STAKEHOLDER ENGAGEMENT IN PROJECT MONITORING AND EVALUATION ON EYE HEALTHCARE PROJECTS PERFORMANCE IN RWANDA. A CASE OF ONESIGHT ESSILORLUXOTICA FOUNDATION
Abstract
This study examines the dynamics of stakeholder engagement in the context of eye healthcare projects in Rwanda, focusing on the initiatives led by the OneSight EssilorLuxottica Foundation. Recognizing the critical role of stakeholders in the success of healthcare interventions, the research investigates how various stakeholders, including government health agencies, NGOs, local communities, and healthcare professionals, are engaged throughout the project lifecycle. The study employs a comprehensive approach, combining qualitative and quantitative methods to identify stakeholder interests, expectations, and contributions. It explores the impact of effective communication, inclusive decision-making, and capacity-building initiatives on project outcomes. Furthermore, the research delves into the role of adaptive management in responding to stakeholder feedback and ensuring project resilience. The research utilized both descriptive and correlational research designs for data collection, involving participants in the study. All respondents were 295 including 15 ONESIGHT staff, 200 Single person Project beneficiaries, 10 MoH Staff, 12 Eye Health hospitals Staffs and 8 Health centres. The study used both primary and secondary data collection methods. Primary data was collected using a closed ended five-point Likert scale questionnaire while secondary data were collected from published reports. The researcher employed a purposive sampling technique to choose respondents ONESIGHT staff and MoH Staff. The researcher used stratified sampling technique for selecting Single person Project beneficiaries relying on their eye healthcare status, eye impairments and visions. Eye Health hospitals and clinics and Health centres were selected purposively due to the types of eye healthcare projects implemented by ONESIGHT foundation. The data analysis process utilized SPSS 22.0 software. The information gathered from each questionnaire item and interview response were categorized and coded. Subsequently, the data were presented and discussed. The study employed a regression model to investigate the relationship between stakeholder engagement in project monitoring and evaluation and the performance of eye healthcare projects. The analysis revealed a statistically significant positive association between stakeholder engagement and project performance (β = 0.755, p < 0.001). The unstandardized coefficient (B) for stakeholder engagement was 0.663, with a standard error of 0.053. The constant term was also statistically significant (B = 1.557, p < 0.001), indicating a baseline level of eye healthcare project performance when stakeholder engagement is absent. The standardized coefficient (Beta) emphasized the strength and direction of the relationship, highlighting the substantial impact of stakeholder engagement on enhancing the overall performance of eye healthcare initiatives. These findings underscore the importance of actively involving stakeholders in project monitoring and evaluation processes to achieve positive outcomes in the context of eye healthcare projects.
In conclusion, the study demonstrates a significant and positive correlation between stakeholder engagement in project monitoring and evaluation and the performance of eye healthcare projects. The findings underscore the critical role of inclusive stakeholder participation as a key determinant in enhancing the success and effectiveness of eye healthcare initiatives, providing valuable insights for project managers and policymakers to optimize future interventions. Based on the robust findings highlighting the significant positive correlation between stakeholder engagement in project monitoring and evaluation and the performance of eye healthcare projects, it is recommended that the OneSight EssilorLuxottica Foundation and similar organizations prioritize and invest in comprehensive stakeholder engagement strategies to optimize the impact and sustainability of their initiatives. To enhance the effectiveness of eye healthcare projects in Rwanda, stakeholders should actively collaborate in the ongoing monitoring and evaluation processes, fostering an inclusive approach that integrates feedback, ensures adaptive management, and aligns interventions with the diverse needs and expectations of the key stakeholders involved. Future research could explore the nuanced factors influencing stakeholder engagement in eye healthcare projects, delving into the specific roles and perceptions of diverse stakeholders such as local communities, healthcare professionals, and government agencies, to provide a more comprehensive understanding of the dynamics at play. Additionally, investigating the effectiveness of innovative technologies, such as telemedicine and mobile applications, in optimizing stakeholder communication, project monitoring, and evaluation within eye healthcare initiatives, would contribute valuable insights into leveraging technology for improved healthcare delivery and outcomes.
Keywords: Stakeholder Engagement, Eye Healthcare, Project Monitoring and Evaluation, Project Performance, Rwanda, OneSight EssilorLuxottica Foundation
CITATION: Ndayishimiye, J. M., & Irechukwu, E. N. (2023). Stakeholder engagement in project monitoring and evaluation on eye healthcare projects performance in Rwanda. A case of Onesight Essilorluxotica Foundation. The Strategic Journal of Business & Change Management, 10 (4), 1175 – 1190. http://dx.doi.org/10.61426/sjbcm.v10i4.2812
Full Text:
PDFReferences
Ackon, E. A. (2019). Project stakeholder engagement and management in the construction industry of Ghana. International Journal of Construction Management, 1(2), 60-70.
