DETERMINANTS OF IMPLEMENTATION OF OUTSOURCING PRACTICES AMONG MANUFACTURING FIRMS IN NAIROBI CITY COUNTY, KENYA

LILIAN GESARE ONTWEKA

Abstract


The purpose of the study is to establish the determinants of implementation of outsourcing practices among manufacturing firms in Kenya. The study sough to be guided by the following specific objectives: To examine how procurement planning influence implementation of outsourcing practices among manufacturing firms in Kenya and to establish how supplier partnership influence implementation of outsourcing practices among manufacturing firms in Kenya. A pilot study was conducted to pretest the validity and reliability of instruments for data collection. Before analyzing the data, responses was edited, coded, entered to SPSS (Version 22) and data cleaned. Quantitative data was analyzed using descriptive statistics and presented through percentages, means, standard deviations and frequencies. The qualitative data was analyzed by use thematic analysis. It was notable that there extisted a strong positive relationship between the indepedent variables and depedent variable. The variables were very significant therefore need to be considered in any effort to improve implementation of outsourcing practices in manufacturing firms in the study area. The study contributes the body of knowledge by examining the determinants of implementation of outsourcing practices in manufacturing firms in Kenya. The implementation of outsourcing practices in manufacturing firms was greatly affected by procurement planning and supplier partnership. The study contributed to the existing literature in the field of procurement by elaborating exiting theories, models and empirical studies on implementation of outsourcing practices in manufacturing firms. The current study should therefore be expanded further in future in order to determine the effect of legal framework, supplier payment, supplier training on procurement performance in manufacturing firms. Existing literature indicated that as a future avenue of research, there was need to undertake similar research in other manufacturing firms in Kenya and other countries in order to establish whether the explored factors can be generalized to affect implementation of outsourcing practices in manufacturing firms.

Key Words: Procurement Planning, Supplier Partnering, Outsourcing, Manufacturing Industries


Full Text:

PDF

References


Adan, I. H. (2012). Influence of stakeholders role on performance of constituencies development fund manufacturing firmss a case of Isiolo North Constituency, Kenya. Available at: http://researchkenya.or.ke/node/18866

Ahmed S, Azher S, Castillo M, Kappagantula, P. (2012) Construction Delays in Florida; An Empirical Study, Florida.

Aiyetan, O.A., Smallwood, J.J. & Shakantu, W. (2008). Influences on construction manufacturing firms delivery time performance. In the proceeding of Third Built Environment conference, Cape Town, South Africa

Al-Kharashi, A. & Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction manufacturing firmss. Construction Management and Economics, 27(1), 3-23.

Ardity, D., Akan, T., & Gurdamar, S. (2009). Adherence to cost estimates in public manufacturing firmss: International Journal of Manufacturing firms Management.

Babbie, E. (2009). Survey research methods (2nd ed.). Belmont: Wodsworth.

Barney, J. (1986). Strategic factor markets: Expectations, luck, and business strategy. Management Science, 32, 1231-1241.

Battaineh R.K (2006) ‘Causes of Delay in Large Building Construction Manufacturing firmss’, Journal of Management in Engineering, Vol. 11, No. 2.

Binder, (2008). User Satisfaction and Sustainability of Drinking Water Schemes in Rural Communities of Nepal.

Bridget, S., and Lewin, C. (2005). Research Methods in the Social Sciences. London: Sage publications

Bordens, K. S., and Abbott, B.B. (2008). Research design methods: A process approaches (7th ed.). New York, NY: McGraw-Hill.

Burke, R. (2004). Manufacturing firms Management Planning and Control Techniques. 4th edition, New Delhi India: Pearson Education.

Callahan, M. T., D. G. Quackenbush, and J. E. Rowings, (2006). “Construction Manufacturing firms scheduling”. USA: McGraw-Hill.

Chandran C. (2004). Research Methods: A qualitative Approach with Illustrations from Christian Ministries. Nairobi: Daystar University.

Chan, M., & Kumaraswamy, M. (2007). A comparative study of causes of time overruns in Hong Kong construction manufacturing firmss. International Journal of Manufacturing firms Management 15(1), pp. 55-63.

Chan, M., Scott, D. & Chan, L. (2004). Factors affecting the success of a construction manufacturing firms: Journal of Construction Engineering and Management 130 pp. 153.

