planning, 69, 173-182.

Mbiti, V. M., & Kiruja, D. E. (2015). Role of Monitoring and Evaluation on Performance of Public Organization Projects in Kenya: A Case of Kenya Meat Commission. International Journal of Innovative Development & Policy Studies.

Mugenda, O. M., & Mugenda, A. G. (2014). Research Methods Dictionary. Nairobi: Applied Research & Training Services.

Mwangu A. W., & Iravo M. A. (2015). How Monitoring and Evaluation Affects the Outcome of Constituency Development Fund Projects in Kenya: A Case Study of Projects in Gatanga Constituency. International Journal of Academic Research in Business and Social Sciences. 5(3), 13 – 31

Ngatia, N. P. (2015). Influence of Monitoring and Evaluation Systems Use on Performance of Non-governmental Organizations: A Case of Agribusiness Projects in Murang’a County, Kenya. Master's Thesis

Nyakundi, N. N. (2015). Influence of project Management Processes on Outcomes: Case of Public Sector Infrastructure Projects at Telkom Kenya Limited

Ober, H. T. (2012). Project monitoring and evaluation: a method for enhancing the efficiency and effectiveness of aid project implementation. International Journal of Project Management, 21, 363–373.

Naidoo, I.A. (2011). “The role of monitoring and evaluation in promoting good governance in South Africa: a case study of the department of social development”, University of Witwatersrand: WIReDSpace, Johannesburg.

Nyonje, R.O., Ndunge, K.D. and Mulwa, A.S. (2012), Monitoring and Evaluation of Projects and Programs - A Handbook for Students and Practitioners, Aura Publishers, Nairobi.

Phiri, B. (2015). “Influence of monitoring and evaluation on project performance”, master’s thesis, University of Nairobi, Nairobi.

Porter, S. & Goldman, I. (2013). A growing demand for Monitoring and Evaluation in Africa. African Evaluation journal. 1 (1) 1-9

Project Management Institute (2010). A Guide to the Project Management Body of Knowledge (PMBOK), 4th ed., Project Management Institute.

Qaisar, Ab. & Javid, I. (2012). Internal Control System as mechanisms of M&E: Analysing Theoretical Perspective and Practices. Middle-East Journal of Scientific Research, 12 (4), pp 530-538.

Ramadan, M. A., & Borgonovi, E. (2015). Performance Measurement and Management in Non-Governmental Organizations. IOSR Journal of Business and Management (IOSR-JBM), 70-76.

Rogito. O.D. (2016). Influence of Monitoring and Evaluation on Projects Performance Case of Youth Enterprise Development Fund in Marani District, Kenya School of continuing and Distance Education. University of Nairobi.

Sandrine, U. (2018). Monitoring and Evaluation Mechanisms and Performance of Government Projects in Rwanda. A Case Study of Skill Development Project (Doctoral dissertation).

Save the Children. (2016). Baseline and evaluation design and management. Monitoring, Evaluation, Accountability and Learning (MEAL).

Sekaran, U., & Bougie, R. (2011). Research Methods for Business: A Skill Building Approach (5 ed.). Aggarwal Printing Press.

Sekaran, U., & Bougie, R. (2016). Research methods for business: A skill building approach. John Wiley & Sons.

Sethi, R., &Philippines, R. (2012). The influence of project managers on project success criteria and project success by type of project. European Management Journal, 25(4), 298-309.

Shapiro J. (2011). Monitoring and evaluation. CIVICUS.

Shenhar, A. J. (2011). An empirical analysis of the relationship between project planning and project success. International Journal of Project Management, 21(20), 89-95

Simon, R. (2014). A framework for evaluating the government contracting-out decision with an application to information technology. Public administration review, 577- 586

Sproull, B. (2012). The ultimate improvement cycle: maximizing profits through the integration of lean, six sigmas, and the theory of constraints. New York: CRC Press.

Stetson, V. (2011). Monitoring and Evaluation (M&E) Guide. Baltimore.

Tarsilla, M. (2012). From building evaluation capacity to sustaining evaluation capacity development: The cases of Democratic Republic of Congo, Niger, and South Africa (Unpublished doctoral dissertation). Western Michigan University, Michigan.

Tulema, W. H. (2014). Monitoring and evaluation practices and challenges of local in Ethiopia. Master’s Thesis, 81-84.

UNDP. (2019). Handbook on Planning Monitoring and Evaluating for Development Results. New York, USA: United Nations Development Program

Valente, C.P., Novaes, M., Mourão, C.A. and Neto, J. (2012), “Lean monitoring and evaluation in a construction site: a proposal of lean audits”, Annual Conference of the International Group for Lean Construction, Vol. 20, San Diego, CA.

Wanjala, P. (2016). The Impact of School Feeding Programme on Primary Day School Attendance in Turkana Central Division, Central District, Turkana County. Nairobi: The University Of Nairobi.

Wanjiku, S. M. (2015). Monitoring and Evaluation Factors Influencing the Performance of Road Infrastructural Projects: A Case Study of Nyandarua County, Kenya.

Were, V. L. (2014). The Nexus of Nongovernmental Organization Water Projects, Monitoring and Evaluation, and Kenya’s Water Law. Dissertation

Wong. (2012). Towards Building performance-Oriented management in China: The critical role of monitoring and evaluation in the long road ahead. Evaluation Capacity Development. Washington DC: The World Bank Group.

Zvoushe, H. & Gideon, Z. (2013).The utilization of Monitoring and Evaluation Systems by Development Agencies: The Case of the UNDP in Zimbabwe. American International Journal of Contemporary Research, Vo.3(3), PP.70 - 83.




DOI: http://dx.doi.org/10.61426/sjbcm.v9i4.2448

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.