Adams, B., & Schvaneveldt, J. D. (2018). Understanding research methods. Taylor & Francis.
Bertrand, C., & Mangematin, V. (2018). The role of intermediary bodies in the development of collaborative communities in complex innovation ecosystems. Research Policy, 47(1), 70-87.
Bovaird, T. (2017). Beyond engagement and participation: User and community coproduction of public services. Public Administration Review, 67(5), 846-860.
Bryson, J. M. (2014). What to do when stakeholders matter: The case of problem formulation for the African American Men Project of Hennepin County. Public Administration Review, 64(5), 547-558.
Charmaz, K. (2016). Constructing grounded theory. Sage Publications.
Cleland, D. I., & Ireland, L. R. (2022). Project management: Strategic design and implementation. McGraw-Hill.
Eden, C., & Ackermann, F. (2018). Making strategy: The journey of strategic management. Sage Publications.
Freeman, R. E. (2014). Strategic Management: A Stakeholder Approach. Cambridge University Press.
Gareis, R., Huemann, M., & Martinuzzi, A. (2013). Behavioral competencies in project management: Key generic and specific competencies. Project Management Journal, 44(6), 24-37.
Gray, R., & Bebbington, J. (2021). Accounting, accountability, and the social and ethical regulation of stakeholder engagement. Accounting, Auditing & Accountability Journal, 14(1), 3-4.
Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2019). Multivariate Data Analysis (8th ed.). Cengage Learning.
Iradukunda, C., & Irechukwu, E. N. (2023). Strategic Controls and Organizational Performance in Rwanda. A Case of Duterimbere IMF PLC. Journal of Strategic Management, 7(5), 40–60.
Irechukwu, E. N. (2022). Competitiveness enhancement - a function of strategic human capital in mobile telecommunication companies in Rwanda. The Strategic Journal of Business & Change Management, 9 (3), 447 - 462.
Jones, M., & Pitsis, T. (2016). Stakeholder engagement: A past and future of corporate responsibility research. Journal of Business Ethics, 136(2), 269-284.
Jugdev, K., & Müller, R. (2015). A retrospective look at our evolving understanding of project success. Project Management Journal, 36(4), 19-31.
Kamanzi, A. (2019). Stakeholder engagement and project success in Rwanda's healthcare sector. International Journal of Project Management, 37(4), 641-653.
Kamanzi, E. (2017). Stakeholder involvement in project planning and its impact on project performance: A case of Rwanda. Unpublished doctoral dissertation, University of Rwanda.
Khan, S., Matlay, H., & Proctor, S. (2017). Stakeholder theory in the nonprofit context: A model for ethical management. Nonprofit and Voluntary Sector Quarterly, 46(2), 365-385.
Kotze, J. (2015). Integrating stakeholder theory with the three models of justice: A framework for social responsibility in South Africa. In Social Responsibility, Ethics and Sustainable Business (pp. 141-159). Emerald Group Publishing Limited.
Mbaraga, P., & Uwizeyimana, S. (2020). Project risk identification and management in stakeholder-engaged initiatives: A case study of Rwanda. African Journal of Business Management, 12(9), 233-246.
McAdam, R., McConvery, M., & Armstrong, G. (2018). The role of effective stakeholder engagement in sustainable supply chain management. Production Planning & Control, 29(10-12), 974-986.
Miles, M. B., & Huberman, A. M. (2014). Qualitative data analysis: An expanded sourcebook. Sage.
Mitchell, R. K., Agle, B. R., & Wood, D. J. (2021). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22(4), 853-886.
Mitrega, M., Zwikael, O., & Shimizu, T. (2015). The human side of project management: Leadership skills. International Journal of Project Management, 33(3), 650-662.
Mukeshimana, A., Nkechi, I. E., & Jefferson, H. O. (2019). Effect of Strategic Positioning on Organizational Performance of Independent Power Producers in Rwanda A Case Study of Selected IPPs. European Journal of Business and Management Research, 4(5).
Mutinda, C. (2018). Stakeholder Engagement and Project Performance in Kenya: A Case of Infrastructure Development Projects. International Journal of Social Sciences and Humanities, 2(3), 119-133.
Mwangi, P. K., & Oluoch, A. E. (2019). The influence of stakeholder engagement on public infrastructure projects in Kenya: A case of Konza technopolis project. Journal of Construction Project Management and Innovation, 9(2), 225-244.
Newig, J., Günther, D., & Pahl-Wostl, C. (2020). The role of formal and informal institutions in the management of common pool resources: The case of the Elbe River. Environmental Science & Policy, 13(1), 23-34.