Conner, K.R. (1991). A historical comparison of resource-based theory and five schools of thought within the industrial organization economics: Do we have a new theory of the firm? Journal of Management, 17, 121-154.

Cooper D R, Schindler PS (2005). Business Research Methods. (8th ed.). Mc Graw-Hill, New Delhi, India.

Creswell, J. W. (2003).Research design: Quantitative, qualitative, and mixed methods approaches (2nd Ed.). Thousand Oaks, CA: Sage.

Creswell, J. W., (2002). Educational research: Planning, conducting, and evaluating quantitative and qualitative approaches to research. New Jersey: Merrill/Pearson Education.

Cronbach, L. J. (1971). Test validation. In R. L. Thorndike (Ed.). Educational Measurement (2nd Ed.). Washington, D. C.: American Council on Education

Damodaran, L. (2011). User involvement in the systems design process: a practical guide for users, Behaviour & Information Technology, 15(6), 363-377

Ektewan, M. & Ogunlana, S.O. (2006). Public hearings in Thailand's infrastructure manufacturing firmss: effective participations?, Engineering, Construction and Architectural Management, 13(4), 343 – 363

Flyvbjerg, B. (2005), Policy and Planning of Large Infrastructure Manufacturing firms Problems, Causes, Cures. World Bank Policy Research Working Paper 3781, Cambridge University Press, Cambridge.

Flyvbjerg, B., Holm, S., & Buhl, L. (2004). What Causes Cost Overrun in Transport Infrastructure Manufacturing firmss?: Transport Reviews, 24 (1), 3-18.

Fudge, N. & Wolfe, C.D.A. (2008). Assessing the promise of user involvement in health service development: ethnographic study. BMJ, 336, 313

Ghazala, M. & Vijayendra R. (2011) Evaluating Community Based and Community Driven Development: A critical review of the Evidence. Working Paper, Development research Group, World Bank.

Goldratt, Eli M.. (1984). Essays on the Theory of Constraints. [Great Barrington, MA]: North River Press. ISBN 0-88427-159-5.

Hamel, G., & Prahalad, C.K. (1996). Competing for the Future. Boston: Harvard Business School Press.

Kvaye, M., & Anderson, R. (2000). Continuous improvement: The ten essential criteria.The International Journal of Quality & Reliability Management, 16(5), 485.

Kagiri, D., & Wainaina, G. (2009). Time and Cost Overruns in Power Manufacturing firmss in Kenya: A Case Study of Kenya Electricity Generating Company Limited, Nairobi. (2004). Solving Tough Problems: An Open Way of Talking, Listening, and Creating New Realities. Berrett-Koehler Publishers.

Kaliba, C. Muya, M. & Mumba, K. (2009), Cost Escalation and Schedule Delaying Building Construction Manufacturing firmss in Zambia, International Journal of Manufacturing firms Management, Vol. 27, Issue 5, pp 522-531.

Karimi, R.B.(2008), “Factors which are Critical in Manufacturing firms Cost Overruns: A Case Study of Ministry of Water Resources Manufacturing firmss”, Unpublished MBA Thesis, University of Nairobi.

Kog, C., & Loh, K. (2012). Critical Success Factors for Different Components of Construction Manufacturing firmss. Journal of Construction Engineering and Management 138(4), pp. 520-528.

Koskela, Howell ., & Ballard, G. (2002). Should manufacturing firms management be based on theories of economics or production?: Building Research and Information, Vol. 34, No. 2

Kothari, C. R. (2004). Research methodology: Methods and techniques. New Delhi: New Age International (P) Limited Publishers.

Kuen, C.W., Zailani, S., & Fernando, Y. (2009). Critical factors influencing the manufacturing firms success amongst manufacturing companies in Malaysia. African Journal of Business management, 3(1), 16-27.

Kumar, C. (2000). Research Methods.(2ndedn.). New York: Harper and Row.

Lin-lin, X., Yang, Y. Hu, Y. & Chan, A.P.C. (2014). Understanding manufacturing firms stakeholders’ perceptions of public participation in China's infrastructure and construction manufacturing firmss: Social effects, benefits, forms, and barriers", Engineering, Construction and Architectural Management, 21(2), 224 – 240

Maina, B. M. (2013). Influence of stakeholders’ participation on the success of the economic stimulus programme: a case of education manufacturing firmss in Nakuru County, Kenya. Retrievedfrom

Maltz, A.C., Shenhar, A.J. & Reilly, R.R. (2003). Beyond the balanced scorecard: Refining the search for organizational success measures, Long Range Planning, Vol. 36, No. 2,pp.187-204.

Malkat, M & Byung-Gyoo, K. (2012). An Investigation on the Stakeholders of Construction Manufacturing firmss in Dubai and Adjacent Regions. Available at: www.ipedr.com/vol45/016-ICMTS2012-M00008.pdf‎

Marchewka, J.T. (2006). Information Technology Manufacturing firms Management: Providing Measurable Organizational Value, 2nd ed., Wiley, New York, NY.

McGrew, J.F., Bilotta, J.G. (2007) The effectiveness of risk management: measuring what did not happen, Manage Decision, 38(4) 293-300.

Mono, O.R. (2013).Determinants of successful delivery of housing construction Manufacturing firmss in the Ministry of Housing in Nairobi, Kenya. Retrieved from: http://ir-library.ku.ac.ke/handle/123456789/6213

Morris, G., & Hough, H. (2008). The Anatomy of Major Manufacturing firmss: A Study of the Reality of Manufacturing firms Management. Chichester; New York: Wiley, pp. 502-511.

Mugenda, O.M and Mugenda, A.G (2003) Research Methods, Quantitative & Qualitative Approaches. Acts Press: Nairobi

Müller, R., & Jugdev, K. (2012). Critical success factors in manufacturing firmss Pinto, Slevin, and Prescott – the elucidation of manufacturing firms success. International Journal of Managing Manufacturing firmss In Business, 5(4), 757-775.

Musa, G. H., (2009)“Determination of Factors Influencing Manufacturing firmss Delays in Water Manufacturing firmss in Kenya: The Case of Government Funded Manufacturing firmss”, Unpublished MBA Thesis University Of Nairobi.

Mwandali, D., (2006) “Analysis of Major Factors that Affect Manufacturing firmss Management: A Case of Kenya Railways Manufacturing firmss”, Unpublished MBA Thesis, University of Nairobi.

Nana Agyeman (2010), Delays in building construction manufacturing firmss in Ghana.

Nyandika Fred(2014); Influence of stakeholders' participation on performance of road manufacturing firmss at Kenya National Highways Authority ; A Research Manufacturing firms Submitted in Partial fulfillment for the award of degree of master of science in manufacturing firms management of Jomo Kenyatta University of Agriculture and Technology

National Tax Payers Association (2010), Utilization of Government Revenue: Government Printers, Nairobi

Neuman, W.L. 2006. Social Research Methods: Qualitative and Quantitative Approaches. Pearsons Education Inc. Boston. USA

Nunnally, J. C. (1978). Psychometric theory (2nd ed.). New York: McGraw-Hill.

O’Brien, S., & Ibbs, C. (2005). The Paradox of using Tacit and Explicit Knowledge Strategies to face Dilemmas: Management Decision, Vol. 43 No. 1, pp. 102-112.

Olawale, A., & Sun, M. (2010). Cost and Time Control of Construction Manufacturing firmss: Inhibiting Factors and Mitigating Measures in Practice. Construction Management and Economics 28(5), pp. 509-526.

Olima,H.A. (2011). The Dynamics and Implications of Sustaining Urban Spatial Segregation in Kenya: Experiences from Nairobi Metropolis. Paper presented at the International Seminar on Segregation in the City Held at Lincoln Institute of Land Policy in Cambridge, MA, USA, July 25-28, 2001.

Onchoke, N. K. (2013). Factors influencing performance of community development manufacturing firmss in Kenya: a case of Kisii Central District. Available at: http://ir-library.ku.ac.ke/handle/123456789/6205

Ondieki, W. M. (2011). Factors influencing stakeholders' participation in monitoring and evaluation of Local Authority transfer fund manufacturing firmss in Kisii municipality, Kenya. Available at http://erepository.uonbi.ac.ke:8080/handle/123456789/3906

Onions, W. (2007). A Knowledge Based Theory of Manufacturing firms Management: McGraw-Hill, pp 61-72.

Ophiyandri, T., Amaratunga, D., Pathirage, C. & Keraminiyage, K. (2013). Critical success factors for community-based post-disaster housing reconstruction manufacturing firmss in the pre-construction stage in Indonesia, International Journal of Disaster Resilience in the Built Environment, 4(2), 236 – 24

Republic of Kenya.(2014). Kenya National Bureau of Statistics.Economic Survey 2014.Nairobi: Government Printer.