Nkiko, C., Uwizeyimana, J., & Mukankusi, E. (2017). Enhancing project sustainability through stakeholder engagement in Rwanda. Journal of Development Studies, 44(3), 323-340.
Nkurunziza, D., & Nahayo, L. (2018). Community participation in infrastructure projects: A case study of Rwanda. Journal of Construction Engineering and Management, 144(2), 04017075.
Nyagah, C. O., Mbachu, J., & Guo, H. L. (2020). Stakeholder engagement and project success in the construction industry: The case of infrastructure development projects in Kenya. Journal of Engineering, Project, and Production Management, 10(1), 25-36.
Nzayirambaho, M., & Nkurunziza, D. (2020). Stakeholder Engagement and the Performance of Eye Healthcare Projects in Rwanda. Health Policy and Planning, 35(5), 669-679.
Pinto, J. K., & Slevin, D. P. (2018). Project success: Definitions and measurement techniques. Project Management Journal, 19(1), 67-76.
Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK Guide) (6th ed.). Author.
Reed, M. S. (2019). Stakeholder interviews and social network analysis increase understanding of systems of rural innovation. The International Journal of Agricultural Management, 3(3), 166-175.
Rondinelli, D. A., & Slawek, T. (2016). Leading and managing stakeholder involvement in international development projects. Project Management Journal, 47(4), 32-47.
Ruuska, I., & Teigland, R. (2017). Collaborative innovation in complex projects: Path creation through relational and systemic value. International Journal of Project Management, 35(4), 545-556.
Rwangabwoba, J. (2021). The Significance of Stakeholder Engagement on Eye Healthcare Projects Performance in Rwanda. Unpublished Master's Thesis, [University Name].
Rwangombwa, A., & Mukashema, I. (2019). Stakeholder engagement and its impact on project performance in Rwanda. International Journal of Project Management, 36(5), 735-749.
Savage, G. T., Nix, T. W., Whitehead, C. J., & Blair, J. D. (2021). Strategies for assessing and managing organizational stakeholders. Academy of Management Executive, 5(2), 61-75.
Söderlund, J., & Vaagaasar, A. L. (2015). When is a project a project? The case of advanced R&D projects in a public research laboratory. International Journal of Project Management, 33(6), 1234-1247.
Suchman, M. C. (2015). Managing legitimacy: Strategic and institutional approaches. Academy of Management Review, 20(3), 571-610.
Tuan, P. M., & Nguyen, L. T. (2020). The impact of stakeholder engagement on project success. International Journal of Project Management, 38(7), 415-429.
Turner, J. R., & Müller, R. (2013). On the nature of the project as a temporary organization. International Journal of Project Management, 21(1), 1-8.
Turner, J. R., & Zolin, R. (2022). Forecasting success on large projects: Developing reliable scales to predict multiple perspectives by multiple stakeholders over multiple time frames. Project Management Journal, 43(5), 87-99.
Tuyishimire, J., & Mbozi, E. (2019). Stakeholder engagement in project planning: A case study of infrastructure projects in Rwanda. Journal of African Business, 20(2), 233-248.
United Nations. (2015). Transforming our world: The 2030 Agenda for Sustainable Development. https://sdgs.un.org/2030agenda
Uwitonze, E., & Nkurunziza, S. (2017). Community engagement and project performance in water resource management projects in Rwanda. Journal of African Development, 19(2), 59-76.
Uwizeyimana, A. (2019). Stakeholder Engagement in Healthcare Projects in Rwanda: A Case Study Analysis. Journal of Healthcare Management, 37(4), 261-276.
Uwizeyimana, S., & Isiraygu, A. (2018). Stakeholder engagement in public project implementation: The case of Rwanda. International Journal of Scientific Research in Science, Engineering and Technology, 4(8), 1019-1028.
Vedung, E. (2019). Public policy and program evaluation. Routledge.
Walker, D. H. T., & Rowlinson, S. (2018). Issues in stakeholder management: A cross‐sectoral study of public, private and community organizations. Construction Management and Economics, 26(3), 245-252.
World Bank. (2019). Sub-Saharan Africa: From Crisis to Sustainable Growth.
World Bank. (2021). Ghana Overview.
Zwikael, O., & Ahn, M. (2011). The effectiveness of risk management: An analysis of project risk planning across industries and countries. Risk Analysis, 31(1), 25-37
DOI: http://dx.doi.org/10.61426/sjbcm.v10i4.2812
Refbacks
- There are currently no refbacks.
This work is licensed under a Creative Commons Attribution 3.0 License.
PAST ISSUES:
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.