Rundquist, J. (2008) World Class or Good Enough: the Choice of partner when Outsourcing New Product Development in medium sized firms. International Journal of Innovation and Technology Management 5: 429‐451.

Sambasivan M. and Yau W.S., (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Manufacturing firms Management 25: pp. 517 -526.

Sauer, C. & Reich, H. (2007). What do we want from a Theory of Manufacturing firms Management?: International Journal of Manufacturing firms Management, A response to Rodney Turner”, Guest editorial, Vol.25, pp 1-2.

Saunders, M., Lewis, P., &Thornhill, A. (2007).Research Methods for Business Students.(4thedn.). Harlow: Financial Times Prentice Hall.

Schumpeter, J.A. (1950). American Institutions and Economic Progress.New York: Harper & Brothers.

Sekaran, U. (2003). Research Methods for Business: A Skill Building Approach. (4thedn.). USA: John Wiley & Sons Publishers.

Seboru, M. A. (2006). An investigation into factors causing delays in road construction manufacturing firmss in Kenya, unpublished MA Manufacturing firms, Faculty of Architecture, design and Development, University of Nairobi

Serdar S. Durmusoglu, (2009). The role of top management team's information technology (IT) infrastructure view on new product development: Conceptualizing IT infrastructure capability as a mediator. European Journal of Innovation Management, 12(3), 364 – 385

Tabish, S., & Jha, K. (2012). Success Traits for a Construction Manufacturing firms. Journal of Construction Engineering & Management,138(10), 1131-1138.

Talukhaba, A.A, (2008). “Time and Cost Performance of Construction Manufacturing firmss”, Unpublished M.A. Thesis, University of Nairobi.

Turner, R. ( ). Towards a Theory of Manufacturing firms Management: The Nature of the Manufacturing firms: International Journal of Manufacturing firms Management, Vol 24, p.1-3.

Wouldiams,T. (2008), "A review of inventory management research in major logistics journals: themes and future directions", International Journal of Logistics Management, Vol. 19 No.2, pp.212-32.

Yin, R. K., (2003), Case Study Research: Design and Methods, (3rd edition). Sage Publications, London

Young, N. (2009). Understanding the Research Process and Methods. An Introduction to Research Methods. Las Vegas: Acts Press.

Zhang, Z.H. (2000). Implementation of Total Quality Management: An Empirical Study of Chinese Manufacturing Firms.Unpublished doctoral dissertation, University of Groningen, Groningen, Netherlands.

Zou, P. X.W., Zhang,G., and Wang, J. (2006). Identifying key risks in construction manufacturing firmss: life cycle and stakeholder perspectives. www.prress.net/papers/Zou_risks-construAccessed 4/9/2012




DOI: http://dx.doi.org/10.61426/sjbcm.v4i2.482

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

PAST ISSUES:
20242023202220212020201920182017201620152014
Vol 11, No 4 [2024]Vol 10, No 4 [2023]Vol 9, No 4 [2022]Vol 8, No 4 [2021]Vol 7, No 4 [2020]Vol 6, No 4 [2019]Vol 5, No 4 [2018]Vol 4, No 4 [2017]Vol 3, No 4 [2016]Vol 2, No 2 [2015]Vol 1, No 2 [2014]
 Vol 11, No 3 [2024] Vol 10, No 3 [2023] Vol 9, No 3 [2022]Vol 8, No 3 [2021]Vol 7, No 3 [2020]Vol 6, No 3 [2019]Vol 5, No 3 [2019]Vol 4, No 3 [2017]Vol 3, No 3 [2016]Vol 2, No 1 [2015]Vol 1, No 1 [2014]
 Vol 11, No 2 [2024] Vol 10, No 2 [2023] Vol 9, No 2 [2022]Vol 8, No 2 [2021]Vol 7, No 2 [2020]Vol 6, No 2 [2019]Vol 5, No 2 [2018]Vol 4, No 2 [2017]Vol 3, No 2 [2016]  
 Vol 11, No 1 [2024] Vol 10, No 1 [2023] Vol 9, No 1 [2022]  Vol 8, No 1 [2021]Vol 7, No 1 [2020]Vol 6, No 1 [2019]Vol 5, No 1 [2018]Vol 4, No 1 [2017]Vol 3, No 1 [2016]   


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.